Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹4.2 L+₹8,810.50 (2.16%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | |
| 3 | L3₹4.3 L+₹18,372.90 (4.50%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | MR.BHARATHKISHORE, CONTRACTOR L2 | HARI CONSTRUCTION L1 | MR.G.PERUMALSAMY, CONTRACTOR L3 |
|---|---|---|---|---|---|---|
| 1.00PROVIDING CEMENT CONCRETE PAVEMENT AT KURUNJAKULAM VILLAGE IN PANCHAYA | ||||||
| 2.00 | Earthwork excavation in all classes of Soils and Sub soils except hard rock requiring 1 blasting including initial lead and lift, dressing the excavation upto bed level for Foundation as SS 20 B specification etc., complete | 9.34 | Cum | 197 ₹1,839.98 | 190 ₹1,774.6 Lowest | 250 ₹2,335 |
| 3.00 | Supply and filling Gravel from approved quarry for Base layer in layers not more 2 than 15mm thick, including cost of material, labour charges for filling, levelling, sectioning and compacting etc., complete as directed by officers. | 35.01 | Cum | 345 ₹12,078.45 | 230 ₹8,052.3 Lowest | 400 ₹14,004 |
| 4.00 | Cement concrete 1:4:8 mix using 40mm ISS HBGS metal laid in layers not more than 3 15cm thick inculding cost and coveyance of all materials to site, labour charges for mixing,laying.compacting and curing etc complete., For Foundation Base Concrete | 28.01 | Cum | 5,303 ₹1,48,537.03 | 4,900 ₹1,37,249 Lowest | 5,350 ₹1,49,853.5 |
| 5.00 | Supplying and erection Steel Centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab, Lintel, Beam, Column, Sunshade including cost and coveyance of all materials to site and all other incidental charges etc complete., | 120.59 | Cum | 365 ₹44,015.35 Lowest | 480 ₹57,883.2 | 400 ₹48,236 |
| 6.00 | Cement Concrete 1:3:6 mix using 20mm ISS HBG metal including cost and 5 conveyance of all materials to site, labour charges for mixing, laying, compacting and curing concrete etc., complete | 12.53 | Cum | 6,056 ₹75,881.68 | 5,800 ₹72,674 Lowest | 6,100 ₹76,433 |
| 7.00 | Cement Concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site, labour charges for mixing, laying, compacting and curing concrete etc., complete | 20.42 | Sqm | 6,600 ₹1,34,772 | 6,400 ₹1,30,688 Lowest | 6,650 ₹1,35,793 |
| 8.00 | Supllying and fixing Bituman Tarsheet 15mm thick for expansion joints at every 4.50m intervals inculding cost of material conveyance to site,cutting finishing etc., complete. | 0.79 | Sqm | 509 ₹402.11 | 500 ₹395 Lowest | 550 ₹434.5 |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
24 Sept 2026, 3:00 pmClosed
Block development office,BP, Kuruvikulam
Block development officer,BP, Kuruvikulam
BDOKRM/99/2026-A2 /PUGF26-27 /Providing cement concrete pavement at Kurunjankulam village in panchayat in kuruvikulam
2026_RDTN_703704_3
BDOKRM/99/2026-A2
Open Tender
Civil Works
Works
Kuruvikulam
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹5,000
28 Sept 2026
11 Sept 2026
24 Sept 2026
11 Sept 2026
24 Sept 2026
11 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | PROVIDING CEMENT CONCRETE PAVEMENT AT KURUNJAKULAM VILLAGE IN PANCHAYA | - | - | - | - |
| 2 | Earthwork excavation in all classes of Soils and Sub soils except hard rock requiring 1 blasting including initial lead and lift, dressing the excavation upto bed level for Foundation as SS 20 B specification etc., complete | 9.34 | Cum | 197.84 | ₹1,847.83 |
| 3 | Supply and filling Gravel from approved quarry for Base layer in layers not more 2 than 15mm thick, including cost of material, labour charges for filling, levelling, sectioning and compacting etc., complete as directed by officers. | 35.01 | Cum | 345.48 | ₹12,095.25 |
| 4 | Cement concrete 1:4:8 mix using 40mm ISS HBGS metal laid in layers not more than 3 15cm thick inculding cost and coveyance of all materials to site, labour charges for mixing,laying.compacting and curing etc complete., For Foundation Base Concrete | 28.01 | Cum | 5,303.03 | ₹1,48,537.87 |
| 5 | Supplying and erection Steel Centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab, Lintel, Beam, Column, Sunshade including cost and coveyance of all materials to site and all other incidental charges etc complete., | 120.59 | Cum | 365 | ₹44,015.35 |
| 6 | Cement Concrete 1:3:6 mix using 20mm ISS HBG metal including cost and 5 conveyance of all materials to site, labour charges for mixing, laying, compacting and curing concrete etc., complete | 12.53 | Cum | 6,056.06 | ₹75,882.43 |
| 7 | Cement Concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site, labour charges for mixing, laying, compacting and curing concrete etc., complete | 20.42 | Sqm | 6,600.04 | ₹1,34,772.82 |
| 8 | Supllying and fixing Bituman Tarsheet 15mm thick for expansion joints at every 4.50m intervals inculding cost of material conveyance to site,cutting finishing etc., complete. | 0.79 | Sqm | 509 | ₹402.11 |
stage.html
html • 0.02 MB
finance_845947.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.96 MB
BOQ_845947.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .