Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹85,600Accepted-Finance BHAGWATI NAGAR JAMMU | L1 | Accepted-Finance lowest | |
| 2 | L2₹89,000+₹3,400 (3.97%)Rejected-Finance HOUSING COLONY UDHAMPUR | UDHAMPUR | JAMMU AND KASHMIR | 182101 | L2 | Rejected-Finance not lowest | |
| 3 | L3₹1.1 L+₹20,400 (23.8%)Rejected-Finance | L3 | Rejected-Finance not lowest | |
| 4 | L4₹1.1 L+₹21,200 (24.8%)Rejected-Finance BYE PASS N H NEAR STATE BANK OF INDIA SIDHRA JAMMU | L4 | Rejected-Finance not lowest |
| Sl No | Description | Qty | Unit | GS ENGG WORKS L4 | M/S RAGHUNATH MECHANICAL AND ELECTRICAL ENGINEERING WORKS L3 | BEE AAR ENTERPRISES L1 | M.S J K HYDRAULIC ENGGG AND FABRICATOR WORKS L2 |
|---|---|---|---|---|---|---|---|
| 1.00Repairs to priming unit and 10 cusec pump of unit III along with allied works at LIS Dharap. | |||||||
| 1.01 | Dismantling the pump and motor of priming unit of10HP from the base frame, dragging out of the pump room at LIS Dharap. Dismantling the foot of 4” dia of priming unit. Extracting out of the canal with the help of manual labour using tools and tackles. Also dismantling the pump of 10 cusec discharge from the base frame of unit III. Loading in the load carrier with the help of manual labour using requisite tool and tackles for shifting to workshop for repair. Carriage back of pump, motor of priming unit along with repaired foot valves of 5” and 10 cusec pump of unit III in similar manner to road side at LIS Dharap, unloading with the help of manual labour and dragging to the place of installation using tools and tackle. Complete job includes cost of material, loading /unloading and carriage charges
Repairs to priming pump at workshop by way of extraction of damaged parts. The job involves repair to impeller by way of brazing, turning and finishing to size. Repair to pump shaft by way of re-metalling, turning and finishing to required size. P/F of new gland bush (GM/SS)-01 No., check /lock nuts 01 No, bearing 01No as per sample and new CI gland plates and sleeves 1 no. P/F after fabrication of new gland set as per sample along with new nuts and bolts, The job includes replacement of gland packing, greasing, rubber sheet joint, and cost of material and labour charges.
Dismantling of the damaged 10 HP motor at workshop, repairs to rotor by way of rebuilding, turning of the rotor shaft and finishing to bearing size, making new keyway for coupling, P/F of new bearings as per sample 02Nos and sleeves (DE & NDE). P/F of rubber star for coupling 01No of appropriate size Complete greasing of the bearings and assembling the rotor and stator.
Repair to foot valve of 5” f of priming unit by way of dismantling of foot valve at workshop, fabrication of resting plate out of MS plate by turning, boring, drilling holes as per size and making proper hinge arrangement for lifting plate. P/F of leather washer cut to size. Repair to strainer by way of welding and finishing to desired size.
Repairs to 10 cusec discharge pump at workshop by way of extracting the damaged parts. Repair to pump shaft by way of re mateling, turning, finishing, threading and cutting of keyways as per the required size. Repair to impeller by way of brazing turning and finishing to require size. P/F of new gland bushes-01 Nos., bearing 02 Nos and new check nuts, lock nuts 01 No. and cotter set to required size. Repair to gland brackets, suction body and bearing housings. Fitting the shaft assembly to pump body by inserting it from motor side and fitting to the pump body by P/F of rubber sheet joints cut to size and required nuts and bolts along with washer. Fitting the impeller from suction side and locking it with lock nut. Fitting the tail piece of pump body by P/F of rubber sheet joint cut to size and required nuts and bolts along with washers. Similarly fitting of suction piece by P/F 02 Nos rubber sheet joints to either side of suction piece cut to side along with new nuts and bolts with washer of required size. Placing the motor on base frame with the help of manual labour using tools and tackles. Coupling the motor with pump body by P/F of new coupling bolts and nuts along with bush of appropriate size. Filling of grease mixed with mobile oil in the bearing housing and replacement of gland packing after extracting out the old packing. The complete jobs includes cost of material, labour charges and hire charges of tools and tackles required along with testing and commissioning on full load at LIS Dharap.
Installation of the repaired priming pump motor set on base frame with proper greasing of motor and alignment after coupling it with motor and testing on full load. The job also involves aligning of suction and delivery end and fitting them with pump body by p/f of rubber sheet joint along with new nuts and bolts.
Fitting of the foot valve of 5” f with new nuts & bolts, gasket sheet to suction pipe. Also plugging the leakage of suction pipe by way of P/F fabricated bend along with flanges 02 nos welded to its ends of appropriate dia. P/F of 10feet suction pipe of 4” dia along with rubber sheet joint and flanges with required nuts, bolts and washer after extracting the old damage part of the suction pipe at LIS Dharap. The complete job includes cost of material, labour charges and hires charges of tools and tackles required along with testing and commissioning on full load at LIS Dharap.
The bidders/contractors are advice to visit the site before quoting the rates | 1 | Job | 1,06,800 ₹1,06,800 | 1,06,000 ₹1,06,000 | 85,600 ₹85,600 Lowest | 89,000 ₹89,000 |
| 1.02 | Rebate on Old Parts | 1 | Job | -2,136 ₹-2,136 | -2,120 ₹-2,120 | -1,712 ₹-1,712 | -1,780 ₹-1,780 |
Tender Value
₹1.1 L
EMD Value
₹2,140
Closing Date
15 Jul 2025, 2:00 pmClosed
XEN MID JAMMU
MID JAMMU
Repairs to priming unit and 10 cusec pump of unit III along with allied works at LIS Dharap.
2025_IFC_279649_1
MID/J/e-NIT/2025-26/24
Open Tender
Repair and Maintenance Works
Item Wise
7 days
Dharap
as per eNIT
8 documents required · 8 mandatory
₹200
Executive Engineer MID JAMMU
₹2,140
25 Nov 2025
24 Jun 2025
16 Jul 2025
24 Jun 2025
15 Jul 2025
25 Jun 2025
Repairs to priming unit and 10 cusec pump of unit III along with allied works at LIS Dharap.
Dismantling the pump and motor of priming unit of10HP from the base frame, dragging out of the pump room at LIS Dharap. Dismantling the foot of 4” dia of priming unit. Extracting out of the canal with the help of manual labour using tools and tackles. Also dismantling the pump of 10 cusec discharge from the base frame of unit III. Loading in the load carrier with the help of manual labour using requisite tool and tackles for shifting to workshop for repair. Carriage back of pump, motor of priming unit along with repaired foot valves of 5” and 10 cusec pump of unit III in similar manner to road side at LIS Dharap, unloading with the help of manual labour and dragging to the place of installation using tools and tackle. Complete job includes cost of material, loading /unloading and carriage charges Repairs to priming pump at workshop by way of extraction of damaged parts. The job involves repair to impeller by way of brazing, turning and finishing to size. Repair to pump shaft by way of re-metalling, turning and finishing to required size. P/F of new gland bush (GM/SS)-01 No., check /lock nuts 01 No, bearing 01No as per sample and new CI gland plates and sleeves 1 no. P/F after fabrication of new gland set as per sample along with new nuts and bolts, The job includes replacement of gland packing, greasing, rubber sheet joint, and cost of material and labour charges. Dismantling of the damaged 10 HP motor at workshop, repairs to rotor by way of rebuilding, turning of the rotor shaft and finishing to bearing size, making new keyway for coupling, P/F of new bearings as per sample 02Nos and sleeves (DE & NDE). P/F of rubber star for coupling 01No of appropriate size Complete greasing of the bearings and assembling the rotor and stator. Repair to foot valve of 5” f of priming unit by way of dismantling of foot valve at workshop, fabrication of resting plate out of MS plate by turning, boring, drilling holes as per size and making proper hinge arrangement for lifting plate. P/F of leather washer cut to size. Repair to strainer by way of welding and finishing to desired size. Repairs to 10 cusec discharge pump at workshop by way of extracting the damaged parts. Repair to pump shaft by way of re mateling, turning, finishing, threading and cutting of keyways as per the required size. Repair to impeller by way of brazing turning and finishing to require size. P/F of new gland bushes-01 Nos., bearing 02 Nos and new check nuts, lock nuts 01 No. and cotter set to required size. Repair to gland brackets, suction body and bearing housings. Fitting the shaft assembly to pump body by inserting it from motor side and fitting to the pump body by P/F of rubber sheet joints cut to size and required nuts and bolts along with washer. Fitting the impeller from suction side and locking it with lock nut. Fitting the tail piece of pump body by P/F of rubber sheet joint cut to size and required nuts and bolts along with washers. Similarly fitting of suction piece by P/F 02 Nos rubber sheet joints to either side of suction piece cut to side along with new nuts and bolts with washer of required size. Placing the motor on base frame with the help of manual labour using tools and tackles. Coupling the motor with pump body by P/F of new coupling bolts and nuts along with bush of appropriate size. Filling of grease mixed with mobile oil in the bearing housing and replacement of gland packing after extracting out the old packing. The complete jobs includes cost of material, labour charges and hire charges of tools and tackles required along with testing and commissioning on full load at LIS Dharap. Installation of the repaired priming pump motor set on base frame with proper greasing of motor and alignment after coupling it with motor and testing on full load. The job also involves aligning of suction and delivery end and fitting them with pump body by p/f of rubber sheet joint along with new nuts and bolts. Fitting of the foot valve of 5” f with new nuts & bolts, gasket sheet to suction pipe. Also plugging the leakage of suction pipe by way of P/F fabricated bend along with flanges 02 nos welded to its ends of appropriate dia. P/F of 10feet suction pipe of 4” dia along with rubber sheet joint and flanges with required nuts, bolts and washer after extracting the old damage part of the suction pipe at LIS Dharap. The complete job includes cost of material, labour charges and hires charges of tools and tackles required along with testing and commissioning on full load at LIS Dharap. The bidders/contractors are advice to visit the site before quoting the rates
Rebate on Old Parts
M.S J K HYDRAULIC ENGGG AND FABRICATOR WORKS (BID ID -2406801)
M/S RAGHUNATH MECHANICAL AND ELECTRICAL ENGINEERING WORKS (BID ID -2403107)
GS ENGG WORKS (BID ID -2398973)
BEE AAR ENTERPRISES
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .