Loading
Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.3 LAccepted-AOC 36 151 E 73 PERIYAR NAGAR THANGAMAPURIPATTINAM METTUR DAM 2 | METTUR DAM | TAMIL NADU | ₹13.3 L Quoted ₹11.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹11.8 LRejected-Finance 36 151 E 46 PERIYAR NAGAR THANGAMAPURIPATTENAM METTUR DAM 636 402 | METTUR DAM | SALEM | TAMIL NADU | 636402 | ₹11.8 L | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | RATHNA AND CO L2 | SSS ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00 | Removal of link between the power cylinder and dismantling of bearing covers, inspection of bearings, renewal of bearings if required, greasing and ensuring no mechanical struck up and restoration of link with power cylinder etc., in Burner cooling air dampers including charges for scaffolding etc., | 16 | Nos | 3,264 ₹52,224 | 3,262 ₹52,192 |
| 2.00 | Removal of link between the power cylinder and dismantling of bearing covers, inspection of bearings, renewal of bearings if required, greasing and ensuring no mechanical struck up and restoration of link with power cylinder etc., in Secondary air dampers in each burner elevations. | 20 | Nos | 6,525 ₹1.3 L | 6,524 ₹1.3 L |
| 3.00 | Releasing struck up in tertiary air dampers of Boiler burner assembly, including charges for consumables and hire charges for T&Ps & renewal of damaged guide pipe if any. | 10 | nos | 15,562 ₹1.6 L | 15,559 ₹1.6 L |
| 4.00 | Ensuring the freeness for operation in tertiary air dampers of Boiler burner assembly, including charges for consumables and hire charges for T&Ps. | 30 | nos | 3,755 ₹1.1 L | 3,753 ₹1.1 L |
| 5.00 | Ensuring the freeness for operation in OFA dampers of Boiler burner assembly, including charges for consumables and hire charges for T&Ps. | 10 | Nos | 3,755 ₹37,550 | 3,753 ₹37,530 |
| 6.00 | Patch up welding works in wornout area (or) crack portion of flaps in secondary air dampers, including charges for consumables and hire charges for T&Ps | 30 | RM | 743 ₹22,290 | 742 ₹22,260 |
| 7.00 | Removal of insulation double layer (60mm + 60mm = 120mm thick) for approach secondary air dampers left & right side of (each area) in Boiler area and refixing after completion of works. | 60 | m2 | 2,688 ₹1.6 L | 2,686 ₹1.6 L |
| 8.00 | Removing, cutting, welding the eroded / damaged portion of Flame scanner assembly with SS Wire Braided Flexible Hose from HFO, LDO & Coal in burner as per request of C&I Division & as per site condition during inspection of forthcoming AOH 25-26 and reassemble after reconditioning works. | 20 | Nos | 13,865 ₹2.8 L | 13,863 ₹2.8 L |
| 9.00 | Fabrication and erection of Structures in outside of secondary duct in boiler area for burner air cooling damper actuator mounting position is shifted to approach area for access the actuator instead of over the secondary duct as per request of C&I Division., which involves marking, cutting, welding and fabrication of platforms including painting, T&P's Hire and consumables charges. (Required quantity of Iron and Steel material will be supplied by firm) | 1.6 | Ton | 72,590 ₹1.2 L | 72,587 ₹1.2 L |
| 10.00 | Supply of MS Channel (Size: 100 x 50) | 0.4 | Ton | 57,004 ₹22,801.60 | 57,002 ₹22,800.80 |
Tender Value
Refer Docs
EMD Value
₹13,900
Closing Date
18 Aug 2025, 2:00 pmClosed
CE/ MTPS2
O/o. CE/ MTPS2
Overhauling of Secondary Air Dampers
2025_EB_590992_1
OT 88 Overhauling of Secondary Air Dampers
Open Tender
Maintenance Works
25 days
MTPS2
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹13,900
Yes
11 Mar 2026
11 Aug 2025
19 Aug 2025
11 Aug 2025
18 Aug 2025
11 Aug 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid