Short Term measure through Placement of Gabions by Mechanically Woven Double Twisted Hexagonal Wire Mesh Boxes filled with Sand Filled HDPE Bags and repair of existing Gabions at the Downstream Bed of Tilpara Mihirlal Barrage
2026_IWD_1025574_1
WBIW/SE/CE(N)/NIT-3(e)/2026-27
Open Tender
CIVIL WORKS
120 days
Suri-I
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹5.7 L
Yes
30 May 2026
30 May 2026
23 Jun 2026
30 May 2026
22 Jun 2026
30 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing & making Gabion structure with
Mechanically Woven Double Twisted Hexagonal
Shaped Wire mesh Gabion Boxes as per IS
16014:2012,MORTHClause2500, of required size,
MeshType10x12(D=100mmwithtoleranceof±2%),
Zinc+PVCcoated,Meshwirediameter2.7/3.7mm
(ID/OD), tying with lacing wire of diameter
2.2/3.2mm(ID/OD), supplied @3% by weight of
Gabionboxes, filledwith sand filledHighDensity
Polyethylene (HDPE) bagof size0.84mx0.38m
conforming toBIS : 14252 : 2015, asperdrawing,
includingcostof filledupHDPEbags,placinginside
Gabionstructureall complete, asperdirectionsof
Engineer- in-charge.
Size of Gabion 1.50 m x 1.50 m x 0.50 m | 527 | Each | 4,538.37 | ₹23,91,720.99 |
| 2 | Supplying, fitting and fixing mesh of size 150mmx
150mm placedover topof gabionof size2.50mx
2.50m made of 5.5mm dia single strand wire
knotting by 18 HWGG.Iwire includingcost of all
labour, single strand steel wire and G.I wire
complete in all respect to avoid dislodging of
bouldersduetoheavywater thrust inwater falling
zone as per direction of Engg. In Charge. | 1 | sqM | 194.52 | ₹194.5 |
| 3 | Repairing of existing polypropylene Gabion of mesh
size 145x145 if damaged replace with new mesh of
any size and fix/ tied with surrounding Gabions
including cutting the wires of reforcement and
damaged polypropylene mesh fill the depression
with boulders and refitting the Gabion mesh with
the new one and refitting the top reinforcement
including cost and carriage of all materials,toolsand
equipments but excluding the supply of boulder for
filling as per instruction of E.I.C. | 3,906.25 | SqM | 356.06 | ₹13,90,859.38 |
| 4 | Labour charges for collecting loose scattered laterite and stone boulders from slope ,bed or apron and stacking the same above ground level within a lead of 100metre and all lifts as per direction of the Engineer - in-charge. | 36,818.46 | CuM | 244.32 | ₹89,95,486.15 |
| 5 | Labour charge for dumping/ laying of Laterite/ Stone Boulders /Shingles/ Brick Bats, from stack of work site with all leads and lifts in water or spreading the same on the slope of the bank of River/Sea or the slope of the embankment or in the River/Sea bed to
an uniform thickness as per direction of the Engineer-in-charge including cost of all accessories and other incidental charges.
(a) Boulder 20 kg & above where boats are not necessary. | 36,818.46 | CuM | 241.94 | ₹89,07,858.21 |
| 6 | Supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incedental charges etc. all complete
(capacity 50 kg). | 24,482 | Each | 7.15 | ₹1,75,046.3 |
| 7 | Supplying Nylon cage netting 1metre x1metre x1metre size with knot having mesh size 17.5cm x17.5cm constructed with nylon thread(210x24) having tensile strength not less than 250Kg. /sq. cm. including
carriage, delivery and stacking at site inclusive of all taxes complete. | 3,200 | Each | 139.44 | ₹4,46,208 |
| 8 | Labour charges for dumping and placing in position properly filled in Nylon crates with filled in gunny/poly cementbags(minimum 25nos. having capacity 50kg)with local earth or sand, sewing and tying the
crate with nylon wire within a lead of 150m.and all lifts in river slope or bed by cutting trenches upto 50cms depth, if necessary, or by boat ncluding cost of hire charges of boat, boatmen and other necessary
equipments and also including cost of bags, carriage and charge of filling bags with earth / sand but excluding cost of nylon crate as per direction of the Engineer – in – Charge.
NB:-Volume of eachearth/ sand filled bags should not be less than 0.028 m3.
Size of Nylon crate is 1metre X 1metre X 1metre.
(a) Where boats are not necessary | 3,200 | Each | 498.17 | ₹15,94,144 |
| 9 | Labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates (stone/brick) and sewing as done in case of cement bags,( tying with a knot after filling will not be accepted),and stacking with in a lead of 30metre as perdirectionofEngr-in-charge(cost is excluding the cost of any types of filling materials).
NB:-Volumeofearth/ sandfilledbagsshouldnot be less than0.028 cum/ bag. | 24,482 | Each Bag | 8.34 | ₹2,04,179.88 |
| 10 | Dumping in position earth / sand filled gunny /polybags (capacity 50 kg) within a lead of 30 metre inclusive of all lifts. | 24,482 | Each Bag | 3.58 | ₹87,645.56 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.00 MB
2911n.pdf
Tender Documents • 1.15 MB
BarChart01.pdf
Tender Documents • 0.21 MB
Drawing01.pdf
Tender Documents • 1.42 MB
BOQ_2520369.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid