Elect. 400 K.V S.S Div Banda
WORK OF PROVIDING LAYING OF WATER SUPPLY CLEANING OF SUMPS DRAINAGE AND MISSCELANEOUS WORK AT ELECTRICITY 400 KV SUBSTATION BANDA
2021_UPTCL_593407_1
T-18/E.400KVS/SDIV.(B)/2021-22
Open Tender
Electrical Works
Lump-sum
90 days
Elect. 400 K.V S.S Banda
Detail Enclosed
2 documents required · 2 mandatory
₹236
Executive Engineer
₹4,000
16 Jun 2021
8 Jun 2021
15 Jun 2021
8 Jun 2021
15 Jun 2021
8 Jun 2021
8 Jun 2021 - 15 Jun 2021
Amount
Details of Work.
Cleaning of sump drain of various sizes such as 2.5’ x 4’, 2’ x 3’ and 1.5’ x 2’ wide & deep in peripheral area of 400 KV, 220 KV switchyard & control room area by taking out of sludge, mud waste etc. including picking out of grass and wild growths on the both side wall & bottom of the drains, then disposal of the sludge, mud, waste etc. taken out from it at suitable places at a distance of 30 Meter in the switchyard area, complete with all cost of labour, material and T&P required for proper completion of work.
Cleaning of inspection chamber / siphon by disposal of debris, mud by uprooting of grass and wild growths then scraping on all the 4 walls & bottom with all cost of labour, material and T&P required for proper completion of the work.
Cleaning of sump pump house wells in 400 KV Switchyard, behind store & in the colony of Sub Station by taking out the logged water, mud, sludge, waste etc. with the help of bucket, Tashla, Phawara, spade, rope etc. then disposal of the above mud, sludge waste etc. taken out of the sump pump house wells at the suitable places in the Sub Station premises.
Replacement of foot valve, steel wire, strainer fitted in the suction pipe line of the sump pumps of the sump pump house wells in colony by new ones if found defective, with all cost of men, materials and T&P etc. required for the job.
Disposal of above debris / mud / grass etc. outside the switchyard area including cartage with all cost of labour, material & T&P etc. required for proper completion of the work.
Replacement of existing 4” dia check valve fixed in 4” dia G.I. Pipe in sump well with leak proof to retain water.
Making arrangement of 4" pipeline from outlet of Sump motor to Mulsifyer water tank to store rain water.
Providing & Fixing of 3- phase 3 HP Motor (Standard make)
Making arrangement for bore with 3" PVC pipeline.
Work of Providing & laying 4" G.I pipe line from Bore to connection point in main pipeline with 02 nos. adjustable ball.
Providing & Changing of damaged 4" valve of standad make.
Work of providing & laying of different type of water pipeline
Work of providing & laying of water pipeline of Size 3/4" PVC water pipeline (including T, elbow, jointer, tap etc required for proper connection)
Work of providing & laying of water pipeline of Size 1/2" PVC water pipeline (including T, elbow, jointer, tap etc required for proper connection)
Rates qouted by the bidders shall be without taxes. Taxes applicable if any to paid extra
M/S Bharat Construction
M/S V.K.T. SYSTEMS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .