| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.5 LAccepted-AOC | ₹36.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹37.0 LRejected-AOC 702 A AL HUSSAIN BLDG MOMIN NAGAR PATEL ESTATE ROAD JOGESHWARI W MUMBAI MAHARASHTRA 400102 UDYAM MH 18 0040961 27ABJFM5468N1ZG R M MII STATUS AS VERIFIED | MUMBAI SUBURBAN | MAHARASHTRA | 400102 | ₹37.0 L | L2 | Rejected-AOC L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Work Done Certificate Not as per NIT |
| Sl No | Description | Qty | Unit | SWANIK STORAGE PVT. LTD L1 | MYRIAD STORAGE SYSTEM LLP L2 |
|---|---|---|---|---|---|
| 1.01 | Providing and fixing in position Mechanical Mobile Compactor with Aluminum track, Belt pulley mechanism and Ramp with Wooden platform with capacity of 60kg UDL/shelf. No hacking of floor required for installation and easy relocation. Complete track assembly is on self-suspended design and suitable for any surface like Cement, Tiles, Carpet, etc. Total Size of the compactor – (Height) 2600mm x (Width) 4650mm x (Depth) 2840mm | 1 | Number | 17,97,848 ₹17,97,848 Lowest | 18,20,833 ₹18,20,833 |
| 1.02 | Providing and fixing in position Mechanical Mobile Compactor with Aluminum track, Belt pulley mechanism and Ramp with Wooden platform with capacity of 60kg UDL/shelf. No hacking of floor required for installation and easy relocation. Complete track assembly is on self-suspended design and suitable for any surface like Cement, Tiles, Carpet, etc. Total Size of the compactor – (Height) 2600mm x (Width) 3650mm x (Depth) 1840mm | 1 | Number | 9,27,108 ₹9,27,108 Lowest | 9,38,632 ₹9,38,632 |
| 1.03 | Full Height Steel Storage - Providing and fixing Openable Steel Storage of W 900 mm x D 450 mm x 2100 mm Ht, with 4 adjustable shelves, Complete body & shutter made in 0.8mm thick & Top in 2mm thick CRCA,4 Shutter to be mounted with the help of cup hinges, and 4 adjustable levelers, entire storage in powder coated finish with 60 to 80 microns as per drawing | 16 | Number | 28,867 ₹4,61,872 | 25,780 ₹4,12,480 Lowest |
| 1.04 | Removing wooden or A.C. partition including frame work and stack-ing the materials as with all leads, lifts etc. complete. | 10 | Square Meter | 40 ₹400 Lowest | 150 ₹1,500 |
| 1.05 | Dismantling & Assembly of all Bays. Opening of Each front panel and removing mechanism and installing it back. Removing, cleaning, servicing, oiling all the hardware. Replacement of Hand wheel and chain. Removing, cleaning, servicing and oiling mechanism, track, wheels. Overall compactor alignment with Track and wheel for smooth operation. Removing all the material from the compactor and putting it back. Removing tracks and installing it back with proper fittings. Inclusive of Required Hardware. | 1 | per job | 2,87,722 ₹2,87,722 Lowest | 3,20,000 ₹3,20,000 |
| 2.00 | Dismantling & Assembly of all Bays. Opening of Each front panel and removing push pull handle and installing it back. Removing, cleaning, servicing, oiling all the hardware. Removing, cleaning, servicing and oiling track, wheels. Overall compactor alignment with Track and wheel for smooth operation. Removing all the material from the compactor and putting it back. Removing tracks and installing it back with proper fittings. Inclusive of required Hardware | 1 | per job | 1,77,891 ₹1,77,891 Lowest | 2,03,500 ₹2,03,500 |
Tender Value
Refer Docs
EMD Value
₹36,600
Closing Date
19 May 2026, 11:00 amClosed
Superintending Engineer, MIDC Circle Office, CSN
Superintending Engineer, MIDC Circle Office, CSN
Chhatrapati Sambhajinagar Industrial area. Providing And Installation ofmechanical mobile compactor storage system at storeroom at Regional Office ( Udyog Wardhini) Building.
2026_MIDC_1301575_1
06/A/05
Open Tender
Civil Works
Item Rate
CSN
Please refer Tender documents.
2 documents required · 2 mandatory
₹8,850
₹36,600
22 Aug 2026
9 May 2026
21 May 2026
9 May 2026
19 May 2026
12 May 2026
9 May 2026 - 11 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Providing and fixing in position Mechanical Mobile Compactor with Aluminum track, Belt pulley mechanism and Ramp with Wooden platform with capacity of 60kg UDL/shelf. No hacking of floor required for installation and easy relocation. Complete track assembly is on self-suspended design and suitable for any surface like Cement, Tiles, Carpet, etc. Total Size of the compactor – (Height) 2600mm x (Width) 4650mm x (Depth) 2840mm | 1 | Number | - | - |
| 1.02 | Providing and fixing in position Mechanical Mobile Compactor with Aluminum track, Belt pulley mechanism and Ramp with Wooden platform with capacity of 60kg UDL/shelf. No hacking of floor required for installation and easy relocation. Complete track assembly is on self-suspended design and suitable for any surface like Cement, Tiles, Carpet, etc. Total Size of the compactor – (Height) 2600mm x (Width) 3650mm x (Depth) 1840mm | 1 | Number | - | - |
| 1.03 | Full Height Steel Storage - Providing and fixing Openable Steel Storage of W 900 mm x D 450 mm x 2100 mm Ht, with 4 adjustable shelves, Complete body & shutter made in 0.8mm thick & Top in 2mm thick CRCA,4 Shutter to be mounted with the help of cup hinges, and 4 adjustable levelers, entire storage in powder coated finish with 60 to 80 microns as per drawing | 16 | Number | - | - |
| 1.04 | Removing wooden or A.C. partition including frame work and stack-ing the materials as with all leads, lifts etc. complete. | 10 | Square Meter | - | - |
| 1.05 | Dismantling & Assembly of all Bays. Opening of Each front panel and removing mechanism and installing it back. Removing, cleaning, servicing, oiling all the hardware. Replacement of Hand wheel and chain. Removing, cleaning, servicing and oiling mechanism, track, wheels. Overall compactor alignment with Track and wheel for smooth operation. Removing all the material from the compactor and putting it back. Removing tracks and installing it back with proper fittings. Inclusive of Required Hardware. | 1 | per job | - | - |
| 2 | Dismantling & Assembly of all Bays. Opening of Each front panel and removing push pull handle and installing it back. Removing, cleaning, servicing, oiling all the hardware. Removing, cleaning, servicing and oiling track, wheels. Overall compactor alignment with Track and wheel for smooth operation. Removing all the material from the compactor and putting it back. Removing tracks and installing it back with proper fittings. Inclusive of required Hardware | 1 | per job | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.98 MB
BOQ_2234970.xls
BOQ • 0.28 MB
ItemSpecification.pdf
Other Document • 0.02 MB
TenderDocument.pdf
Tender Documents • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].