Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.9 LAccepted-AOC KUMARDIHI PANDEESHWAR BARDDHAMAN BARDDHAMAN 713363 WEST BENGAL INDIA | BARDDHAMAN | BARDDHAMAN | WEST BENGAL | 713363 | ₹5.9 L | L1 | Accepted-AOC As per TCR |
| 2 | L2₹6.1 LRejected-Finance VILL ETHORA P O ETHORA DIST PASCHIM BARDHAMAN PIN 713359 | PASCHIM BARDHAMAN | WEST BENGAL | 713359 | ₹6.1 L | L2 | Rejected-Finance TCR |
| Sl No | Description | Qty | Unit | GOUTAM MUKHERJEE L1 | MUKHERJEE ENTERPRISE L2 |
|---|---|---|---|---|---|
| 1.00Item Description/ Heading | |||||
| 2.00 | Drilling hole in stone along roof for drive head distance 26.0m (129 holes)
Loading point along 0L from 0D to 5D (160 holes)
Drilling hole in stone along roof for drive head distance 15.0m (75 holes)
Loading point along 2D from 0L to 6WL (192 holes)
Total = 556 holes | 556 | Nos | 104.67 ₹58,196.52 | 106 ₹58,936 |
| 3.00 | Roof Bolting for re-support (per junction 40 Nos x 6 = 240 nos) | 440 | Nos | 174.45 ₹76,758 | 180 ₹79,200 |
| 4.00 | Stone Fall cleaning and staking in regular pack (Total 295.62m3) | 295.62 | m3 | 451.19 ₹1,33,380.79 | 460 ₹1,35,985.2 |
| 5.00 | Cutting Coal for belt establishment clearance 11 Pillars (85.80 m3) | 143 | m3 | 1,220.02 ₹1,74,462.86 | 1,230 ₹1,75,890 |
| 6.00 | Lead at U.G (200-250ft) 295.62m3/0.62m3/tub ie 477 Tub | 477 | Tub | 126.21 ₹60,202.17 | 140 ₹66,780 |
| 7.00 | Total impact of GST for the purpose of CTC | 1 | Nos | 90,540.06 ₹90,540.06 | 93,022.42 ₹93,022.42 |
Tender Value
₹5.9 L
EMD Value
₹7,500
Closing Date
6 Oct 2025, 6:00 pmClosed
General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
Heightening of roof for installation of discharge belt at OD OD-SD and 2D OL 6WL respectively for OD (Panel No1) development District in RVIIC seam at no 3and 4 pit unit of Kumardihi A Colliery.
2025_ECL_342049_1
ECL/GM/BA/E TENDER/25-26/Min/42 Dt 21.08.2025
Open Tender
Miscellaneous Works
120 days
Kumardihi A Colliery
Please refer to NIT document
4 documents required · 4 mandatory
₹7,500
28 Jan 2026
21 Aug 2025
7 Oct 2025
21 Aug 2025
6 Oct 2025
21 Aug 2025
21 Aug 2025 - 25 Aug 2025
Amount
Item Description/ Heading
Drilling hole in stone along roof for drive head distance 26.0m (129 holes) Loading point along 0L from 0D to 5D (160 holes) Drilling hole in stone along roof for drive head distance 15.0m (75 holes) Loading point along 2D from 0L to 6WL (192 holes) Total = 556 holes
Roof Bolting for re-support (per junction 40 Nos x 6 = 240 nos)
Stone Fall cleaning and staking in regular pack (Total 295.62m3)
Cutting Coal for belt establishment clearance 11 Pillars (85.80 m3)
Lead at U.G (200-250ft) 295.62m3/0.62m3/tub ie 477 Tub
Total impact of GST for the purpose of CTC
MUKHERJEE ENTERPRISE (BID ID -1179137)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid