Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.4 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹12.9 L+₹1.5 L (13.0%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹13.6 L+₹2.1 L (18.7%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹14.1 L+₹2.6 L (23.0%)Rejected-Finance | L4 | Rejected-Finance L4 | |
| 5 | L5₹14.6 L+₹3.2 L (28.0%)Rejected-Finance | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | PRAGATI ASSOCIATES L5 | DEV CONSTRUCTION L3 | BHAI JI CONSTRUCTION L1 | OM CONSTRUCTIONS L2 | M/S SHRI BALAJI CONSTRUCTION L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in embankment by power transported earth with a lead up to 4 KM including excavation, loading, unloading,dressing and all lifts complete | 850 | Cum. | 146 ₹1,24,100 Lowest | 316.71 ₹2,69,203.5 | 266.08 ₹2,26,164.17 | 250 ₹2,12,500 | 327.66 ₹2,78,509.3 |
| 2.00 | Dewatering for Foundation E/W,Concrete & Brick Work including Boring Pump Set / fuel and Pump Operating staff etc incuding all. | 4,800 | Hrs./HP | 27.5 ₹1,32,000 | 32.4 ₹1,55,520 | 27.22 ₹1,30,656 | 20 ₹96,000 Lowest | 33.52 ₹1,60,896 |
| 3.00 | Earth work excavation in foundation including all lead & lift cost of labour, material, T&P etc. required for proper completion of the work. | 129.5 | Cum. | 90 ₹11,655 | 89.91 ₹11,643.34 | 75.54 ₹9,781.85 | 30 ₹3,885 Lowest | 93.02 ₹12,045.83 |
| 4.00 | Laying C.C 1:3:6 in foundation with stone ballast 20-40 mm size including all cost of labour, material, T&P etc. required for proper completion of the work. | 60 | Cum. | 5,800 ₹3,48,000 | 3,384.99 ₹2,03,099.4 | 2,844.22 ₹1,70,653.07 Lowest | 3,800 ₹2,28,000 | 3,502.5 ₹2,10,150 |
| 5.00 | Ist class Brick work in 1:4 C.M including all cost of labour, material, T&P etc. required for proper completion of the work. | 98.5 | Cum. | 4,800 ₹4,72,800 | 4,477.03 ₹4,40,987.45 | 3,761.26 ₹3,70,484.07 Lowest | 5,000 ₹4,92,500 | 4,631.79 ₹4,56,231.32 |
| 6.00 | Centering and shuttering for R.C.C work including all cost of labour, material, T&P etc. required for proper completion of the work. | 53.8 | Sqm | 850 ₹45,730 | 680.4 ₹36,605.52 | 571.62 ₹30,753.16 | 400 ₹21,520 Lowest | 703.92 ₹37,870.9 |
| 7.00 | Providing reinforcement i/c cutting, bending, binding, placing properly with also including cost of binding wire required for proper completion of the work. | 1.09 | M.T | 71,000 ₹77,390 | 55,774.87 ₹60,794.61 | 48,674.26 ₹53,054.94 Lowest | 68,000 ₹74,120 | 59,772.02 ₹65,151.5 |
| 8.00 | R.C.C 1:1.5:3 including all cost of labour, material, T&P etc. required for proper completion of the work. | 30.4 | Cum | 7,100 ₹2,15,840 | 4,796.49 ₹1,45,813.3 | 4,035 ₹1,22,664 Lowest | 4,800 ₹1,45,920 | 4,962.3 ₹1,50,853.92 |
| 9.00 | Struck cement pointing in 1:2 C.M including all cost of labour, material, T&P etc. required for proper completion of the work. | 125.5 | Sqm | 128 ₹16,064 | 112.27 ₹14,089.38 | 94.32 ₹11,836.82 | 30 ₹3,765 Lowest | 116.14 ₹14,575.57 |
| 10.00 | Supplying and fixing PVC pipe 75mm dia and for drainage system including all cost of labour, material, T&P etc. required for proper completion of the work. | 4 | Mtr. | 250 ₹1,000 | 93.15 ₹372.6 | 78.26 ₹313.03 Lowest | 100 ₹400 | 96.37 ₹385.48 |
Tender Value
₹16.9 L
EMD Value
₹34,000
Closing Date
25 May 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE, DD-1, Meerut
O/O EE, DD-1, Meerut
As per NIT
2026_UPIDC_1150395_4
01/EE/2026-27
Open Tender
Civil Works
Piece-work
Muzaffarnagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹34,000
3 Oct 2026
19 May 2026
25 May 2026
19 May 2026
25 May 2026
19 May 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in embankment by power transported earth with a lead up to 4 KM including excavation, loading, unloading,dressing and all lifts complete | 850 | Cum. | - | - |
| 2 | Dewatering for Foundation E/W,Concrete & Brick Work including Boring Pump Set / fuel and Pump Operating staff etc incuding all. | 4,800 | Hrs./HP | - | - |
| 3 | Earth work excavation in foundation including all lead & lift cost of labour, material, T&P etc. required for proper completion of the work. | 129.5 | Cum. | - | - |
| 4 | Laying C.C 1:3:6 in foundation with stone ballast 20-40 mm size including all cost of labour, material, T&P etc. required for proper completion of the work. | 60 | Cum. | - | - |
| 5 | Ist class Brick work in 1:4 C.M including all cost of labour, material, T&P etc. required for proper completion of the work. | 98.5 | Cum. | - | - |
| 6 | Centering and shuttering for R.C.C work including all cost of labour, material, T&P etc. required for proper completion of the work. | 53.8 | Sqm | - | - |
| 7 | Providing reinforcement i/c cutting, bending, binding, placing properly with also including cost of binding wire required for proper completion of the work. | 1.09 | M.T | - | - |
| 8 | R.C.C 1:1.5:3 including all cost of labour, material, T&P etc. required for proper completion of the work. | 30.4 | Cum | - | - |
| 9 | Struck cement pointing in 1:2 C.M including all cost of labour, material, T&P etc. required for proper completion of the work. | 125.5 | Sqm | - | - |
| 10 | Supplying and fixing PVC pipe 75mm dia and for drainage system including all cost of labour, material, T&P etc. required for proper completion of the work. | 4 | Mtr. | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.54 MB
TD4.pdf
Tender Documents • 1.56 MB
BOQ_2154057.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .