| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-Finance | ₹4.9 L | L1 | Accepted-Finance L1 Accept |
| 2 | L2₹5.0 LRejected-Finance | ₹5.0 L | L2 | Rejected-Finance L2 Reject |
| Sl No | Description | Qty | Unit | M. SIRANJEEVI L2 | AjithkKumar L1 |
|---|---|---|---|---|---|
| 1.00Construction of Bus Shelter near Pajanai Madam in Sengalur Panchayat | |||||
| 2.00 | Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation. | 7.14 | cum | 265 ₹1,892.10 | 263.5 ₹1,881.39 |
| 3.00 | Supplying and filling in foundation and basement with FILLING M.SAND in layers not more 15 cm thick in layers, rammed watered and compacted., complete complying to standard specification. | 2.57 | cum | 2,040 ₹5,242.80 | 2,035.5 ₹5,231.24 |
| 4.00 | Cement Concrete 1:4:8 Using 40mm gauge Hand Broken Granite stone jelly for foundation including watering whenever necessary and jaid in layers not more than 15 cm thick compacting etc., complete complying within standard specification and as directed. | 2.84 | cum | 5,595 ₹15,889.80 | 5,591.5 ₹15,879.86 |
| 5.00 | R.C.C. 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges etc., complete. | 6.71 | Cum | 9,230 ₹61,933.30 | 9,225.5 ₹61,903.11 |
| 6.00 | Supplying and errecting centring for sides and soffits of all RCC works including cost and conveyance of all materials to site and labour charges etc. complete | 66.17 | Sqm | 1,120 ₹74,110.40 | 1,095 ₹72,456.15 |
| 7.00 | Supplying fabricating and placing in position mild steel or ribbed for steel and all roinforced cement concrete works as per the design given including cost of steel and binding wire in all foors etc., complete | 0.55 | MT | 92,500 ₹50,875 | 91,940 ₹50,567 |
| 8.00 | Brick work in cement mortar 1:5 (one cement and five sand) using country bricks ground moulded of size 23 x 11 x 7 cm. For the following including curing etc. complete complying with standard specification. For super structure in Ground floor. | 11.99 | Cum | 6,165 ₹73,918.35 | 6,159 ₹73,846.41 |
| 9.00 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete | 29.54 | Sq.m | 310 ₹9,157.40 | 308 ₹9,098.32 |
| 10.00 | Plastering with cement mortor 1:5 (one cement and five sand) 12mm thick in all floor including curing etc. complete complying with standard specification. | 78.13 | Sq.m | 288 ₹22,501.44 | 286.5 ₹22,384.25 |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
10 Feb 2026, 3:00 pmClosed
Bdo,Kunandarkoil
Pt.Union Office,Kunnandarkoil
Construction of Bus Shelter near Pajanai Madam in Sengalur Panchayat
2026_RDTN_651712_1
Kkoil/MLACDS/Work-2
Open Tender
Civil Works
Kunnandarkoil
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹5,000
27 Mar 2026
5 Feb 2026
10 Feb 2026
5 Feb 2026
10 Feb 2026
5 Feb 2026
Construction of Bus Shelter near Pajanai Madam in Sengalur Panchayat
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation.
Supplying and filling in foundation and basement with FILLING M.SAND in layers not more 15 cm thick in layers, rammed watered and compacted., complete complying to standard specification.
Cement Concrete 1:4:8 Using 40mm gauge Hand Broken Granite stone jelly for foundation including watering whenever necessary and jaid in layers not more than 15 cm thick compacting etc., complete complying within standard specification and as directed.
R.C.C. 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Supplying and errecting centring for sides and soffits of all RCC works including cost and conveyance of all materials to site and labour charges etc. complete
Supplying fabricating and placing in position mild steel or ribbed for steel and all roinforced cement concrete works as per the design given including cost of steel and binding wire in all foors etc., complete
Brick work in cement mortar 1:5 (one cement and five sand) using country bricks ground moulded of size 23 x 11 x 7 cm. For the following including curing etc. complete complying with standard specification. For super structure in Ground floor.
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete
Plastering with cement mortor 1:5 (one cement and five sand) 12mm thick in all floor including curing etc. complete complying with standard specification.
Supply and Fixing of Ceramic Tiles including cost and conveyance of all materials to site and all labour charges etc. complete
SUPPLY AND FIXING OF GLAZED TILES including cost and conveyance of all materials to site and all labour charges etc. complete
Weathering course with brick jelly lime concrete using 20mm brick jelly with Roof Top of Pressed Tiles including cost and conveyance cost of al materials to work site and labour charges and finishing with one layer of pressed tiles of size 20 cm x 20 cm x 20mm embadded in cement morter 1:3 mix with water profing course and pointed with same mixed morter to full depth of tiles etc., complete.
White washing TWO coat using best freshly burnt white shell lime in all the floors, including cost of lime blue powder, fevicol type gums, brushes, scaffolding charges etc., complete with standard specification.
Distember two coats over one coat of primary coat including cleaning preparing the surface one coat of primer.
Painting two coats with Exterior emulsion over one coat of primary coat including cleaning preparing the surface
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 1 & 16 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
Kkoil-Doc--2.pdf
Tender Documents • 0.17 MB
BOQ_781480.xls
BOQ • 0.50 MB
Download all tender documents and submit your bid