| 1 | L1₹12.8 LAccepted-AOC | L1 | Accepted-AOC Accept | |
| 2 | L2₹13.2 L+₹40,737.77 (3.18%)Rejected-Finance | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | R NATARAJAN L1 | CHINNA BOYAN L2 |
|---|---|---|---|---|---|
| 1.00Name of Work Construction of New 60000 Lt Sump at kamatchi nagar in Kongarpalayam H/o Kongarpalayam | |||||
| 2.00Construction of 60000 lit sump as per type design | |||||
| 3.00Earthwork excavation and deposting on bank with an initial lead and lift for 10m and the following classfication of soils. | |||||
| 4.00 | First depth of 2.00m below G.L | 65.38 | Cum | 224 ₹14,645.12 Lowest | 245 ₹16,018.1 |
| 5.00 | Second depth of 1.00m below G.L | 32.69 | Cum | 333 ₹10,885.77 Lowest | 355 ₹11,604.95 |
| 6.00 | PCC 1:4:8mix Using 40mm HBS metal for leveling course for fountation. including cost of metal, curing and finishing etc.For items 1.5 m to 4.5 m blow GL | 4.9 | Cum | 5,177 ₹25,367.3 Lowest | 5,185 ₹25,406.5 |
| 7.00RCC 1 : 11/2 :3 mix Using 20HBS stone for the following members. Including cost of mixing, placing the concrete, curing etc. Upto 1.50m depth below G.L | |||||
| 8.00 | Upto 1.50m depth below G.L | 3.82 | Cum | 8,580 ₹32,775.6 Lowest | 8,595 ₹32,832.9 |
| 9.00 | Above 1.50m upto 4.50m depth below G.L | 8.67 | cum | 8,698 ₹75,411.66 Lowest | 8,699 ₹75,420.33 |
| 10.00 | Upto 4.50m height above G.L | 5.48 | Cum | 8,700 ₹47,676 Lowest | 8,750 ₹47,950 |
Tender Value
₹12.7 L
EMD Value
₹12,750
Closing Date
11 Jul 2024, 3:00 pmClosed
President, Kongarpalayam
Panchayat office, Kongarpalayam
Construction of new 60000ltr sump at kamatchi nagar In Kongarpalayam under 15th CFC VP 2023-2024 and Village panchayat General Fund
2024_RDTN_460015_1
07/2024
Open Tender
Civil Works - Others
Item Rate
180 days
kongarpalayam
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹12,750
11 Sept 2025
5 Jul 2024
11 Jul 2024
5 Jul 2024
11 Jul 2024
5 Jul 2024
Amount
Construction of 60000 lit sump as per type design
Earthwork excavation and deposting on bank with an initial lead and lift for 10m and the following classfication of soils.
First depth of 2.00m below G.L
Second depth of 1.00m below G.L
PCC 1:4:8mix Using 40mm HBS metal for leveling course for fountation. including cost of metal, curing and finishing etc.For items 1.5 m to 4.5 m blow GL
RCC 1 : 11/2 :3 mix Using 20HBS stone for the following members. Including cost of mixing, placing the concrete, curing etc. Upto 1.50m depth below G.L
Upto 1.50m depth below G.L
Above 1.50m upto 4.50m depth below G.L
Upto 4.50m height above G.L
Steel centering Upto 3.30m below G.L & above G.L Curved surface
From 0m to 3.30m above floor slab / G.L : plain surface.
Plastring in cm 1:3 with 10mm thick including curing etc. comlete.
Exterier Emulsion painting two coats with approved Emultion paint including cost and conveyance of all materials to site and all labour charges etc complete.
Suppling fabricating and placing in position of RTS rods for all R.C.C works including cost of steel, binding wire etc. complete complying with std. specification
RCC ladder should be made of two ribs of size 0.075 x 0.075 at 30mm c/c. The concrete should be of m20, 8mm RTS rods 4 nos, for ribs with 8mm RTS stirrups at 30cm c/c and 8mm RTS 2nos for steps with 4 nos of rods as distribution including cost all man & materials complying with std. specification.
Supplying and fixing in position of 0.60 x 0.60m size water tight C.I manhole cover at the roof slab and 50x50x6mm M.S angle at the edges. including cost all man & materials complying with std. specification.
Supplying and fixing of 100mm dia PVC ventilator as per approved design.
Supplying and fixing of Cut stone set in CM 1:3 mix below inlet pipe including cost all man & materials complying with std. specification.
Refilling the foundation with excavated earth including watering, ramming, consolidating etc. complete complying with std. specification.
Provision for 80mm G.I pipes and 80mm Gate Valve, G.I & PVC Specials for tank connection works.
Providing labour charges for pipe connections to the OHT with GI pipes and Specials including cutting, threading etc. complete.
Painting scheme details in accordance with the size and specifications including writing details like, name of scheme, estimate amount etc.
Supply and fixing of 7.5 HP submersible motor pump set with all accessories in the sump
Labour charges for the Erection of existing 7.5 HP open well submersible pump set with all accessories in the sump
Supply and Fixing of 4 Sqm 3 Core PVC Insulated Flat cabel
Supply and Fixing of 3 Phase Panel Board and Wiring Arrangement
Supply, delivery and fixing of 63amps E.B Service Wiring materials including cost
Labour Charges for EB Electrification three phase wiring for Metre pedestal and EB pole
Supply and Delivery of 90mm PVC Pipe 6 ksc
Earth work excavation and depositing on bank eith initial lead of 10mt and lift of 2 mt in narrow trenches for all soils
All Soils
Laying and Jointing of 90mm PVC pipes
Refilling the trench with excavated soil
Construction of Meter Pedestal as per Sub Estimate
Earth work excavation for HG Soil for SS20B for foundation Meter pedestal etc complete.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete.
RR Masonry in cm 1:5 mix using Rough stone including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete.
Brick work masonry in cm 1:5 mix using New C.Bricks including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete.
Plastering with cement mortar 1:5mix to 12 mm thick including cost and conveyance of all materials to site and all labour charges etc complete.
Supply and fixing MS KIOSK Box including all labour etc complete.
GST Amount for providing Service to Government Contract Works for the above Construction Works. {GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
CHINNA BOYAN (BID ID -1077351)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_546832.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .