Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹92,900Accepted-Finance INDUSTRIAL ESTATE DIGIANA JAMMU | L1 | Accepted-Finance being lowest | |
| 2 | L2₹93,500+₹600 (0.65%)Rejected-Finance BARI BRAHMANA JAMMU | L2 | Rejected-Finance not lowest | |
| 3 | L3₹94,900+₹2,000 (2.15%)Rejected-Finance BHAGWATI NAGAR JAMMU | L3 | Rejected-Finance not lowest |
Tender Value
₹95,400
EMD Value
₹1,908
Closing Date
29 Dec 2023, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
MID JAMMU
Repairs /electromechanical works of 5 cusec discharge pumping unit 1 and 2.5 cusec discharge pumping unit III along with allied works installed at LIS Bhour Camp
2023_IFC_240670_1
MID/J/e-NIT/2023-24/127
Open Tender
Repair and Maintenance Works
Item Wise
10 days
bhour camp
as per enit
8 documents required · 8 mandatory
₹200
EXECUTIVE ENGINEER MID JAMMU
₹1,908
Yes
18 Jan 2024
19 Dec 2023
30 Dec 2023
19 Dec 2023
29 Dec 2023
20 Dec 2023
Repairs /electromechanical works of 5 cusec discharge pumping unit 1 and 2.5 cusec discharge pumping unit-III along with allied works installed at LIS Bhour Camp.
Dismantling, Carriage and shifting of 5 cusec pump unit -1, 2.5 cusec pump unit III, motor and 8” reflux valve of unit-III by way of shifting to head load to the nearest roadside using manual labour, loading in mechanical transport vehicle, carriage to workshop for repairs. After complete repairs back shifting of pump motor set and foot valve to site of installation i.e. L.I.S. Bhour Camp. The job includes labour charges, hire charges of vehicle (to & fro), carriage, shifting, loading and unloading and all the tools and tackles are to be arranged by firm. Repair to pump of unit 1 by dismantling of pump set from the suction piece by unscrewing/cutting of old rusted nuts and bolts and taking out the tail piece of pump body by way of unscrewing the nuts and bolts using tools, tackles and manual labour at work shop, extracting the shaft assembly from pump body after unscrewing the required nuts, bolts from motor side and unscrewing the lock nut for impeller from suction side. Repairs to 05 cusec discharge pump at workshop by way of extracting the damaged parts. Repairs to pump shaft by way of turning, threading, finishing and cutting of key ways to required size. Repairs to impeller by way of brazing, remetalling, turning and finishing to required size and profile. Repair to gland brackets, new gland rings, repair to HC pump body and bearing housings along with new bearing bracket. Fitting the shaft assembly to pump body by inserting it from motor side and fitting to the pump body by P/F of rubber sheet joints cut to size and required nuts and bolts along with washer. Providing and fitting of gland packing 08 mm, Fitting the impeller from suction side and locking it with lock nut. Fitting the tail piece of pump body by P/F of rubber sheet joint cut to size and required nuts and bolts along with washers. Similarly fitting of suction piece by P/F of 02 Nos rubber sheet joints to either side of suction piece cut to side along with new nuts and bolts with washer of required size, repair to coupling pulley set on pump and motor shaft by way of turning to shaft size, key way making and finishing.Job includes cost of material used, labour charges, tools and tackles used, installation and testing on full load condition at site. Repairs to 2.5 cusec discharge pump unit –III at workshop by way of dismantling for extraction of old and worn out parts i.e. bearings, sleeves check nut, gland packing, gasket, gland bushes, pump shaft, impeller. Repair to impeller by way of re-metalling, machining and finishing it to accurate size. Providing and fitting of new pump shaft by way of turning, machining & finishing to the required size. P/F of 1Nos. gland bushes, check nut, 2Nos. bearings, 1Nos. sleeves. Re-assembling all parts of pump with proper greasing and suitable gland packing, oil paper, repair to pump housing, repair to coupling pulley set by way of turning and making the holes along with rubber bushes, repair to pump by cleaning with a solvent and testing it in full load. Disconnecting the electric supply and repair to 160 A main switch by way of repair to spring handle, bus bar along with cleaning of it by removing carbon and fitting of nut bolts by way of thimbling the wire and fitting of new neutral wire from transformer to main supply of length 40 foot and repair to 10 HP motor set of unit III of LIS Bohr camp by extraction of burnt/damaged windings, cleaning of stator slots. Repairs to rotor of motor by providing and fitting of new bearing, greasing it, making of new sleeves and finishing to bearing sizes, making new keyway and finishing of coupling, providing and fitting of bearing end covers sleeves, repair to connection plate along with complete greasing of the bearings, repair to pump by cleaning with a solvent and testing it in full load. Fitting of pump and motor on base frame by making holes on the channels and fitting them by suitable nut bolts Repair to reflux valve of 200mm dia of unit III by way of dismantling the top cover of reflux valve by opening the damaged/rusted nuts, bolt and extracting out the damaged flap assembly along with shaft and bushes. Fabrication of flap assembly for reflux valve of CI by casting to shape and turning to require size, making of holes at proper place for fitting of nuts and bolts with packing ring after P/F of heavy duty rubber packing sheet in between packing ring and flap with the help of new nuts and bolts. Repair to supporting arms by fabrication and fitting of main nuts and bolts. Fabrication of bushes as per sample and fabrication of rod by turning and polishing to the size of bushes. Checking to and fro working of flap. Fitting of top cover after P/F of new fasteners and heavy duty packing sheet with complete sealing and no leakage. Repair to foot valve by way of fabrication of new foot valve plate as per sample, new leather washer, hinge pin, new nuts & bolts. The complete job includes the cost of materials, labour charges, installation and testing on full load. Painting of pumping machinery along with NRV, sluice valves (3no.), suction line and delivery line of length of approx (200 foot), for all pumping units (03 no.) and priming unit (2” dia suction and delivery line of approx length (40 foot), starter units (3 no.) , pump (3 no.), motor ( 3no.), base frame of pump set and motor set (3no.) Complete painting of the voltage stabilizer of 30Kva and 50 kva, starters (3 no.), panel board and angle frame by first cleaning the surface with the help of sand paper and then applying one coat of primer and two coats of blue /black paint as per the requirement. The job includes labour, carriage, transportation and hires charges of tripod stand and other tools and equipments used. The job includes general cleaning of the pump room, with the help of manual labour using ropes, ladder. Complete job The bidders/contractors are advice to visit the site before quoting the rates.
Rebate on Old Parts
JAGDEMBAY MECH ENGG WORKS
PERFECT ELECTRICAL WORKS
PERFECT ELECTRICAL WORKS
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .