| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.8 LAccepted-Finance | ₹8.8 L | L1 | Accepted-Finance 1 |
| 2 | L2₹9.8 LRejected-Finance | ₹9.8 L | L2 | Rejected-Finance 2 |
Updated dates
Tender Value
₹11 L
EMD Value
₹1.1 L
Closing Date
17 Mar 2026, 12:00 pmClosed
Executive Engineer
Executive Engineer, Construction Division-2, PWD, Budaun.
Renewal with P.C. on Executive Engineer Approach Road Provincial Division , Executive Engineer Approach Road Construction Division, Inspection House Budaun Part No. 1 Store Site Road, Inspection House Budaun Soot No. 3 Road and Inspection House Main
2026_CEBLY_1120290_1
193(1)/Nivida(E.T)/2026 Date 31.01.2026
Open Tender
Civil Works - Roads
60 days
CD-2 PWD Budaun
Please refer Tender documents.
3 documents required · 3 mandatory
₹856
₹1.1 L
Yes
Budaun
9 Apr 2026
28 Feb 2026
17 Mar 2026
28 Feb 2026
17 Mar 2026
28 Feb 2026
2 Mar 2026
Select, At Par, Excess (+), Less (-) IOCL
Tender Inviting Authority: Executive Engineer, Construction Division-2, PWD, Budaun.
Name of Work: Renewal with P.C. on Executive Engineer Approach Road Provincial Division Km 1(054), Executive Engineer Approach Road Construction Division Km 1(021), Inspection House Budaun Part No. 1 Store Site Road km 1(068), Inspection House Budaun Soot No. 3 Road Km 1(178) and Inspection House Main Road Km 1(172) in financial Year of 2026-27.
Contract No: - 193(1)/Nivida (E.T.)/2025-26 Date 31.01.2026
Sl. No. Item Description(Excluding G.S.T.) Item Code / Make Quantity Units Estimated Rate UNIT Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category
1.1 Providing & applying tack coat with bitumen VG-10 using pressure distributor at the rate of 0.30 kg per sqm on the prepared granular surface cleaned with mechanical broom including cost of all types of materials, labour, T&P etc. required for proper completion of the work as per MORT&H specifications (2001) No. 503. (For D.B.M. and B.C.) Executive Engineer Approach Road Provincial Division Km 1(054) Sqm Excess(+) Full Conversion INR
1.2 Executive Engineer Approach Road Construction Division Km 1(021) Sqm Excess(+) Full Conversion INR
1.3 Inspection House Budaun Part No. 1 Store Site Road km 1(068) Sqm Excess(+) Full Conversion INR
1.4 Inspection House Budaun Soot No. 3 Road Km 1(178) Sqm Excess(+) Full Conversion INR
1.5 Inspection House Main Road Km 1(172) Sqm Excess(+) Full Conversion INR
2.1 Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.50 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects. Executive Engineer Approach Road Provincial Division Km 1(054) Cum Excess(+) Full Conversion INR
2.2 Executive Engineer Approach Road Construction Division Km 1(021) Cum Excess(+) Full Conversion INR
2.3 Inspection House Budaun Part No. 1 Store Site Road km 1(068) Cum Excess(+) Full Conversion INR
2.4 Inspection House Budaun Soot No. 3 Road Km 1(178) Cum Excess(+) Full Conversion INR
2.5 Inspection House Main Road Km 1(172) Cum Excess(+) Full Conversion INR
3.1 Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects. Executive Engineer Approach Road Provincial Division Km 1(054) Cum Excess(+) Full Conversion INR
3.2 Executive Engineer Approach Road Construction Division Km 1(021) Cum Excess(+) Full Conversion INR
3.3 Inspection House Budaun Part No. 1 Store Site Road km 1(068) Cum Excess(+) Full Conversion INR
3.4 Inspection House Budaun Soot No. 3 Road Km 1(178) Cum Excess(+) Full Conversion INR
3.5 Inspection House Main Road Km 1(172) Cum Excess(+) Full Conversion INR
Total in Figures
Quoted Rate in Figures Select
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
techsummary_2083821.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.92 MB
T1_1.pdf
Tender Documents • 3.71 MB
BOQ_2083821.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid