Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹19.2 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹19.6 L+₹48,605.76 (2.54%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹21.6 L+₹2.4 L (12.7%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Others-CDR REPEATED | ||
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Others-CDR REPEATED |
Tender Value
₹19.4 L
EMD Value
₹38,880
Closing Date
29 Oct 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER OFFICE REW DIVISION REASI ROOM
EXECUTIVE ENGINEER OFFICE REW DIVISION REASI, BLOCK NO. 2, ROOM NO. 205
Construction of Foot Bridge at Babel, Ruddi Nallah between MANJlKOTE and CHASSOTTE panchayat under capex TRIBAL Distt. REASl for the year 2026-27
2026_RDPR_328908_1
e-NIT No. 292 of REW REASl of 2026-27
Open Tender
Civil Works
Percentage
REASl
Please refer Tender documents.
2 documents required · 2 mandatory
₹800
MH 0515
₹38,880
11 Nov 2026
22 Oct 2026
30 Oct 2026
22 Oct 2026
29 Oct 2026
22 Oct 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. | 64.87 | cum | 592.9 | ₹38,461.42 |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated & disposal as directed: 25 meter beyond 1 m from cutting edge All kinds of soil | 14.6 | cum | 479.3 | ₹6,997.78 |
| 3 | P/L cement concrete- all work upto plinth level: with 4.4.8 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 1.91 | cum | 4,826.5 | ₹9,218.62 |
| 4 | P/L in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 4.89 | cum | 5,733.6 | ₹28,037.3 |
| 5 | RCC work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 mix using 20 mm ns agg | 10.08 | cum | 9,821.85 | ₹99,004.25 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for:4.6.2 Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs andsteps etc. | 26.16 | sqm | 628.95 | ₹16,453.33 |
| 7 | Reinforcement for RCC work including straightening , cutting, placing in position and binding all complete with TMT bars | 1,239.86 | kg | 123.2 | ₹1,52,750.75 |
| 8 | Providing and launching of Steel foot bridge of as design inclosed including all lead and lift (mecahnical Transport as well as head load) total weight of design foot bridge 8644 kg (455 kg/rmt) as directed by engineer in charge Total span of foot bridge is 19mtr | 19 | meter | 80,000 | ₹15,20,000 |
| 9 | Carriage of cement from average distance of 20 km by MT & 2000 meter by AT | 5.26 | mt | 1,349.34 | ₹7,097.53 |
| 10 | Carriage of Steel from average distance of 25 km by MT & 2000 meter by AT | 4.5 | mt | 2,091.56 | ₹9,412.02 |
stage.html
html • 0.02 MB
finance_1114499.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.69 MB
BOQ_1114499.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .