Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹20.6 LAccepted-AOC | 1 | Accepted-AOC Lowest Bidder |
Tender Value
₹19.2 L
EMD Value
₹38,420
Closing Date
22 Mar 2022, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Executive Engineer W.S. Division Kurukshetra
Repair of Syphon at RD 26500 of Lukhi Bund at village Challon.
2022_HRY_212803_1
22.03.2022/1
Open Tender
Civil Works
Item-rate/Agreement basic
90 days
Kurukshetra
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
₹38,420
Yes
10 Jun 2022
17 Mar 2022
22 Mar 2022
17 Mar 2022
22 Mar 2022
17 Mar 2022
90 days
Amount
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar (HSR 5.7.4)
Centering and shuttering including strutting, propping etc. and removal of form work for : cum cum Foundations, footings, bases for columns (HSR 6.29.1)
Centering and shuttering including strutting, propping etc. and removal of form work for : Columns, piers, abutments, pillars, posts and struts (HSR 6.29.3)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level1:3:6 (1 Cement : 3 coarse sand (zone-Ill) : 6 graded cum stone aggregate 20 mm nominal size) (HSR 6.1.4)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement-All work up to plinth level: 1 : 1. 5: 3 ( 1 cement : 1. 5 coarse sand (zone-Ill): 3 cum graded stone aggregate 20 mm nominal size) (HSR 6.14.1)
Brick masonry work in 1 :3 in sub-structure including scaffolding complete excluding pointing and plastering, as per drawing and MoRT&H Specifications 1300 and 2200 (HSR27.1)
Supply, loading, unloading and laying of stone boulder (HSR 35.9.1+16.39+16.94.1)
Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect above plinth level. Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect above plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more (HSR 6.34.6)
Excavating, supplying and filling of local earth (including royalty) cum by mechanical transport up to a lead of 1 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. (HSR 4.33)
Filling available excavated earth (excluding rock) in trenches, cum plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m (HSR 4.32)
Credit of brick work
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .