Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 CrAdmitted-Finance AT PLOT NO 70 C SECTOR A ZONE D MANCHESWAR INDUSTRIAL ESTATE BHUBANESWAR 751010 | KHORDHA | ODISHA | 751010 | ₹4.4 Cr | L1 | Admitted-Finance |
| 2 | Rejected-Technical 308 HERITAGE PLAZA OPP GURUKUL DRIVEIN ROAD AHMEDABAD GUJARAT 380052 | AHMADABAD | GUJARAT | 380052 | - | - | Rejected-Technical Disqualified |
| Sl No | Description | Qty | Unit | M/s CEF ENGINEERING L1 |
|---|---|---|---|---|
| 1.00Detailed Design, Drawing, Construction, Installation of Required machinery & equipment, Testing and Commissioning of Sewage Treatment Plant (STP) of different Capacities as indicated below for Worker’s Hostels of IDCO at following Locations in Odisha (On Turnkey Basis) – Package 1 | ||||
| 1.01 | For Workers Hostel at Kalinga Nagar, Jajpur (240 KLD) | 1 | Job | 85,00,000 ₹85,00,000 Lowest |
| 1.02 | For Workers Hostel at Chhatabar (200 KLD) | 1 | Job | 72,00,000 ₹72,00,000 Lowest |
| 1.03 | For Workers Hostel at Jayamangal (200 KLD) | 1 | Job | 72,00,000 ₹72,00,000 Lowest |
| 1.04 | For Workers Hostel at Choudwar (200 KLD) | 1 | Job | 72,00,000 ₹72,00,000 Lowest |
| 1.05 | For Workers Hostel at Khordha (240 KLD) | 1 | Job | 85,00,000 ₹85,00,000 Lowest |
| 2.005 years of O&M For STP at Workers Hostel at Kalinga Nagar, Jajpur (240 KLD) | ||||
| 2.01 | Operation and Maintenance cost for the 1st year | 1 | Job | 1,50,000 ₹1,50,000 Lowest |
| 2.02 | Operation and Maintenance cost for the 2nd year | 1 | Job | 1,50,000 ₹1,50,000 Lowest |
| 2.03 | Operation and Maintenance cost for the 3rd year | 1 | Job | 2,00,000 ₹2,00,000 Lowest |
Tender Value
₹4.2 Cr
EMD Value
₹4.2 L
Closing Date
13 Feb 2025, 5:00 pmClosed
CGM PC
IDCO TOWERS, RUPALI SQUARE, BHUBANESWAR
Detailed Design Drawing Construction Installation of Required machinery and equipmentTesting andCommissioning of STP of different capacities including 5 years of OandM at Worker hostel of IDCO at Different Locations in Odisha On TurnkeyBasis Package1
2025_IDCO_109602_1
PC/EST/E-40/2024-25
National Competitive Bid
Civil Works - Others
Turn-key
210 days
Cuttack, Jajpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,800
₹4.2 L
Yes
Through VC
29 Apr 2025
18 Jan 2025
14 Feb 2025
18 Jan 2025
13 Feb 2025
18 Jan 2025
18 Jan 2025 - 31 Jan 2025
27 Jan 2025
Amount
Detailed Design, Drawing, Construction, Installation of Required machinery & equipment, Testing and Commissioning of Sewage Treatment Plant (STP) of different Capacities as indicated below for Worker’s Hostels of IDCO at following Locations in Odisha (On Turnkey Basis) – Package 1
For Workers Hostel at Kalinga Nagar, Jajpur (240 KLD)
For Workers Hostel at Chhatabar (200 KLD)
For Workers Hostel at Jayamangal (200 KLD)
For Workers Hostel at Choudwar (200 KLD)
For Workers Hostel at Khordha (240 KLD)
5 years of O&M For STP at Workers Hostel at Kalinga Nagar, Jajpur (240 KLD)
Operation and Maintenance cost for the 1st year
Operation and Maintenance cost for the 2nd year
Operation and Maintenance cost for the 3rd year
Operation and Maintenance cost for the 4th year
Operation and Maintenance cost for the 5th year
5 years of O&M For STP at Workers Hostel at Chhatabar (200 KLD)
Operation and Maintenance cost for the 1st year
Operation and Maintenance cost for the 2nd year
Operation and Maintenance cost for the 3rd year
Operation and Maintenance cost for the 4th year
Operation and Maintenance cost for the 5th year
5 years of O&M For STP at Workers Hostel at Jayamangal (200 KLD)
Operation and Maintenance cost for the 1st year
Operation and Maintenance cost for the 2nd year
Operation and Maintenance cost for the 3rd year
Operation and Maintenance cost for the 4th year
Operation and Maintenance cost for the 5th year
5 years of O&M For STP at Workers Hostel at Choudwar (200 KLD)
Operation and Maintenance cost for the 1st year
Operation and Maintenance cost for the 2nd year
Operation and Maintenance cost for the 3rd year
Operation and Maintenance cost for the 4th year
Operation and Maintenance cost for the 5th year
5 years of O&M For STP at Workers Hostel at Khordha (240 KLD)
Operation and Maintenance cost for the 1st year
Operation and Maintenance cost for the 2nd year
Operation and Maintenance cost for the 3rd year
Operation and Maintenance cost for the 4th year
Operation and Maintenance cost for the 5th year
N.B: Rates quoted shall be excluding the GST.
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.68 MB
BOQ_526450.xls
BOQ • 0.30 MB
STPWHDTCNPACKAGE1.pdf
Tender Documents • 9.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .