Loading…
Loading…
Tender Value
₹2.6 Cr
EMD Value
₹2.8 L
Closing Date
5 Jan 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
AGRA DIV
15 conditions · 2 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees, N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure- VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.(Note: No other document than specified above shall be considered valid for evaluating this eligibility criteria).In case of non-submission of above documents, offer may be summarily rejected.
(a) The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the onein which tender is invited: (i) Three similar works each costing not less than the amount equal to 30% of advertised value of the tender,or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of the tender,or (iii) One similar work costing not less than the amount equal to 60% of advertised value of the tender. (b) (1) In case of tenders for composite works (e.g. works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges - substructure, superstructure etc.), tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous tothe onein which tender is invited: (i) Three similar works each costing not less thanthe amount equal to30% of advertised value of each component of tender,or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of each component of tender,or (iii) similar work each costing not less than the amount equal to 60% of advertised value of each component of tender. Note for b(1): Separate completed works of minimum required values shall also be considered for fulfillment of technical eligibility criteria for different components. (b) (2)In such cases, what constitutes a component in a composite work shall be clearly pre-defined with estimated tender cost of it, as part of the tender documents without any ambiguity. (b) (3) To evaluate the technical eligibility of tenderer, only components of work as stipulated in tender documents for evaluation of technical eligibility, shall be considered. The scope of work covered in other remaining components shall be either executed by tenderer himself if he has work experience as mentioned in clause 7 of the Standard General Conditions of Contractor through subcontractor fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract or jointly i.e., partly himself and remaining through subcontractor, with prior approval of Chief Engineer in writing. However, if required in tender documents by way of Special Conditions, a formal agreement duly notarised, legally enforceable in the court of law, shall be executed by the main contractor with the subcontractor for the component(s) of work proposed to be executed by the subcontractor(s), and shall be submitted along with the offer for considering subletting of that scope of work towards fulfilment of technical eligibility. Such subcontractor must fulfill technical eligibility criteria as follows: The subcontractor shall have successfully completed at least one work similar to work proposed for subcontract, costing not less than 35% value of work to be subletted, in last 5 years, ending last day of month previous to the one in which tender is invited througha works contract.
In case after award of contract or during execution of work it becomes necessary for contractor to change subcontractor, the same shall be done with subcontractor(s) fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract, with prior approval of Chief Engineer in writing. Note for Item 10.1: Work experience certificate from private individual shall not be considered. However, in addition to work experience certificates issued by any Govt. Organisation, work experience certificate issued by Public listed company having average annual turnover of Rs 500 crore and above in last 3 financial years excluding the current financial year, listed on National Stock Exchange or Bombay Stock Exchange, incorporated/registered at least 5 years prior to the date of closing of tender, shall also be considered provided the work experience certificate has been issued by a person authorized by the Public listed company to issue such certificates. In case tenderer submits work experience certificate issued by public listed company, the tenderer shall also submit along with work experience certificate, the relevant copy of work order, bill of quantities, bill wise details of payment received duly certified by Chartered Accountant, TDS certificates for all payments received and copy of final/last bill paid by company in support of above work experience certificate.(Note:In case of non-submission of above documents, offer may be summarily rejected).
Defination of Similar Work :- Any Signaling or Telecom work.
49 conditions · 6 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Documents to be submitted along with the tender.
Please submit your bank details i.e. Name of the Bank along with Bank Branch Code, Account Number, IFSC Code, and PAN Number. (Format attached)
The tenderer shall clearly specify whether the tender is submitted on his own (Proprietary Firm) or on behalf of a Partnership Firm / Company / Joint Venture (JV) / Registered Society / Registered Trust / Hindu Undivided Family (HUF) / Limited Liability Partnership (LLP) etc. The tenderer(s) shall enclose the attested copies of the constitution of their concern, and copy of PAN Card along with their tender. Tender Documents in such cases are to be signed by such persons as may be legally competent to sign them on behalf of the firm, company, association, trust or society, as the case may be. (Note:In case of non-submission of above documents, offer may be summarily rejected).
The tenderer whether sole proprietor / a company or a partnership firm / joint venture (JV) /registered society / registered trust / HUF / LLP etc if they want to act through agent or individual partner(s), should submit along with the tender, a copy of power of attorney duly stamped and authenticated by a Notary Public or by Magistrate in favour of the specific person whether he/they be partner(s) of the firm or any other person, specifically authorizing him/them to sign the tender, submit the tender and further to deal with the Tender/ Contract up to the stage of signing the agreement except in case where such specific person is authorized for above purposes through a provision made in the partnership deed / Memorandum of Understanding / Article of Association /Board resolution, failing which tender shall be summarily rejected. A separate power of 2.2.1 attorney duly stamped and authenticated by a Notary Public or by Magistrate in favour of the specific person whether he/they be partner(s) of the firm or any other person, shall be submitted after award of work, specifically authorizing him/them to deal with all other contractual activities subsequent to signing of agreement, if required. Note: A Power of Attorney executed and issued overseas, the document will also have to be legalized by the Indian Embassy and notarized in the jurisdiction where the Power of Attorney is being issued. However, the Power of Attorney provided by Bidders from countries that have signed the Hague Legislation Convention 1961 are not required to be legalized by the Indian Embassy if it carries a conforming Apostille certificate.(Note:In case of non-submission of above documents, offer may be summarily rejected).
The tenderer will give full information ( in annexure-A) as to the date of retirement of such Engineer or gazetted officer from the said service and as to whether permission for taking such contract, or if the Contractor be a partnership firm or an incorporated company, to become a partner or director as the case may be, has been obtained by the tenderer or the Engineer or officer, as the case may be from the President of India or any officer, duly authorized by him in this behalf, shall be clearly stated in writing at the time of submitting the tender,if a tenderer is - i) be a retired Engineer of the gazetted rank or any other gazetted officer working before his retirement, whether in the executive or administrative capacity or whether holding a pensionable post or not, in the Engineering or any other department of any of the railways owned and administered by the President of India for the time being, OR ii) being partnership firm / joint venture (JV) / registered society / registered trust etc have as one of its partners/members a retired Engineer of the gazetted rank or any other gazetted officer working before his retirement, OR iii) being an incorporated company have any such retired Engineer of the gazetted rank or any other gazetted officer working before his retirement as one of its directors AND in case where such Engineer or officer had not retired from government service at least 1 year prior to the date of submission of the tender
If a tenderer or Contractor being an individual, have member(s) of his family or in the case of partnership firm/ company / joint venture (JV) / registered society / registered trust etc. one or more of his partner(s)/shareholder(s) or member(s) of the family of partner(s)/shareholder(s) having share of more than 1% in the 2.3.1 tendering entity employed in gazetted capacity in the Engineering or any other department of the railway, then the tenderer at the time of submission of tender, will inform the authority inviting tenders the details of such persons. ( in annexure-A)
An undertaking shall be submitted in form of Annexure-VA is to be given by attorney/authorized signatory/each member of Partnership firm/Joint Venture (JV) / Hindu Undivided Family (HUF) / Limited Liability Partnership (LLP) etc. as the case may be. Concealment / wrong information in regard to above shall make the contract liable for determination under Clause 62 of the General Conditions of Contract. Note-1: Annexure VA should be submitted as per explanatory formats which are part of documents uploaded alongwith the NIT in the name of guidelines for filling of Annexure VA. Note-2: In case of non submission of above certificate, or submission of certificate either not properly filled in, or, in a format other than the prescribed format, shall lead to summarily rejection of your offer.
General Compliance
The accepted rates shall be deemed to include and cover all fees, taxes, duties, royalties, rent etc
Income Tax, Surcharge thereof, Goods & Service Tax (GST Act, 2017) and any other applicable tax shall be recovered from contractor's bill as per rule in force.
Implementation of GST Act, 2017 - Procedure for payment of Contractual bill is given in General Instructions attached in document. Please go through the procedure before submission of the offer.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Information regarding staff, Plant & machinery, past experience and ongoing work details
Please furnish list of plant and Machinery available on hand own and proposed to be inducted own and hired to be given separately for the subject work.
Please furnish list of Works on hand indicating Description of Work, Contract Value, Approximate value of balance work yet to be done and Date of award.
Please furnish list of Works completed in last seven financial years giving Description of Work, Organization for whom executed, approximate value of contract at time of award, Date of award and Date of Completion. Date of actual Start, Actual Completion and Final value of Contract shall also be given
Please furnish list of personal, organization available on hand and proposed to be engaged for the subject work.
If bid security is submitted in the form of Bank Guarantee, it shall be made in favour of Senior Divisional Finance Manager, North Central Railway, Agra. The format of Bank Guarantee is attached in Annexure VI A. The original Bank Guarantee should be delivered to this office within 5 working days before closing date for submission of bids.
Prior consent of Railway representative to be taken before procurement of material for supply item.
Tenderer (s) should attached the scan documents in support of minimum eligibility criteria along with the tender. No document in support of minimum eligibility criteria will be accepted/entertained after opening of tender.
Security Deposit: The Security Deposit shall be 5% of the contract value. The Bid Security submitted by the Contractor with his tender will be retained/encashed by the Railways as part of security for the due and faithful fulfillment of the contract by the Contractor. Provided further that, if Contractor submits the Cash or Term Deposit Receipt issued from a Scheduled commercial bank of India or irrevocable Bank Guarantee Bond from a Scheduled commercial bank of India, either towards the Full Security Depositor the Part Security Deposit equal to or more than Bid Security, the Railway shall return the Bid Security, to the Contractor. Balance of Security Deposit may be deposited by the Contractor in cash or Term Deposit Receipt issued from Scheduled commercial bank of India or irrevocable Bank Guarantee bond issued from Scheduled commercial bank of India, or may be recovered at the rate of 6% of the bill amount till the full Security Deposit is recovered. Provided also that in case of defaulting Contractor, the Railway may retain any amount due for payment to the Contractor on the pending "on account bills" so that the amounts so retained (including amount guaranteed through Performance Guarantee) may not exceed 10% of the total value of the contract. The Irrevocable Bank Guarantee submitted towards Security deposit shall be initially valid up to the stipulated date of Maintenance period plus 60 days and shall be extended from time to time, depending upon extension of contract granted in terms of Clause 17A and 17B of the Standard General Conditions of Contract. Note: Security Deposit deposited in cash by the Contractor or recovered from the running bills of a Contractor or submitted by contractor as Term Deposit Receipt(s) can be refunded/returned to the contractor, in lieu of irrevocable Bank Guarantee bond issued from scheduled commercial bank of India, to be submitted by him, for an amount equal to or more than the already available Security Deposit, provided however that, in a contract of value less than Rs. 50 Crore, such refund/ return of the already available Security Deposit is permitted up to two times and in a contract of value equal to or more than Rs. 50 Crore, such refund / return of the already available Security Deposit is permitted up to three times.
Performance Guarantee:- The procedure for obtaining Performance Guarantee is outlined below: (a)The successful bidder shall have to submit a Performance Guarantee (PG) within 21 (Twenty one) days from the date of issue of Letter of Acceptance (LOA). Extension of time for submission of PG beyond 21 (Twenty one) days and upto 60 days from the date of issue of LOA may be given by the Authority who is competent to sign the contract agreement. However, a penal interest of 12% per annum shall be charged for the delay beyond 21(Twenty one) days, i.e. from 22ndday after the date of issue of LOA. Further, if the 60thday happens to be a declared holiday in the concerned office of the Railway, submission of PG can be accepted on the next working day. In all other cases, if the Contractor fails to submit the requisite PG even after 60 days from the date of issue of LOA, the contract is liable to be terminated. In case contract is terminated railway shall be entitled to forfeit Bid Security and other dues payable to the contractor against that particular contract, subject to maximum of PG amount. In case a tenderer has not submitted Bid Security on the strength of their registration as a Startup recognized by Department of Industrial Policy and Promotion (DIPP) under Ministry of Commerce and Industry, DIPP shall be informed to this effect. The failed Contractor shall be debarred from participating in re-tender for that work.
The Tenderers having more than 20 labour, is required to obtain the labour license from the licensing Officer under Provision of Contract Labour (Regulation and Abolition) Act 1970 read with Contract Labour (Regulation and Abolition) Central Rules 1970. They should obtain a proper and valid labour license for the concerned work from the concerned Asstt. Labour Commissioner or licensing officer of the area and the photo copy of the labour license must be submitted to Railway for records . Failure to do so will attract legal action against the tenderer
In case any contradiction between general condition of contract & special conditions of contract will prevail over general conditions of contract.
If the tenderer(s) deliberately gives / give wrong information in his/their tender or creates/create circumstances for the acceptance of his/their tender, the Railway reserves the right to reject such tender at any stage.
All Rules of NIT & Post LOA shall be governed by GCC & tenderer agree to adhere to it without any dispute.
Contractor will clear/clean the work site after completion of the work, to the satisfaction of site engineer.
All false work, staging etc. should be so erected, clamped and secured that these should not infringe / moving dimension and obstruct the railway traffic.
In terms of clause 26A.3 of GCC, the Contractor shall deploy atleast one Diploma Holder Engineers at site during the execution of work.
Special Conditions of contract for mandatory updation of Labour Data on Railway's Srakimkalyan Portal by Contract. Clause 54 & 55 of Indian Railway General Conditions of Contract deals with Wages to labour and action in case of default of contractor to payment of wages. In order to increase transparency in payment of Contract Labour wages and other payments, a web based application has been developed and hosted on website www.shramikkalyan.indianrailway.gov.in. All contractors are required to upload details of their LoAs, engaged workmen, wage payment details, PF/ESI details, bonus details etc., on monthly basis. This details so uploaded shall be available in public domain. In order to ensure prompt and proper uploading of details related to LoAs, engaged workmen, wage & other payment details. The special condition is as under:
A.Contactor is to abide by the provisions of Payment of Wages act & Minimum Wages act in terms of clause 54 and 55 of Indian Railway General Condition of Contract. In order to ensure the same, an application has been developed and hosted on website 'www.shramikkalyan.indianrailways.gov.in'. Contractor shall register his firm/company etc. and upload requisite details of labour and their payment in this portal. These details shall be available in public domain. The Registration/ updation of Portal shall be done as under: (a) Contractor shall apply for onetime registration of his company/firm etc. in the Shramikkalyan portal with requisite details subsequent to issue of Letter of Acceptance. Engineer shall approve the contractor's registration on the portal within 7 days of receipt of such request. (b) Contractor once approved by any Engineer, can create password with login ID (PAN No.) for subsequent use of portal for all LoAs issued in his favour. (c) The contractor once registered on the portal, shall provide details of his Letter of Acceptances (LoA)/Contract Agreement on shramikkalyan portal within 15 days of issue of any LoA for approval of concerned engineer. Engineer shall update (if required and approve the details of LoA filled by contractor within 7 days of receipt of such request. (d) After approval of LoA by Engineer, contractor shall fill the salient details of contract labours engaged in the contract and ensure updating of each wage payment to them on shramikkalyan portal on monthly basis. (e) It shall be mandatory upon the contractor to ensure correct and prompt uploading of all salient details of engaged contractual labour & payments made thereof after each wage period.
B. While processing payment of any 'On Account bill' or 'Final bill' or release of 'Advances' or 'Performance Guarantee/Security deposit', contractor shall submit a certificate to the Engineer of Engineer's representatives that " I have 13.1.1 uploaded the correct details of contract labours engaged in connection with this contract and payment made to them during the wage period in Railway's Shramik kalyan portal at 'www.shramikkalyan.indianrailways.gov.in' till_____ Month,_______ year."
Old GCC has been changed and replaced with new General Conditions of Contract-2022, which has been added in tender document. Please go through this new General Condition of Contract-2022 before bidding. In case of any discrepancy, contradiction with regard to GCC (except special condition of contract) in that case GCC- 2022 will be applicable.
Guidelines for online Bank Guarantee verification should be followed as per attached document.
Reliability improvement and periodical maintenance of S&T assets under the jurisdiction of Sr.DSTE/Co/Agra of Agra Division.
AGRA-ST-2025-51A~NCR
AGRA-ST-2025-51A
Open
Works - General
12 Months
Agra, Uttar Pradesh
₹0
₹2.8 L
5 Jan 2026
12 Dec 2025
22 Dec 2025
106 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 2,58,34,003.4 | ||
| — | 300.00 | — | — | ||
| Supply of PPTC fuse GP 60-185, UL-94 certification (1.6 Amps) for internal/external current. Make Fuzetec, Tyco, Raychem, Littlefuse or similar. (Inspection by Consignee) | — | — | — | 2,979 | |
| — | 300.00 | — | — | ||
| Supply of PPTC fuse GP 60-400, UL-94 certification (12 V/4 Amp) for TF,TR circuit. Make Fuzetec, Tyco, Raychem, Littlefuse or similar. (Inspection by Consignee) | — | — | — | 2,514 | |
| — | 300.00 | — | — | ||
| Supply of PPTC fuse GP 30-100, UL-94 certification (24 V/ 1.4 Amp) for TPR circuit. Make Fuzetec, Tyco, Raychem, Littlefuse or similar. (Inspection by Consignee) | — | — | — | 2,739 | |
| — | 300.00 | — | — | ||
| Supply of PPTC fuse GP 250-185, UL-94 certification (24 V/ 4 Amp) 110V AC for Track Chargers. Make Fuzetec, Tyco, Raychem, Littlefuse or similar. (Inspection by Consignee) | — | — | — | 2,514 | |
| — | 200.00 | — | — | ||
| Supply of stretcher bar insulation complete set consisting of the following:- Plate-T- 10367-1 No., Bush T- 10368- 3 Nos. and washer-T- 10371 -6 Nos. (Inspection by Consignee) | — | — | — | 76,298 | |
| — | 200.00 | — | — | ||
| Supply of gauge tie plate insulation complete set each set consisting plate T-10372 = 1No., Bush T-10368=3 Nos. and washer - T-10371 = 6 Nos. (Inspection by Consignee) | — | — | — | 76,388 | |
| — | 120.00 | — | — | ||
| Supply of Z-190 Corium or zenith 225.0 m/g or similar (200 ml can). Specification-i] Appearance-Clear Plate ii] Odour-Slightly medicinal Vingour odour iii] Specific Gravity 1.04 iv] Flash Point- 90.5 v] Solubility-Insoluble in water vi] Max. Withstand temp-Up to 230 deg. Centigrade vii] Tensile Strength-145 PSI to 275PSI depends on applications. viii] Safe life-One Year ix] Toxity-Non in normal used x] Safe on plastic, safe on metal (Inspection by RITES) | — | — | — | 12,46,652.4 | |
| — | 10950.00 | Man-Days | — | ||
| Protection, adjustments and reinstating of S & T gears by deputation of Helper/Unskilled labour for executing additional Signalling & Telecom portion of the works. The work can involve fixing, releasing, dismantling, replacement, excavation, clearing of vegetation, loading and unloading of material,protection of track with flag and assisting skilled persons etc. as per instruction of Railway representative at site. The contractor has to carry materials to field and the released materials from site has to be taken back to the concerned SSE/Signal/Telecom store. The contractor has to arrange necessary tools such as bar, sickle, cutter, pickaxe, rake, hoe etc. as per instruction of Railway representative (Qty. 30*365= 10950 days). | — | — | — | 76,42,114.5 | |
| — | 4380.00 | Man-Days | — | ||
| Protection, adjustments and reinstating of S & T gears by deputation of Fitter/wireman /Painter/welder/Mason/cable jointer i.e., Skilled labour for executing additional Signalling & Telecom portion of the works. The work can involve fixing, releasing, dismantling, replacement, painting or alteration of various signalling assets or parts, termination of cables, minor patch work on damages at location box, Plastering, concreting brick work, wiring alterations, cable jointing etc. as per instruction of Railway representative at site. The contractor has to carry materials to field and the released materials from site has to be taken back to the concerned SSE/Signal store. The contractor has to arrange necessary tools for carrying out the work as per Railway representative instruction (Qty. 12*365= 4380 days). | — | — | — | 38,75,292.6 | |
| — | 50.00 | — | — | ||
| Supply, Installation, Testing and Commissioning of Addressable heat & smoke Multi sensor. As per RDSO Specification No. RDSO/SPN/ 217/2021 ver 3.0 or Latest). (Inspection by RDSO) | — | — | — | 1,52,675.5 | |
| — | 50.00 | — | — | ||
| Supply of CO2 type fire extinguisher capacity 4.5 Kg capacity ISI marked, with all accessories, operating temperature (-30) ° to (50) ° for class 13 B type of fire with 1 mtr. long hose pipe fitted with PVC bend horn, with carying handle and wall mounting brcket, complete in all respect. It should conform to IS 2878:2004. Extinguisher certificate has to be supplied along with the item. (Inspection by Consignee) | — | — | — | 2,52,512.5 | |
| — | 20.00 | — | — | ||
| Supply of Apparatus Case/Location Box Full as per RDSO Drg. no. RDSO/S-11500 or latest, with 'E' type lock and key ward no. 42. The key and handle should be supplied at the rate of one no. per four Apparatus cases. The 'E' type key lock is as per RDSO Spec. IRS; S30/64 or latest, RDSO Drg. no.SA 3376/M or latest and Key is as per Drg. No. 3377/M or latest. Note: This item includes the supply of 2 Nos E Type Lock fitted on both doors, along with two Keys. (Inspection by RITES) | — | — | — | 5,49,996.2 | |
| — | 10.00 | — | — | ||
| Supply of Apparatus Case/Location Box Half as per RDSO Drg. no. RDSO/S-11507 or latest, with 'E' type lock and key ward no. 42. The key and handle should be supplied at the rate of one no. per four Apparatus cases. The 'E' type key lock is as per RDSO Drg. no.SA 3376/M or latest and Key is as per Drg. No. 3377/M or latest. Note: This item includes the supply of 2 Nos E Type Lock fitted on both doors, along with two Keys. (Inspection by Consignee) | — | — | — | 1,99,046.9 | |
| — | 30.00 | — | — | ||
| Supply of Phenolic laminated Sheet, resin bonded, grade P3 in standard size of 1220 X 1220 x 10 mm as per spec. No IS 2036 of 1995 or latest. Test report of manufacture to be supplied. (Inspection by Consignee) | — | — | — | 1,74,813.9 | |
| — | 20.00 | — | — | ||
| Fabrication and fixing of phenolic laminated sheet of grade P3, minimum 10 mm thick, as per Apparatus case diagram/plan, in location box by providing all fixtures like ARA/Disconnect terminals, fuse blocks, fuses, relays on square bars etc. including fixing of PVC coated string rods at the back side for cable support with contractor's own material like iron angle, nuts, bolts etc. The iron angle for fixing shall be minimum 3 mm thick. This also includes fixing of teak wood shelf minimum 25 mm thick for holding track circuit equipments. The work shall be done as per instructions of Rly engineer at site. (Apparatus case Full) | — | — | — | 89,528.8 | |
| — | 10.00 | — | — | ||
| Fabrication and fixing of phenolic laminated sheet of grade P3, minimum 10 mm thick, as per Apparatus case diagram/plan, in location box by providing all fixtures like ARA/Disconnect terminals, fuse blocks, fuses, relays on square bars etc. including fixing of PVC coated string rods at the back side for cable support with contractor's own material like iron angle, nuts, bolts etc. The iron angle for fixing shall be minimum 3 mm thick. This also includes fixing of teak wood shelf minimum 25 mm thick for holding track circuit equipments. The work shall be done as per instructions of Rly engineer at site. (Apparatus case Half) | — | — | — | 24,281.8 | |
| — | 20.00 | — | — | ||
| Excavation, casting, curing of foundation and Installation and Erection of Apparatus case Full (App. Case as per drg. no. AGC/FULL LOC/2023/01 attached) with contractor's own frame, cement and other material in the ratio 1:3:6. 'E' type lock to be supplied and installed with App. case.This includes filling of location foundations with river bed sand and plastering on top with a mixture of 1:4 of cement and sand. It covers fixing of lamp holder , switch and lamp etc. in Apparatus Case. | — | — | — | 2,45,444.4 | |
| — | 10.00 | — | — | ||
| Excavation, casting, curing of foundation and Installation and Erection of Apparatus case Half (App. Case as per drg. no. AGC/HALF LOC/2023/01 attached) with contractor's own frame, cement and other material in the ratio 1:3:6.'E' type lock to be supplied and installed with App. case.This includes filling of location foundations with river bed sand and plastering on top with a mixture of 1:4 of cement and sand. It covers fixing of lamp holder , switch and lamp etc. in Apparatus Case. | — | — | — | 1,03,241.8 | |
| — | 20.00 | — | — | ||
| Provision of Fencing frame for GRS Apparatus case (Full) (Inspection by Consignee) | — | — | — | 4,27,143.2 | |
| — | 3000.00 | — | — | ||
| Supply of Disconnect Terminal block for four conductors with screwing cage/clamp type, sliding switch disconnect, as per RDSO spec. RDSO/SPN/189/2004 Ver. 3.0 or latest, for each conductor size up to 2.5 sq. mm, equivalent of M6 terminals. Each terminal block equipped with two markers, on top and bottom, an end plate, two end clamps and adequate lenght of rails for fitting terminal blocks. (Inspection by RDSO) | — | — | — | 5,78,160 | |
| — | 3000.00 | — | — | ||
| Fixing of ARA(M-6) Terminals /Screw less connectors / modular disconnect terminal blocks and fuse blocks on phenolic laminated sheets and fixing by stainless steel/brass nuts & bolts. This includes provision of two additional holes on the board on either side for cable conductor entry. The work shall be carried out a per instructions of railway Engineer incharge.(Supply of all above terminals has been covered separately). | — | — | — | 52,890 | |
| — | 5400.00 | — | — | ||
| Termination of Outdoor Cables (Main Cables /tail cables) at ARA/Disconnect type terminals provided in Apparatus Cases, Cable termination rack in relay room, station building, generator room etc. The item includes dressing of cables and wires with dressing threads as per standard practice. All material required for this item will be supplied by contractor. The outdoor cable shall be terminated in Relay Room, DG Room, ASM Room etc under supervision and instructions issued by Engr. incharge of the work. | — | — | — | 79,704 | |
| — | 1680.00 | — | — | ||
| Supply of Double Walled Corrugated (DWC) Pipe/duct with associated collars etc. as per RDSO Specification No. RDSO/SPN/204/2011 or latest anti-rodent & anti-oxidant and non flame propagating type in 6 meters straight length and of size 120 mm outer dia,& 103.5 mm inner dia. (The manufacturers, suppliers must produce valid IS license and should be certified under ISO 9000 and shall submit copy of certificate). One coupler with suitable rubber O-ring should be supplied with every 6m of pipe length. (The total quantity of above items is equal to no. of pipes supplied.) DWC pipe shall be marked at every 1 mtr length in such a way that manufacturer's name, vendor name and year of manufacture can be easily identified. (Inspection by RITES) | — | — | — | 10,19,541.6 | |
| — | 1680.00 | — | — | ||
| Horizontal Boring/Manual moling without damage to surface road /track for laying/isertion of DWC/GI/HDPE pipe. The bore shall be done at the depth of minimum 1400 mm from the ground level. The ground level shall be considered ignoring the bank height of the bank of the road. Note:- DWC/HDPE/GI Pipe Supply is not covered under this item. Contactor shall provide all material required for work and adequate nos. of labours for proper laying of cables into the bore. Cable shall be laid cautiously so that it should not get damage due to rough handling & pressure on cable. Payment of boring shall be made only after DWC/HDPE/GI pipe is laid in the bore. | — | — | — | 17,28,787.2 | |
| — | 30000.00 | — | — | ||
| Laying of S&T Cables of various cores/ pairs/ quads in trenches/ GI pipes/ RCC pipes/ DWC pipes etc. as per the site requirement and as per approved cable route plan. This also includes laying of cables in track crossings & road crossings.(Cables will be meggered before and after its laying by contractor under supervision of Railway Representative and he will submit the meggering report of each testing). Length of the cable laid includes the length of the cable coiled for termination purposes. | — | — | — | 2,05,200 | |
| — | 10000.00 | — | — | ||
| Excavation of cable trench as per cable route plan, 1.2 Mtr. deep and of 0.3 Mtr. to 0.6 Mtr. wide at bottom as per RDSO sketch No. SDO/CABLE LAYING/003, issued vide RDSO document no. RDSO/SI/G/2010 Version 1.1 dated 04.02.2014 or latest, alongside the track in normal soil/strata (including soft rock), conforming to distances as per cable route plan and refilling and ramming of loose soil. This work includes clearing of route from bushes etc, covering of cable laid in trench by loose soil for a layer of 50mm thickness approximately. The work shall be done as per the extant practice on North Central Railway and instructions of Railway Engineer at site. In case 1.2 m depth of trench is not achievable due to site conditions, specific approval of JAG/SG Officer will be required for each site where trench depth of 1.2m is not possible, only after approval of JAG/SG Officer proportionate payment can be done. | — | — | — | 6,46,900 | |
| — | 10.00 | — | — | ||
| SUPPLY OF MODULAR TYPE SS MEDUIM SIZE LOCATION BOX (Inspection by Consignee) | — | — | — | 4,34,360.1 | |
| — | 200.00 | — | — | ||
| Supply & application of high solids (68-70%) thin film non hygroscopic water based weather resistance fire stop cable coating. As per annexure-1 Make- STANVAC or similar (Inspection by Consignee) | — | — | — | 2,72,268 | |
| — | 200.00 | — | — | ||
| Supply of smoke detector tester, testing functioning of smoke detectors fire alarm testing (117 gm), upper temperature rateing-50 degrees celcius, make- AEROL, WESAF, SKF or higher. (Inspection by Consignee) | — | — | — | 3,36,300 | |
| — | 1.00 | — | — | ||
| Supply complete ink set of 06 colours 300 ml of hewlett-Packard 730b C, Y, M, G, MG and PB. (Inspection by Consignee) | — | — | — | 79,740 | |
| — | 100.00 | — | — | ||
| Excavation of jointing pit with out damaging the fiber for provision of joint chamber of 1.2 mtr dia, 60 cm height and 50 mm thickness. This includes backfilling and ramming of the trench/pit after placing the joint closure and cable loop in the chamber with out causing any damage to the same and consolidation of soil as well as disposal of soil as per plan and as per plan and as advised by Railway representative. (Supply of joint chambers are not to be provided by contractor. | — | — | — | 2,01,508 | |
| — | 2000.00 | — | — | ||
| On either side of the pit 5/10 mtrs of trench to be dug along side of the OFC already laid, to place the joint enclosouser the entire area to be covered with the excavated earth and should be rammed properly. The balance loose earth shall be heaped on the trench uniformly. Trenching (1.2 Mtr. depth.) | — | — | — | 1,96,440 | |
| — | 50.00 | — | — | ||
| Rectification/repairing of existing OFC joints this includes opening/finding the existing joint location, re-splicing, supply and provision of thermo shrink sealing on cable entry points or as required Or rectification/Repairing of existing OFC joints/faults by repairing/replacing the OFC patch cord wherever required. Note: All items required for repairing/rectification are to be supplyied by contractor. | — | — | — | 2,25,828.5 | |
| — | 5000.00 | — | — | ||
| Additional transport charges for attending OFC fault/failures by contractor team for OFC repairing /rectification work. | — | — | — | 51,750 | |
| — | 600.00 | — | — | ||
| Drawing & Printing of location box particulars & CTR drawings etc in A-3 size sheet in auto CAD alongwith binding (02 sets copy alongwith softcopy) (Inspection by consignee) | — | — | — | 2,11,620 | |
| — | 200.00 | — | — | ||
| Painting of two coats of Enamel paint over one coat of Red Oxide primer after scrapping and cleaning of the surface. Paint to be of reputed make Asian/Dulux/Berger or similar.App. Cases inside and outside to be done by Silver colour. (Apparatus Case Full) | — | — | — | 1,34,650 | |
| — | 300.00 | — | — | ||
| Lettering and Numbering of all S&T gears like Signals, Loc. Boxes, Pt. Machines, TLJBs, Block joints etc. Each item to be taken as one unit. | — | — | — | 25,083 | |
| — | 20.00 | — | — | ||
| Supply of Electrical lifting barrier booms of 9.76 meter (32 feet) long, in four sections of 8 feet each, as per RDSO spec. RDSO/SPN/208/2012 Ver.2.0 or latest and as per RDSO drawing no. RDSO/S/11600 or latest. (Inspection by Consignee) | — | — | — | 3,52,115.8 | |
| — | 150.00 | — | — | ||
| Supply of RCC Earth pit of size (300mm*300mm*300mm*50mm). (Inspection by Consignee) | — | — | — | 2,11,362 | |
| — | 100.00 | — | — | ||
| Supply of Q-Series Track Relay (QTA2 Type), AC immunized, 9 Ohms, 2F/1B along with plug board (base plate), connectors, retaining clips etc and conforming to BRS:939A & 966(Appendix F2) or latest and RDSO Specn. No. IRS : S - 34, S - 23 , S - 60 or latest, as applicable.The interlocking code for this unit shall be "FGHKX". (Inspection by RDSO) | — | — | — | 3,80,325 | |
| — | 60.00 | — | — | ||
| Supply of Contactor Unit (QBCA1 Type), 24 V DC, 2HF/4B complete with plug board(base plate), connectors, retaining clips etc and conforming to BRS- 943 and RDSO Specn.No. IRS : S - 34, S - 23 , S - 60 or latest, as applicable.The interlocking code for this unit shall be "BCEJK". (Inspection by RDSO) | — | — | — | 3,21,608.4 | |
| — | 170.00 | — | — | ||
| Switch Plate lubricant -Cenolube 100 or better NLGI 00GRADE Blackcolored which shouldbe non asphaltic Non bituminousblend of very heavy oils,inertthickeners andlubricatingsolids coupled withmolybdenum disulfide andgraphitewith no traces ofchlorinated solvent such as 1,1,1trichloroethane whichareflammable and harmful to theenvironment. Should have ablend of select highviscosityindex solvent refined severelyhydro finished paraffin base oilsandsynthetic base fluids. Itshould incorporate solidlubricants & organomolybdenumdisulphide to fill &lubricate micronized asperities toprovide & form many films onthecontact surfaces to preventmetal-to metal contact. It shallbe designed to behand appliedproviding a tough adherentLubricant film with Tacky semi-dry finishreducing contaminantadhesion. The grease Should Notform a difficult to removethickDRY film which requiresscrapping & solvent cleaning ofSwitch Plate speciallybeforereapplication Thegrease shouldNot need Cleaning or scrappingbeforeReapplication. The Greaseshould be formulated for tropicalclimates and should notcontainpour point depressants andshould Not be too thin. Thegrease shall beResistant to waterwash off & dilution, waterinsoluble, non-melt andchemicallyresistant to exposedenvironment. The grease shall beformulated with ExtremePressureadditives, rust and corrosioninhibitors, anti-wear additives toprotectexternal surfaces againstthe harsh elements in severeclimates, thus reducingrustbinding andadhesive wear onswitch plates Four Ball WeldLOAD (ASTMD2596)> 600 Kg,Copper corrosion 24 hrs @ 100c(ASTM D 4048) 1a -2e packingSize 20 kg/25kg Drum. (Inspection by RITES) | — | — | — | 8,38,917.7 | |
| — | 200.00 | — | — | ||
| Dismantling and Releasing of existing Location boxes/Apparatus cases/Jn boxes and other associated S&T fittings in station section. All the released material will be transported to the SSE/Consignee depot. | — | — | — | 1,83,488 | |
| — | 20.00 | — | — | ||
| Fixing, wiring, testing and commissioning of Electrical Point Machine on the Wooden/PRC sleepers at points as per standard practice and as per section of rails used. Item includes fixing switch extension bracket, providing insulation for switch extension bracket, fixing ground connection, adjusting opening of the switches and adjusting the point machine with crank handle.The item also includes : (i) Complete material for installation like ground-connections, switch extension brackets, point insulation material, I pipes, wiring materials, various fixing nuts & bolts including castle nuts, spring washers (ii) All smithy & fitting works required at site for complete installation. (iii) Installation of gauge tie plate & providing insulation for gauge tie plate (Insulation in William Stretcher Bar will be provided by Railways). (iv) Wiring inside the point machine, insertion and termination of tail cable in point machine and junction boxes / location box /cable hut as per extent practice on NCR and the instruction of Railway Engineer at site. (v) Supply and fixing of bend pipes with welded frame for cable entry to machine. (vi) Supply and filling of industrial grade/good quality lubricant/grease/oil for smooth opertion of point machine | — | — | — | 2,89,028.6 | |
| — | 70.00 | — | — | ||
| Supply of battery cable & terminal protector (Corium Z107, Enecon/Lupromad 500 ML cane each) Make Corium Z or similar. (Inspection by RITES) | — | — | — | 5,69,114 | |
| — | 70.00 | — | — | ||
| Supply of Battery cleanor & Terminal conditioner (Make Corium Enecon/Lupromax 500 M cane each) Make Corium Z or similar. (Inspection by Consignee) | — | — | — | 4,86,514 | |
| — | — | — | Z-105, | ||
| — | 20.00 | — | — | ||
| Supply and installatin of 13.5 15 Amp SMPS Power supply having float cum boost chargering option ofr 25 Watt VHF sets vattert cgargubg. Make AXIO or similar. (Inspection by Consignee) | — | — | — | 63,189 | |
| — | 4.00 | — | — | ||
| Supply of CEL-1 card cosnsist of 4 port 10/100 Mbps ethernet prot for TJ 1400 without any accessories. (Inspection by Consignee) | — | — | — | 3,22,320 | |
| — | 100.00 | — | — | ||
| Supply of Limit switch new top roller type with 2 NO+2NC contact suitable for Heidz India electric lifting barrier (Inspection by Consignee) | — | — | — | 48,073 | |
| — | 100.00 | — | — | ||
| Supply of Limit switch new top roller type with 2 NO+2NC contact suitable for Globle electric lifting barrier. (Inspection by Consignee) | — | — | — | 45,461 | |
| — | 20.00 | — | — | ||
| Supply of DTMF Microphone suitable for Sanchar SCM-920D VHF: SMICDS=920D (Inspection by Consignee) | — | — | — | 42,480 | |
| — | 15.00 | — | — | ||
| Supply of SMPS Powr supply 10Amp 12V. (Inspection by Consignee) | — | — | — | 53,100 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .