Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹50.7 L+₹4.1 L (8.89%)Accepted-AOC BYLINE NO 9 HOUSE NO 972 SARUMATARIA HENGRABARI GUWAHATI 36 | GUWAHATI | KAMRUP | ASSAM | 781036 | L2 | Accepted-AOC Contract Awarded | |
| 2 | L1₹46.6 LRejected-AOC HOUSING COLONY UDAYAN PATH DISPUR RUKMINI GAON KAMRUP ASSAM 781006 | KAMRUP METRO | ASSAM | 781006 | L1 | Rejected-AOC Contract not Awarded | |
| 3 | L2₹50.7 L+₹4.1 L (8.89%)Rejected-AOC | L2 | Rejected-AOC Contract not Awarded | |
| 4 | L2₹50.7 L+₹4.1 L (8.89%)Rejected-AOC HOUSE NO 47 SUPRABHA PATH SIJUBARI P O HATIGAON P S HATIGAON DIST KAMRUP M GUWAHATI 38 | GUWAHATI | KAMRUP M | ASSAM | 781038 | L2 | Rejected-AOC Contract not Awarded | |
| 5 | L2₹50.7 L+₹4.1 L (8.89%)Rejected-AOC | L2 | Rejected-AOC Contract not Awarded |
Tender Value
₹51.7 L
EMD Value
₹1.0 L
Closing Date
21 Oct 2020, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Director, Soil Conservation Deptt.
Directorate of Soil Conservation Deptt., Ghy-05, Assam
INTEGRATED WATER HARVESTING CUM DISTRIBUTION PROJECT AT NIBIRA UNDER RIDF XXV DURING 2019-20
2020_SCD_18915_4
E-TEN-1/2020-21/2450 DT.12-10-2020
Open Tender
Civil Works
Works
1095 days
Guwahati
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
Director, Soil Conservation Deptt.
₹1.0 L
Yes
5 Dec 2020
12 Oct 2020
22 Oct 2020
12 Oct 2020
21 Oct 2020
14 Oct 2020
999 days
Amount
Part - A : RCC Check Dam at Nibira
Cost for construction of temporary camp hut to provide acccomudation to the staffs, masons and labours as well as storage of materials at the project site.
Cost for installation of tube well including fitting & fixing and supplying all necessary materials.
Earthwork in excavation for construction of diversion channel to divert the flow of water from the proposed site of RCC Check Dam during the construction.
Construction of Approach Road for carriage of materials to the work site.
Earth work in excavation of foundation of structures as per drawing & technical specifications, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, back filling the excavated earth etc. complete as per directed.
Plain Cement Concrete (1:3:6) in foundation mixed with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Reinforced Cement Concrete work in sub- sturucture complete as per drawing & technical specifications including steel shuttering formwork.
Supplying fitting and placing TMT IS:1786 (Fe-500) bar reinforcement in sub-sturcture complete as per drawing and technical specifications.
Plastering with cement mortar (1:3) on all walls in sub-structures as per technical specifications.
Providing and laying boulder apron on river bed for protection against scour with stone boulders weighing not less than 40 kg. each complete in front of head wall and behind the toe wall as per drawing and technical specifications. Boulder Pitching Work : Boulders laid down without wire crates.
Providing and laying boulder apron on river bed for protection against scour with stone boulders weighing not less than 40 kg. each complete in front of head wall and behind the toe wall as per drawing and technical specifications. Boulder Revetment Work : Boulders laid down with wire crates.
Earthwork in filling for closing the diversion channel after completion of work.
Earthwork in filling in infront of head wall and guide bund with approved material obtained from borrow pits with al lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement etc. complete as per drawing and technical specifications.
Cost for RCC singboard including engraved letter, colouring and fitting & fixing and supplying all necessary materials at the project site.
Part - B : RCC Check Dam at Nibira
Cost for construction of temporary camp hut to provide acccomudation to the staffs, masons and labours as well as storage of materials at the project site.
Cost for installation of tube well including fitting & fixing and supplying all necessary materials.
Earthwork in excavation for construction of diversion channel to divert the flow of water from the proposed site of RCC Check Dam during the construction.
Construction of Approach Road for carriage of materials to the work site.
Earth work in excavation of foundation of structures as per drawing & technical specifications, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, back filling the excavated earth etc. complete as per directed.
Plain Cement Concrete (1:3:6) in foundation mixed with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Reinforced Cement Concrete work in sub- sturucture complete as per drawing & technical specifications including steel shuttering formwork.
Supplying fitting and placing TMT IS:1786 (Fe-500) bar reinforcement in sub-sturcture complete as per drawing and technical specifications.
Plastering with cement mortar (1:3) on all walls in sub-structures as per technical specifications.
Providing and laying boulder apron on river bed for protection against scour with stone boulders weighing not less than 40 kg. each complete in front of head wall and behind the toe wall as per drawing and technical specifications. Boulder Pitching Work : Boulders laid down without wire crates.
Providing and laying boulder apron on river bed for protection against scour with stone boulders weighing not less than 40 kg. each complete in front of head wall and behind the toe wall as per drawing and technical specifications. Boulder Revetment Work : Boulders laid down with wire crates.
Earthwork in filling for closing the diversion channel after completion of work.
Earthwork in filling in infront of head wall and guide bund with approved material obtained from borrow pits with al lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement etc. complete as per drawing and technical specifications.
Cost for RCC singboard including engraved letter, colouring and fitting & fixing and supplying all necessary materials at the project site.
Part - C : RCC Check Dam at Nibira
Construction of earthen cross bund to divert the flow of water during the construction of RCC Check Dam.
Cost for installation of tube well including fitting & fixing and supplying all necessary materials.
Earthwork in excavation for construction of diversion channel to divert the flow of water from the proposed site of RCC Check Dam during the construction.
Construction of Approach Road for carriage of materials to the work site.
Earth work in excavation of foundation of structures as per drawing & technical specifications, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, back filling the excavated earth etc. complete as per directed.
Plain Cement Concrete (1:3:6) in foundation mixed with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Reinforced Cement Concrete work in sub- sturucture complete as per drawing & technical specifications including steel shuttering formwork.
Supplying fitting and placing TMT IS:1786 (Fe-500) bar reinforcement in sub-sturcture complete as per drawing and technical specifications.
Plastering with cement mortar (1:3) on all walls in sub-structures as per technical specifications.
Providing and laying boulder apron on river bed for protection against scour with stone boulders weighing not less than 40 kg. each complete in front of head wall and behind the toe wall as per drawing and technical specifications. Boulder Pitching Work : Boulders laid down without wire crates.
Providing and laying boulder apron on river bed for protection against scour with stone boulders weighing not less than 40 kg. each complete in front of head wall and behind the toe wall as per drawing and technical specifications. Boulder Revetment Work : Boulders laid down with wire crates.
Earthwork in filling for closing the diversion channel after completion of work.
Earthwork in filling in infront of head wall and guide bund with approved material obtained from borrow pits with al lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement etc. complete as per drawing and technical specifications.
Cost for RCC singboard including engraved letter, colouring and fitting & fixing and supplying all necessary materials at the project site.
Part - D : Brick Canal at Nibira
Earth work in excavation of foundation trenches of walls, footings of columns, steps, etc. as per drawing & technical specifications, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, return filling the excavated earth etc. complete as directed.
Providing brick soling in earthen shoulder with stone/best quality jhama brick, sand packed and laid to true line and level and in panel after preparing the sub grade including earthwork in excavation as directed including all labour and materials etc. complete as directed. (a) Brick on flat soling.
Plain Cement Concrete (1:3:6) in foundation mixed with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Brick work in cement morter with 1st class brick including racking out joints and curing etc. complete as per drawing and technical specification.
Supplying fitting and placing TMT IS:1786 (Fe-500) bar reinforcement in sub-sturcture complete as per drawing and technical specifications.
Reinforced Cement Concrete work in sub- sturucture complete as per drawing & technical specifications including steel shuttering formwork.
Plastering with cement mortar (1:3) on brick works in sub-structures as per drawing and technical specifications.
Cost for RCC singboard including engraved letter, colouring and fitting & fixing and supplying all necessary materials at the project site.
A.B. Construction
STANDARD CREATION
ABDUL HASIM
MS VIBGYOR
Manikanchan Traders
RANJAN DAS
stage.html
html • 0.06 MB
techsummary_29274.pdf
PDF • 0.41 MB
BOQ Comparative Chart
xlsx • 0.01 MB
finsummary_29274.pdf
PDF • 0.22 MB
nibira.pdf
PDF • 0.22 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .