Loading…
Loading…
Tender Value
₹1.5 L
EMD Value
₹2,912
Closing Date
27 Jul 2026, 6:00 pm2d left
Executive Engineer REW Doda
Office of the Executive Engineer REW Doda
Toilet Complex NHO Ramesh Chander W.No 1 Pyt Bulandpur Block Assar (DDC Grant)
2026_RDPR_315855_9
e-NIT No 25 of REW Doda 2026-27 Dated.13.07.2026
Open Tender
Civil Works
Percentage
30 days
Doda
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Rural Development and Panchayati Raj
₹2,912
13 Jul 2026
13 Jul 2026
28 Jul 2026
13 Jul 2026
27 Jul 2026
13 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:All kinds of soil : | 9.15 | Cum | 479.3 | ₹4,385.6 |
| 0.0 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 0.33 | Cum | 4,826.5 | ₹1,592.75 |
| 0.0 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) | 1.89 | Cum | 5,402.9 | ₹10,211.48 |
| 0.0 | Dry random rubble masonry with hard stone in foundation and plinth: Without bond stone | 3.54 | Cum | 2,793.8 | ₹9,890.05 |
| 0.0 | Random Rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including levelling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) and curing complete at window sills, ceiling level and the like: Cement mortar 1:6 (1 Cement : 6 coarse sand) | 5.52 | Cum | 6,857.45 | ₹37,853.12 |
| 0.0 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral
stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 0.85 | Cum | 9,821.85 | ₹8,348.57 |
| 0.0 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | 76.54 | Kg | 123.2 | ₹9,429.73 |
| 0.0 | 6 mm cement plaster to ceiling of mix 1 : 3 (1 cement : 3 fine sand) | 1.86 | Sqm | 241.25 | ₹448.73 |
| 0.0 | 20mm Cement plaster of mix: 1 : 6 ( 1 cement : 6 fine sand) | 31.23 | Sqm | 362.65 | ₹11,325.56 |
| 0.0 | Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. | 27.19 | Kg | 181.6 | ₹4,937.7 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.32 MB
BOQ_1026522.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].