Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.2 LAdmitted-Finance | -15.00% | ₹4.2 L | L1 | Admitted-Finance |
| 2 | L2₹4.5 L+₹21,446.81 (5.06%)Admitted-Finance | -7.99% | ₹4.5 L+₹21,446.81 (5.06%) | L2 | Admitted-Finance |
| 3 | L3₹4.5 L+₹25,663.68 (6.06%)Admitted-Finance | -10.25% | ₹4.5 L+₹25,663.68 (6.06%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical Valid Registration Certificate not enclosed |
| Sl No | Description | Qty | Unit | MANDEEP CONSTRUCTION L3 | MS SUDESH SAINI L2 | M/S Shri Bala ji construction. L1 |
|---|---|---|---|---|---|---|
| .01PART- B (Item Rate Basis) | ||||||
| 1.00 | Cleaning of roof of various bldg including brooming of surface by broom neatly clean the surface by removing the dust and other unwanted material laid on surface by manually, and dispose the rubbish dust and other material outside the campus including all required labour T&P and as per directions of engineer in charge. | 3,000 | Sqm. | 7 ₹21,000 | 6 ₹18,000 | 2 ₹6,000 Lowest |
Tender Value
₹5.5 L
EMD Value
₹11,000
Closing Date
6 Jul 2026, 3:00 pmClosed
SE (CIVIL) JPD, JAIPUR
OFFICE OF THE SE (CIVIL) JPD, JAIPUR OLD POWER HOUSE PREMISES, NEAR RAM MANDIR, BANIPARK, JAIPUR
Roof leakage protection works at various 33 KV S/S Under XEN (CD) Alwar, XEN (DD) Alwar
2026_JVVNL_570217_9
NIT-03/2026-27/SE CIVIL JAIPUR
Open Tender
Civil Works
Percentage
60 days
ALWAR
Please refer Tender documents.
3 documents required · 3 mandatory
₹236
AO (O AND M) JVVNL, ALWAR
₹11,000
Yes
ALWAR
15 Jul 2026
23 Jun 2026
8 Jul 2026
23 Jun 2026
6 Jul 2026
23 Jun 2026
23 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.001 | PART-A | - | - | - | - |
| 1 | (B-12.1.1)
Plaster on new surface on wall in cement sand mortar 1:3 including racking of joints etc. complete fine finish :
25 mm thick | 300 | sqm | 242 | ₹72,600 |
| 2 | (B-139/12.2.2)
Plaster on new surface on walls in cement sand mortar 1:4 including racking of joint etc. complete fine finish:
20mm thick. | 120 | Sqm. | 202 | ₹24,240 |
| 3 | (B-109/10.22)
Providing gola 75x75 mm in cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 stone aggregate 10mm and down gauge) including finishing with cement mortar 1:3 (1 cement : 3 fine sand) as per standard design : | 150 | Mtr. | 111 | ₹16,650 |
| 4 | (B-12.7)
Finishing with neat cement ( punning ) | 3,000 | sqm | 36 | ₹1,08,000 |
| 5 | (B-15.28.1)
Nano technology water proofing, thermal insulation protection coating :
Nano technology water proofing, thermal insulation protection coating 12 layer process for increasing life of building and damage control for roof.-- before coating scaling, cleaning, and preparing surface for treatment. Opening all joint and cracks and filling them with nano technology crack filling hydrophobic chemical with 2/3 coats. then after drying doing a PCC coat on cracks. One coat of nano technology hydrophobic/oiliophobic primer. Nano technology water proofing treatment in3 coats non silicon based applied with fiber mesh sheets in medium. Nano technology thermal insulation coating highly elasticity in nature with 3 coats with 1000 micron width.2top coats of anti stain, anti slippery, natural transparent high shine chemical for better life of the treatment. | 220 | Sqm. | 1,162 | ₹2,55,640 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.05 MB
BOQ_1015215.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .