| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 CrAccepted-AOC VILL NIZ KAURBAHA P O BARGHULI P S TAMULPUR BAKSA BTAD ASSAM PIN 781367 | BAKSA | ASSAM | 781367 | ₹2.0 Cr | L1 | Accepted-AOC lowest quoted bidder |
| 2 | L2₹2.0 Cr+₹37.01 (<0.01%)Rejected-Finance | ₹2.0 Cr+₹37.01 (<0.01%) | L2 | Rejected-Finance work allotted to lowest quoted bidder |
| Sl No | Description | Qty | Unit | Abdul Motaleb L2 | ABDUL SAMAD CHOUDHURY L1 |
|---|---|---|---|---|---|
| 1.00 | Construction of Afflux Bund at U/S (Right Side)
Item No 6.31(B):-Earthwork in filling in all soils in canal embankment and bed filling as per design section and grade by cart carriage for a minimum distance of 1 KM including paying compensation of earth obtained from private land if any loading, unloading, spreading the same in embankment in layers not exceeding 15 cm thick including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment, breaking clods not more than 10 mm cube, ramming, dressing and roughening the seat of the embankment, profiling etc. with all lift, complete as directed. (Payment will be made after
deduction of 12.50% shrinkage allowance from the gross quantity). | 5,406.98 | CM | 713.73 ₹38,59,123.84 Lowest | 713.73 ₹38,59,123.84 Lowest |
| 2.00 | Item No.6.7:- Earthwork in excavation trenches of walls, retaining walls, footing of columns, steps and septic tank including refilling (return filling) the quantity as necessary after completion of works, breaking clods in
return filling, dressing, ramming, watering etc. and removal of surplus earth with all lead and lift upto 2
metre as directed and specified in following classification of soils, including bailing out of water where necessary upto depth below the existing ground level as mentioned in the approved drawing and
complete as directed and specified. | 100 | CM | 729.21 ₹72,921 Lowest | 729.21 ₹72,921 Lowest |
| 3.00 | Item No.1.6:- Collection of sand gravel (40% sand and 60% gravel of size 25 mm to 60 mm) free from dust and dirt including stacking in measurable stacks at quarry site and complete as directed. | 74.13 | CM | 944.82 ₹70,039.51 Lowest | 944.83 ₹70,040.25 |
| 4.00 | Item No.1.2:- Collection of one man size 25 cm to 30 cm hard river boulder including stacking in measurable stacks of not more than 1.00 M height at quarry site and complete as directed. | 88.95 | CM | 1,077.09 ₹95,807.16 Lowest | 1,077.09 ₹95,807.16 Lowest |
| 5.00 | Item No.2.1:- Carriage of boulders, gravels, metal screening, stacking in measurable stacks at site, complete as directed. | 163.08 | CM | 1,147.98 ₹1,87,212.58 | 1,147.97 ₹1,87,210.95 Lowest |
| 6.00 | Item No.21.1(B) :-Labour charge for spreading of hard river gravel or broken stone of size 13 mm to 38 mm to the required thickness including dressing and ramming the seat before laying the materials as directed with a lead upto 30 M and lift upto 1.5 M, complete as directed. | 74.13 | CM | 482.65 ₹35,778.84 Lowest | 482.66 ₹35,779.59 |
| 7.00 | Item no.21.1:-Labour charge for pitching with one man size boulder including dressing and ramming the seat to proper size and slope, pitching etc. with local carriage of boulders from a distance of 60 M with lift upto 3 M, complete as directed. | 88.95 | CM | 897.11 ₹79,797.93 Lowest | 897.13 ₹79,799.71 |
| 8.00 | [§ Item No.: 21.2(C)] Construction of boulder sausage work of size 1.00 m x 1.00 m, including suppying of all materials with 23 cm to 30 cm size river boulder collected from a lead of 50.00 KM encaged in 15cmx15cm mesh in 8G/10G hexagonal wire netting of filling th voids between boulder tied with 10G/18G galvd tying wire at 30 cm apart laid in position as per direction including necessary local carriage of materials paying necessary forest royalty including providing 1.00 no. of whole Jati bamboo horizontal runner along the top of the sausage with vertical bhaluka bamboo post 1.50 m apart driven at least 0.60 m below ground and tying with sausage etc. all complete as directed. | 100 | Rm | 7,668.45 ₹7,66,845 Lowest | 7,668.45 ₹7,66,845 Lowest |
| 9.00 | Construction of Guide Bund at D/S (Both Side)
Item No 6.31(B):-Earthwork in filling in all soils in canal embankment and bed filling as per design section and grade by cart carriage for a minimum distance of 1 KM including paying compensation of earth obtained from private land if any loading, unloading, spreading the same in embankment in layers not exceeding 15 cm thick including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment, breaking clods not more than 10 mm cube, ramming, dressing and roughening the seat of the embankment, profiling etc. with all lift, complete as directed. (Payment will be made after
deduction of 12.50% shrinkage allowance from the gross quantity). | 8,218.67 | CM | 713.73 ₹58,65,911.34 Lowest | 713.73 ₹58,65,911.34 Lowest |
| 10.00 | Item No.6.7:- Earthwork in excavation trenches of walls, retaining walls, footing of columns, steps and septic tank including refilling (return filling) the quantity as necessary after completion of works, breaking clods in
return filling, dressing, ramming, watering etc. and removal of surplus earth with all lead and lift upto 2
metre as directed and specified in following classification of soils, including bailing out of water where necessary upto depth below the existing ground level as mentioned in the approved drawing and
complete as directed and specified. | 85 | CM | 729.11 ₹61,974.35 | 729.09 ₹61,972.65 Lowest |
Tender Value
₹2.0 Cr
EMD Value
₹4.0 L
Closing Date
2 Aug 2025, 12:00 pmClosed
Addl. Chief Engineer cum CHD Irrigation, BTC Kokra
O/o the Addl. Chief Engineer cum CHD Irrigation, BTC Kokrajhar
Construction of D/S Guidebund (B/S) and U/S Afflux bund (R/S) at Khatarbari Oronga Bundh FIS under SOPD(BTC) for the year 2025-26
2025_BoTC_45776_1
NIT NO. ACE/CHDI/ 10/2025/11 dated 18/07/2025
Open Tender
Civil Works
Works
365 days
Suklai area
Please refer Tender documents.
4 documents required · 4 mandatory
₹4,000
₹4.0 L
Yes
13 Aug 2025
19 Jul 2025
2 Aug 2025
19 Jul 2025
2 Aug 2025
21 Jul 2025
Amount
Construction of Afflux Bund at U/S (Right Side) Item No 6.31(B):-Earthwork in filling in all soils in canal embankment and bed filling as per design section and grade by cart carriage for a minimum distance of 1 KM including paying compensation of earth obtained from private land if any loading, unloading, spreading the same in embankment in layers not exceeding 15 cm thick including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment, breaking clods not more than 10 mm cube, ramming, dressing and roughening the seat of the embankment, profiling etc. with all lift, complete as directed. (Payment will be made after deduction of 12.50% shrinkage allowance from the gross quantity).
Item No.6.7:- Earthwork in excavation trenches of walls, retaining walls, footing of columns, steps and septic tank including refilling (return filling) the quantity as necessary after completion of works, breaking clods in return filling, dressing, ramming, watering etc. and removal of surplus earth with all lead and lift upto 2 metre as directed and specified in following classification of soils, including bailing out of water where necessary upto depth below the existing ground level as mentioned in the approved drawing and complete as directed and specified.
Item No.1.6:- Collection of sand gravel (40% sand and 60% gravel of size 25 mm to 60 mm) free from dust and dirt including stacking in measurable stacks at quarry site and complete as directed.
Item No.1.2:- Collection of one man size 25 cm to 30 cm hard river boulder including stacking in measurable stacks of not more than 1.00 M height at quarry site and complete as directed.
Item No.2.1:- Carriage of boulders, gravels, metal screening, stacking in measurable stacks at site, complete as directed.
Item No.21.1(B) :-Labour charge for spreading of hard river gravel or broken stone of size 13 mm to 38 mm to the required thickness including dressing and ramming the seat before laying the materials as directed with a lead upto 30 M and lift upto 1.5 M, complete as directed.
Item no.21.1:-Labour charge for pitching with one man size boulder including dressing and ramming the seat to proper size and slope, pitching etc. with local carriage of boulders from a distance of 60 M with lift upto 3 M, complete as directed.
[§ Item No.: 21.2(C)] Construction of boulder sausage work of size 1.00 m x 1.00 m, including suppying of all materials with 23 cm to 30 cm size river boulder collected from a lead of 50.00 KM encaged in 15cmx15cm mesh in 8G/10G hexagonal wire netting of filling th voids between boulder tied with 10G/18G galvd tying wire at 30 cm apart laid in position as per direction including necessary local carriage of materials paying necessary forest royalty including providing 1.00 no. of whole Jati bamboo horizontal runner along the top of the sausage with vertical bhaluka bamboo post 1.50 m apart driven at least 0.60 m below ground and tying with sausage etc. all complete as directed.
Construction of Guide Bund at D/S (Both Side) Item No 6.31(B):-Earthwork in filling in all soils in canal embankment and bed filling as per design section and grade by cart carriage for a minimum distance of 1 KM including paying compensation of earth obtained from private land if any loading, unloading, spreading the same in embankment in layers not exceeding 15 cm thick including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment, breaking clods not more than 10 mm cube, ramming, dressing and roughening the seat of the embankment, profiling etc. with all lift, complete as directed. (Payment will be made after deduction of 12.50% shrinkage allowance from the gross quantity).
Item No.6.7:- Earthwork in excavation trenches of walls, retaining walls, footing of columns, steps and septic tank including refilling (return filling) the quantity as necessary after completion of works, breaking clods in return filling, dressing, ramming, watering etc. and removal of surplus earth with all lead and lift upto 2 metre as directed and specified in following classification of soils, including bailing out of water where necessary upto depth below the existing ground level as mentioned in the approved drawing and complete as directed and specified.
Item No.1.6:- Collection of sand gravel (40% sand and 60% gravel of size 25 mm to 60 mm) free from dust and dirt including stacking in measurable stacks at quarry site and complete as directed.
Item No.1.2:- Collection of one man size 25 cm to 30 cm hard river boulder including stacking in measurable stacks of not more than 1.00 M height at quarry site and complete as directed.
Item No.2.1:- Carriage of boulders, gravels, metal screening, stacking in measurable stacks at site, complete as directed.
Item No.21.1(B) :-Labour charge for spreading of hard river gravel or broken stone of size 13 mm to 38 mm to the required thickness including dressing and ramming the seat before laying the materials as directed with a lead upto 30 M and lift upto 1.5 M, complete as directed.
Item no.21.1:-Labour charge for pitching with one man size boulder including dressing and ramming the seat to proper size and slope, pitching etc. with local carriage of boulders from a distance of 60 M with lift upto 3 M, complete as directed.
[§ Item No.: 21.2(C)] Construction of boulder sausage work of size 1.00 m x 1.00 m, including suppying of all materials with 23 cm to 30 cm size river boulder collected from a lead of 50.00 KM encaged in 15cmx15cm mesh in 8G/10G hexagonal wire netting of filling th voids between boulder tied with 10G/18G galvd tying wire at 30 cm apart laid in position as per direction including necessary local carriage of materials paying necessary forest royalty including providing 1.00 no. of whole Jati bamboo horizontal runner along the top of the sausage with vertical bhaluka bamboo post 1.50 m apart driven at least 0.60 m below ground and tying with sausage etc. all complete as directed.
[§ Item No.: 22.6] Labour for dismantling of old CC work and stacking the spoils at suitable place including local carriage, complete as directed.
Abdul Motaleb (BID ID -274166)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .