Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹2.0 CrAccepted-AOC | L-1 | Accepted-AOC Work awarded to lowest Contractor. | |
| 2 | L-2₹2.1 Cr+₹15,423.40 (0.07%)Rejected-Finance VILLAGE BARAL PO KARSOG TEHSIL KARSOG DISTT MANDI HP | MANDI | HIMACHAL PRADESH | 175001 | L-2 | Rejected-Finance Due to L-2 |
| Sl No | Description | Qty | Unit | NITIN BHARDWAJ L2 | GHANSHYAM LAL L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains, including dressing of sides and ramming of bottoms, including getting out the excavated soil and disposal of surplus excavated soil as directed. All kinds of soil, including carriage of materials through all modes of transportation with in all leads and lifts, as per PWD specifications and as per direction of the Engineer-in-charge including all incidentals. The rates are inclusive of octroi, royaltiy, malkana, toll tax, GST or other taxes imposed by the Government. | 955.64 | Per Cubic meter | 350 ₹3,34,474 Lowest | 400 ₹3,82,256 |
| 2.00Centering and shuttering including strutting, propping etc. and removal of form, including carriage of materials through all modes of transportation with in all leads and lifts, as per PWD specifications and as per direction of the Engineer-in-charge including all incidentals. The rates are inclusive of octroi, royaltiy, malkana, toll tax, GST or other taxes imposed by the Government. | |||||
| 2.01 | Foundations, footings, bases of columns, etc. for mass concrete | 502.45 | Per Square meter | 400 ₹2,00,980 | 350 ₹1,75,857.5 Lowest |
| 2.02 | Suspended floors, roofs, landings, balconies and access platform | 188.57 | Per Square meter | 800 ₹1,50,856 | 750 ₹1,41,427.5 Lowest |
| 2.03 | Lintels, beams, plinth beams, girders, bressumers and cantilevers | 157.62 | Per Square meter | 700 ₹1,10,334 | 650 ₹1,02,453 Lowest |
| 2.04 | Edges of slabs and breaks in floors and walls. | 18 | Per Running meter | 400 ₹7,200 | 350 ₹6,300 Lowest |
| 2.05 | Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 61 | Per Square meter | 710 ₹43,310 | 700 ₹42,700 Lowest |
| 3.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (one cement : five coarse sand: ten graded stone aggregate 40 mm(fourty millimeter) nominal size), including carriage of materials through all modes of transportation with in all leads and lifts, as per PWD specifications and as per direction of the Engineer-in-charge including all incidentals. The rates are inclusive of octroi, royaltiy, malkana, toll tax, GST or other taxes imposed by the Government. | 21.38 | Per Cubic meter | 10,500 ₹2,24,490 | 10,000 ₹2,13,800 Lowest |
| 4.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth levelts, 1:4:8 (one Cement : four coarse sand : 8 graded stone aggregate 40 mm(fourty milliteter) nominal size), including carriage of materials through all modes of transportation with in all leads and lifts, as per PWD specifications and as per direction of the Engineer-in-charge. | 73.64 | Per Cubic meter | 10,510 ₹7,73,956.4 | 10,500 ₹7,73,220 Lowest |
| 5.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:2:4 (one Cement : two coarse sand) : four graded stone aggregate 40 mm(fourty millimeter) nominal size), including carriage of materials through all modes of transportation with in all leads and lifts, as per PWD specifications and as per direction of the Engineer-in-charge including all incidentals. The rates are inclusive of octroi, royaltiy, malkana, toll tax, GST or other taxes imposed by the Government. | 78.37 | Per Cubic meter | 11,100 ₹8,69,907 | 11,000 ₹8,62,070 Lowest |
Tender Value
₹2.0 Cr
EMD Value
₹3.9 L
Closing Date
6 Jul 2023, 5:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Executive Engineer, Kalpa Division, HP.PWD. Kalpa
C/O Museum at Kalpa in District Kinnaur HP (SH- Building portion, WS and SI, C/O Septic Tank and site development
2023_PWD_75542_3
PW-KNR-E-Tender/23-2048-57 dated 22-06-2023
Open Tender
Civil Works - Buildings
Item Rate
730 days
Kalpa
Please refer Tender documents.
8 documents required · 8 mandatory
₹5,000
₹3.9 L
Yes
5 Oct 2026
28 Jun 2023
7 Jul 2023
28 Jun 2023
6 Jul 2023
28 Jun 2023
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains, including dressing of sides and ramming of bottoms, including getting out the excavated soil and disposal of surplus excavated soil as directed. All kinds of soil, including carriage of materials through all modes of transportation with in all leads and lifts, as per PWD specifications and as per direction of the Engineer-in-charge including all incidentals. The rates are inclusive of octroi, royaltiy, malkana, toll tax, GST or other taxes imposed by the Government. | 955.64 | Per Cubic meter | - | - |
| 2Centering and shuttering including strutting, propping etc. and removal of form, including carriage of materials through all modes of transportation with in all leads and lifts, as per PWD specifications and as per direction of the Engineer-in-charge including all incidentals. The rates are inclusive of octroi, royaltiy, malkana, toll tax, GST or other taxes imposed by the Government. | |||||
| 2.01 | Foundations, footings, bases of columns, etc. for mass concrete | 502.45 | Per Square meter | - | - |
| 2.02 | Suspended floors, roofs, landings, balconies and access platform | 188.57 | Per Square meter | - | - |
| 2.03 | Lintels, beams, plinth beams, girders, bressumers and cantilevers | 157.62 | Per Square meter | - | - |
| 2.04 | Edges of slabs and breaks in floors and walls. | 18 | Per Running meter | - | - |
| 2.05 | Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 61 | Per Square meter | - | - |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (one cement : five coarse sand: ten graded stone aggregate 40 mm(fourty millimeter) nominal size), including carriage of materials through all modes of transportation with in all leads and lifts, as per PWD specifications and as per direction of the Engineer-in-charge including all incidentals. The rates are inclusive of octroi, royaltiy, malkana, toll tax, GST or other taxes imposed by the Government. | 21.38 | Per Cubic meter | - | - |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth levelts, 1:4:8 (one Cement : four coarse sand : 8 graded stone aggregate 40 mm(fourty milliteter) nominal size), including carriage of materials through all modes of transportation with in all leads and lifts, as per PWD specifications and as per direction of the Engineer-in-charge. | 73.64 | Per Cubic meter | - | - |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:2:4 (one Cement : two coarse sand) : four graded stone aggregate 40 mm(fourty millimeter) nominal size), including carriage of materials through all modes of transportation with in all leads and lifts, as per PWD specifications and as per direction of the Engineer-in-charge including all incidentals. The rates are inclusive of octroi, royaltiy, malkana, toll tax, GST or other taxes imposed by the Government. | 78.37 | Per Cubic meter | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
Tender Document • 0.70 MB
SBD.pdf
Tender Document • 3.50 MB
BOQ_113196.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .