Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.8 CrAdmitted-Finance | -7.00% | ₹2.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.8 CrAdmitted-Finance | -6.00% | ₹2.8 Cr | L2 | Admitted-Finance |
| 3 | L3₹2.9 CrAdmitted-Finance | -5.00% | ₹2.9 Cr | L3 | Admitted-Finance |
| 4 | L4₹2.9 CrAdmitted-Finance | -3.69% | ₹2.9 Cr | L4 | Admitted-Finance |
Tender Value
₹3.0 Cr
EMD Value
₹2 L
Closing Date
29 Apr 2026, 1:00 pmClosed
GM FS
BHEL EDN MYSORE ROAD BANGALORE-26
Construction of Boundary Wall and Associated Works in BHEL EDN Township Premises.
2026_BHEL_60041_1
BHE/FS-TM/315/25-26/2834/23
Open Tender
Civil Works
180 days
Bangalore
as per NIT
2 documents required · 2 mandatory
₹0
₹2 L
10 Jun 2026
8 Apr 2026
29 Apr 2026
8 Apr 2026
29 Apr 2026
8 Apr 2026
8 Apr 2026 - 28 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Statutory Approvals from Local Authorities Approval from BBMP to get plan approval and permission for cutting/ transplantation of trees BWSSB for Municipal Storm Water Drain dismantling, realignment and reconstruction | |||||
| 2 | Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | - | Sqm | 8.95 | - |
| 3Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50m outside the periphery of the area cleared. | |||||
| 4Felling trees of the girth (measured at a height of 1m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 120 cm girth up to and including 240 cm girth. | |||||
| 5 | Dismantling barbed wire or flexible wire rope or mesh in fencing including making rolls and stacking within 50 metres lead. | - | Kg | 36.8 | - |
| 6.1 | Dismantling and stacking within 50 metres lead, fencing posts or struts including all earth work and dismantling of concrete etc. in base of :
Steel T’ or ‘L’ iron or pipe | - | Each | - | - |
| 6.2 | Dismantling and stacking within 50 metres lead, fencing posts or struts including all earth work and dismantling of concrete etc. in base of : R.C.C. | - | Each | - | - |
| 7 | Demolishing cement concrete including disposal of material within 50 metres lead in (1:3:6) or richer mix. | - | Cum | 2,434.25 | - |
| 8 | Demolishing R.C.C. work including stacking of steel bars and disposal of unserviceable material within 50 metres lead at all heights & levels. | - | Cum | 3,551.25 | - |
| 9Demolishing brick work including stacking of serviceable material and disposal of unserviceable material within 50 metres in cement mortar at all height & levels. | |||||
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 8.22 MB
BOQ_64995.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid