| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹79,885Accepted-Finance | L1 | Accepted-Finance QUALIFIED | |
| 2 | L2₹1.1 L+₹31,520 (39.5%)Accepted-Finance | L2 | Accepted-Finance QUALIFIED | |
| 3 | L3₹1.2 L+₹40,495 (50.7%)Accepted-Finance | L3 | Accepted-Finance QUALIFIED | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹1.5 L
EMD Value
₹1,500
Closing Date
30 Jun 2021, 11:00 amClosed
SE EDC III BULANDSHAHR
EDC III BULANDSHAHR
TO MOUNTING NEW TRANSORMER IN PLACE OF OVERLOADED TRANSFORMERS SUB STATION UNDER EDD JAHANGIRABAD.
2021_PVVNL_597090_1
T-18/EDC-III/BSR/2021-2022
Open Tender
Electrical Works
Lump-sum
7 days
BULANDSHAHR
TO MOUNTING NEW TRANSORMER IN PLACE OF OVERLOADED TRANSFORMERS SUB STATION UNDER EDD JAHANGIRABAD.
2 documents required · 2 mandatory
₹1,180
ICICI BANK
₹1,500
5 Jul 2021
19 Jun 2021
30 Jun 2021
19 Jun 2021
30 Jun 2021
19 Jun 2021
Amount
fo|qr forj.k [k.M&tgkaxhjkckn ds vUrxZRk midsUnz ubZe.Mh ls iksf"kr tyhyiqj QhMj ij ifjorZd vfrHkkfjr gksus ds dkj.k nks u;s ifjorZd LFkkfir djus dk dk;ZA
Carriage of fallowings from ESC BSR to pit site on kachcha pacaa road including loading and unloading chagres at both ends, required ccompletion of work, distance about to 0 to 70 Km. approx.
ST Pole 11mtr/PCC Pole 8.5 mtr long.
Carriage of All line Material from store to j.e store Sub-station as ACSR Weasel conductor, ABC conductor GI Wire, Earth Wire, M.S. Channel, Angle, Stay & Earthig Rods, Barbed Wire. Disc Insulator etc.
Erection of Single support including complete H.T./L.T. fittings as per RESPO manual and as per direction of Engineer incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Erection of Double support including complete H.T./L.T. fittings as per RESPO manual and as per direction of Engineer incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Grouting of Single support shall be grouted with cement, sand and birck ballast/stone ballast/stone ballast in ratio 1:4:8 =30x3030 cms. including the cost of Cement, Sand, Brick Ballast/Stone Ballast, etc. as per actual size requirement, as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Grouting of Double pole support shall be grouted with cement, sand and birck ballast/stone ballast/stone ballast in ratio 1:4:8 =30x3030 cms. including the cost of Cement, Sand, Brick Ballast/Stone Ballast, etc. as per actual size requirement, as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work.
fixing of 11 kv Stay rod with Stay wire in proper way with Nozelling.
Grouting of 11 kv Stays Rods.
Laying, sagging. Stringing and binding and jumpering of ACSR Weisal, rabbit, dog newly erected poles as per RESPO manual and as per direction of Supervising Engineer. It includes the cost of labour, T&P, carrier etc. requried for proper completion of work.
ACSR weisal conductor
ABC Cable 3X95 mm.
Carriage of 100 Kva transformar.
Installation of 100 Kva transformer.
Fixing of Earthing rod.
Fixing of Danger board,
The following material is required tobe supplied by the contractor.
Holding clamp.
Double pole Clamp.
LT Clamp
Bolt & nut off size.
F clamp
Stay clamp
Stay Insulator for 11 Kv.
Above work shall be done as per UPPCL/RESPO Rules.
TUSHAR CONSTRCTION
M/S Mahadev Power And Construction Co.
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .