Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹1.1 Craccepted-aoc | ₹1.1 Cr | accepted-aoc |
Tender Value
₹1.0 Cr
EMD Value
₹2 L
Closing Date
13 May 2026, 9:30 pmClosed
Minor Irrigation Department
ALWYN AGERA
Improvement work of Ganganadu Onakodlu Sri Mahalingeshwara temple tank in Byndoor village of Byndoor constituency in Udupi district.
MI/2026-27/MT/WORK_INDENT11687
MI/2026-27/MT/WORK_INDENT11687
Open
Modernization of tanks
Two Tender Document System(Two Cover)
Minor Irrigation Division Mangalore
7 documents required · 7 mandatory
Contractor Registration Certificate
3.2 (c) Executed in any one financial year the minimum quantities of work, De-silting/Earthwork in both excavation and embankment (combined quantities): 1,404.00 Cum, Cement concrete (including RCC and PCC): 352.00 Cum, Steel works for RCC: 6.40 MT, Coursed/uncoursed rubble stone masonry: 586.00 Cum
3.2 (b)Satisfactory completion (at least 90% of the contract value) as a prime contractor at least one similar work such as Construction/Improvement works of tank of value not less than Rs. 50.39 Lakhs
3.2 (a)To qualify for award of this contract each tenderer in his name should have in the last five years period. (a) achieved in at least 2 financial years a minimum financial turn over ( in all classes of civil engineering construction works only) of Rupees. 201.55 lakhs (usually not less than two time the estimated annual payments under this contract)
3.3(b)liquid assets and /or availability of credit facilities of not less than Rs.34.73Lakhs (Credit lines/ letter of credit/ certificates from banks for meeting the fund requirement etc. for works costing Above Rs.100.00 lakhs).
Details of works already Tendered for
Details of Ongoing Works
Availability of Project Engineer And Organization Chart
Affidavit
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
₹2,520
₹2 L
13 May 2026
4 May 2026
14 May 2026
12 May 2026
8 May 2026
Programme of work
Name of work: Improvement work of Ganganadu Onakodlu Sri Mahalingeshwara temple tank in Byndoor village of Byndoor constituency in Udupi district.
MI/2026-27/MT/WORK_INDENT11687
SNo Item Name Unit Estimate Quantity Rate Amount 1st Month 2nd Month 3rd Month 4th Month 5th Month 6th Month 7th Month 8th Month 9th Month 10th Month 11th Month Total Amount
Qty Amount Qty Amount Qty Amount Qty Amount Qty Amount Qty Amount Qty Amount Qty Amount Qty Amount Qty Amount Qty Amount
1 De-silting in Tank bed/Feeder Channel/Canal in dry condition by excavating the deposited bed material and loading the same to transport vehicle ( excluding cost of transportation ) including cost of all machinery, labour & all necessary works as directed and complete as per specification with all lead and lifts, loading and unloading charges as per the direction of Engineer in charge. Cum 340.830 60.48 20,613.40 200.00 12096.00 140.83 8517.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20613.40
2 Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m (under watery situation) complete with all lead and lifts, loading and unloading charges as per the direction of Engineer in charge. Cum 608.240 118.88 72,307.57 400.00 47552.00 208.24 24755.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 72307.57
3 Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m complete with all lead and lifts, loading and unloading charges as per the direction of Engineer in charge. Cum 449.070 114.24 51,301.76 300.00 34272.00 149.07 17029.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 51301.76
4 Providing rubble stone/boulder filling between or behind abutment below apron including cost of all materials, labour, hand packing, finishing top surface & all necessary works as directed and complete as per specification with all lead and lifts, loading and unloading charges as per the direction of Engineer in charge. Cum 141.720 1431.36 202,852.34 50.00 71568.00 50.00 71568.00 41.72 59716.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 202852.34
5 Providing and laying in-situ vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for plain concrete works including cost of all materials, machinery, labour, cleaning, providing mortar layer for lift joints, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete with all lead and lifts, loading and unloading charges as per the direction of Engineer in charge. Cum 70.350 6707.68 471,885.29 40.00 268307.20 30.35 203578.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 471885.29
6 Providing and constructing coursed rubble face stone masonry using approved stones in cement mortar 1 : 4 proportion by volume including cost of all materials, machinery, labour, ramps, cleaning, packing mortar and wedging stone chips into joints, curing and all other ancillary operations complete with all lead and lifts, loading and unloading charges as per the direction of Engineer in charge. Cum 627.070 5937.12 3,722,989.84 0.00 70.00 415598.40 72.00 427472.64 72.00 427472.64 69.00 409661.28 69.00 409661.28 69.00 409661.28 69.00 409661.28 70.00 415598.40 67.07 398202.64 0.00 3722989.84
7 Providing and constructing un-coursed rubble stone masonry for sub-structure with approved stones in CM 1 : 4 proportion by volume portions of return walls/ abutments/ similar structure including cost of all materials, labour, cleaning, batching and mixing mortar, packing mortar and wedging stone chips into joints, finishing, curing and all other ancillary operations complete with all lead and lifts, loading and unloading charges as per the direction of Engineer in charge. Cum 104.410 4779.04 498,979.57 0.00 0.00 0.00 0.00 17.00 81243.68 17.00 81243.68 17.00 81243.68 18.00 86022.72 18.00 86022.72 17.41 83203.09 0.00 498979.57
8 Providing and constructing 75 mm dia PVC pipe weep holes for concrete / masonry walls including providing 200 x 200 x 200 mm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 100 mm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour & all necessary works as directed and complete as per specification with all lead and lifts, loading and unloading charges as per the direction of Engineer in charge. m 523.890 377.44 197,737.04 0.00 0.00 150.00 56616.00 0.00 150.00 56616.00 0.00 150.00 56616.00 0.00 73.89 27889.04 0.00 0.00 197737.04
9 Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, complete with all lead and lifts, loading and unloading charges as per the direction of Engineer in charge. Cum 356.400 297.92 106,178.69 0.00 0.00 0.00 0.00 0.00 0.00 150.00 44688.00 0.00 0.00 0.00 206.40 61490.69 106178.69
10 Providing and laying Polished Sadarahalli Grey Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 20 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing , curing and polishing etc. all complete with all lead and lifts, loading and unloading charges as per the direction of Engineer in charge. sqm 286.440 2335.20 668,894.69 0.00 0.00 0.00 0.00 0.00 0.00 60.00 140112.00 60.00 140112.00 60.00 140112.00 60.00 140112.00 46.44 108446.69 668894.69
11 Providing and laying reinforced cement concrete pipe NP3 of 750 mm dia for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets, complete with all lead and lifts, loading and unloading charges as per the direction of Engineer in charge. m 20.000 3735.20 74,704.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20.00 74704.00 0.00 0.00 74704.00
12 Providing and laying 60mm thick factory made precast M -30 grade Cement Concrete Paver Block as per IRC SP 63:2018 & IS 15658 for Cycle Tracks & Pedestrian Footpaths of approved shape and colour, laid in required pattern and including over 30mm thick compacted bed of coarse sand, filling the joints with fine sand etc. complete with all lead and lifts, loading and unloading charges as per the direction of Engineer in charge. sqm 424.800 1196.16 508,128.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 120.00 143539.20 120.00 143539.20 184.80 221050.37 508128.77
13 Providing and laying in-situ vibrated M-20 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for RCC works of gallery, sluice, spillway crest, spillway d / s face, energy dissipating structures, training walls, piers, abutments and such other locations including cost of all materials, machinery, labour, cleaning, batching, mixing, placing in position, levelling,vibrating, finishing, curing with all other ancillary operations complete with all lead and lifts, loading and unloading charges as per the direction of Engineer in charge. Cum 46.200 6889.12 318,277.34 0.00 0.00 15.00 103336.80 12.00 82669.44 10.00 68891.20 9.20 63379.90 0.00 0.00 0.00 0.00 0.00 318277.34
14 Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification- All other type of structures. Complete with all lead and lifts, loading and unloading charges as per the direction of Engineer in charge. tonne 8.000 78118.88 624,951.04 0.00 0.00 1.35 105460.49 1.35 105460.49 1.35 105460.49 1.35 105460.49 1.35 105460.49 1.25 97648.60 0.00 0.00 0.00 624951.04
15 Providing and laying in Cement Concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications-For M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates, complete with all lead and lifts, loading and unloading charges as per the direction of Engineer in charge. Cum 323.300 7849.07 2,537,604.33 0.00 0.00 56.00 439547.92 56.00 439547.92 53.00 416000.71 53.00 416000.71 53.00 416000.71 52.30 410506.36 0.00 0.00 0.00 2537604.33
De-silting/EW/embankment 1754.54 1,404.00 Cum
Cement concrete 439.85 352.00 Cum
Steel 8.00 6.40 MT
Coursed/uncoursed rubble stone masonry 731.48 586.00 Cum
milestone 1 3,422.00 3,400.00 3,268,769.91 WD 5,038,702.84 50.39 Executive Engineer,
milestone 2 8,033.00 8,000.00 3,467,401.58 EMD 151,161.09 200,000.00 M.I. & GWD Division, Mangaluru
Financial Turnover
Criteria Financial Year Value in Rs
Total value of civil engineering construction works executed and payments received in the last five years (in Rs. Lakhs) (Attach Certificate from Chartered Accountant and corresponding Balance sheet) 2021-22
Work performed as Prime Contractor (in the same name) on works of similar nature
Project Name Name of Employer Description of Work Contract Number Value of contract Rs. Lakhs Date of issue of work order Specified period of completion Actual date of completion Remarks explaining reasons for delay in completion of work
Quantities of work executed as prime contractor (in the same name)
Year Name of Work Name of Employer Quantity of work performed Remarks (Indicate contract reference)
Earthwork in both excavation and embankment (combined quantities) in Cum Cement concrete (including RCC and PCC) in Cum Steel works for RCC in MT Coursed/uncoursed rubble stone masonry in Cum
Existing commitments and on-going works
Description of work Place and State Contract No and Date Name & Address of Employer Value of Contract (Rs. lakhs) Stipulated period of completion Value of works remaining to be completed (Rs. lakhs) Anticipated date of completion
Attach certificates from Employer
Works for which Tenders already submitted
Description of work Place and State Name & Address of Employer Estimated Value of works (Rs. lakhs) Stipulated period of completion Date when decision is expected Remarks if any
Information on litigations in which the Tenderer is involved
Other Party (ies) Employer Details of dispute Amount involved Remarks showing present status
Format for 3.2 (b)
SI.No Name of Work Estimated cost Tendered cost Cost of work executed Cost of work to be executed Date of agreement Stipulated period of completion Scheduled date of completion
Divisional Officer
Note:- The statement showing the value of existing commitments and On - Going works as well as the stipulated period of completion remaining for each of the works listed should be countersigned by the employer in charge, not below the rank of an Executive Engineer or equivalent.
3 3 3rd month 4th month 5th month 6th month 7th month 8th month 9th month 10th month 11th month Total Amount
WORK DONE CERTIFICATE
Name of the Department
Name of Division
1 Name of work :
2 Estimated Cost :
3 Agreement No. :
4 Name of Contractor :
5 Tendered cost :
6 Date of work order :
7 Stipulated period of completion :
8 Intended date of Complition :
9 Final Date of completion, (For completed work) :
10 Revised amount of work (including claims/extra/arbitration amount,if any) :
11 Cost of work executed :
12 Balance cost of work :
13 Whether final bill is paid :
14 Reasons for non completion of work in schedule period of completion :
15 Whether any penalties fine/stop notice/compensation/liquidated damage imposed/Imposed & canceled :
a) Earth Excavation :
b) Embankment :
c) Providing & laying M-15 :
d) Providing & laying M-10 :
f) Rubber & Earth Filling :
g) Providing & laying M-20
16 Remarks of the Engineer performance of the Contractor working style quality consciousness tendency of claims :
Divisional Officer
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
11687_kw-4_bid_document.doc
Tender Document • 2.05 MB
11687_programme_of_work.xlsx
Others - Programme of work • 0.21 MB
Labour GO.docx
Others - Labour GO • 0.98 MB
11687_formats_1to_6.xlsx
Others - Format 1 to 6 • 0.02 MB
LOC format.pdf
Others - LOC format • 0.35 MB
Format for 3 2b.xls
Others - Format for 3 2b • 0.01 MB
11687_bar_chart.xls
Others - Bar Chart • 0.04 MB
General specifications.pdf
Instructions to Tenderers • 0.57 MB
Insurance surety Bond format.pdf
Others - Insurance surety Bond format • 0.43 MB
Royalty GO.pdf
Others - Royalty GO • 0.06 MB
E Payment.doc
Others - E Payment • 0.22 MB
Work done format.xls
Others - Work done format • 0.05 MB
Star rate GO.pdf
Others - Star rate GO • 2.13 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .