Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.5 LAccepted-AOC | L1 | Accepted-AOC RECOMMENDED BY TC | |
| 2 | L2₹4.8 L+₹30,744.90 (6.89%)Rejected-Finance | L2 | Rejected-Finance NOT L1 | |
| 3 | L3₹5.1 L+₹66,552 (14.9%)Rejected-Finance DUDHICHUA FOREST NURSARY KHADIA P O SHAKTINAGAR DISTT SONEBHADRA U P 231222 | KHADIA | SONEBHADRA | UTTAR PRADESH | 231222 | L3 | Rejected-Finance NOT L1 |
Tender Value
Refer Docs
EMD Value
₹9,600
Closing Date
22 Aug 2022, 11:00 amClosed
GM (Excavation) , Dudhichua Project
Office of the GM (Excavation) , Dudhichua Project PO Khadia ,Distt Sonebhadra, UP- 231 222
Offloading work to outside agency towards Collection of store materials fresh oil and Deposition of old scrap Materials Burnt oil to and from RS DCH and Dragline Section of Dudhichua Project
2022_NCL_252789_1
DCH/GM (Excv)/Tender /Dragline/2022-23/31
Open Tender
Excavation Department Work
Item Rate
365 days
NCL, DUDHICHUA PROJECT
Please refer Tender Documents
4 documents required · 4 mandatory
₹9,600
30 Jan 2023
10 Aug 2022
23 Aug 2022
10 Aug 2022
22 Aug 2022
11 Aug 2022
10 Aug 2022 - 18 Aug 2022
Amount
SCOPE OF WORK for complete work 1. Collection of burnt oil from various draglines under periodical maintenance or break-down and filling the oil in drums & return to RS/DCH and issue of fresh lubricants. 2. Deposition of old spares, like – scrap/ failed sub-assemblies, empty gas cylinders, etc. from Dragline work-shop to RS/DCH. 3. Collection of new spares, like – sub-assemblies, new gas cylinders, electrodes, etc. from RS/DCH to Dragline work-shop. 4. Stacking of machine components / items, handling of items of machines at Dragline Section. • Firm has to do various activities of the job (listed as above) on daily basis (excluding Sundays and paid holidays). • Work has to be carried out in 1 shift per day only. • The contractor has to provide minimum 04 nos. unskilled labours per day. • Crane, sling ropes, etc. for carrying out the above jobs shall be provided by NCL. • All the safety gadgets to be provided by the contactor on its own to the manpower engaged in work. • Firm must submit price break-up of its quoted price whenever asked. • LABOUR PAYMENT THROUGH “CLIP” PORTAL IS TO BE ENSURED BY THE BIDDER.
Total cost including labour charge, contractor profit, CMPF (Excluding GST) for Complete Work as per SCOPE OF WORK AND NIT
Total impact of GST for the purpose of CTC
S ENGINEERING SERVICES
M/s Ram Das
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_261286.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .