| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.0 LAccepted-AOC | L1 | Accepted-AOC AOC | |
| 2 | L2₹28.4 L+₹54,810.25 (1.97%)Rejected-AOC | L2 | Rejected-AOC REJECTED | |
| 3 | L3₹29.6 L+₹1.7 L (6.22%)Rejected-AOC C 223 MIANWALI COLONY GURUGRAM 122 001 HARYANA | GURUGRAM | GURUGRAM | HARYANA | 122001 | L3 | Rejected-AOC REJECTED | |
| 4 | L4₹30.7 L+₹2.8 L (10.0%)Rejected-AOC | L4 | Rejected-AOC REJECTED | |
| 5 | L5₹31.2 L+₹3.3 L (11.8%)Rejected-AOC | L5 | Rejected-AOC REJECTED |
| Sl No | Description | Qty | Unit | H.B. Traders L2 | Parveen Builders L5 | M/S mk enterprises L3 | R K Enterprises L1 | PAWAN KUMAR L10 | D P ENTERPRISES L6 | M/S Rohit Enterprises L8 | NEHRA ENTERPRISES L4 | M/S Parshant Associates L7 | PRAGATI BUILDERS L9 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Schedule-A | |||||||||||||
| 1.01 | Demolition of Cement Concrete (unreinforced) of any description and in any position not otherwise specifically provided for complete all as specified and as directed by Engr-in-Charge. | 52 | Cum | 100 ₹5,200 | 300 ₹15,600 | 200 ₹10,400 | 99 ₹5,148 Lowest | 250 ₹13,000 | 200 ₹10,400 | 100 ₹5,200 | 200 ₹10,400 | 350 ₹18,200 | 555 ₹28,860 |
| 2.00 | M&L for gunniting to RCC works in column beams, slabs, chajja, facia, landing, balconies etc by removing/ dismantling of RCC (loose concrete) and cutting of steel bar including plaster cleaning of surfaces with wire brushes and applying epoxy, paint anti corrosive coating of minimum 40-50 microns thick with sikatop Armatec 108 or Colusal VL of MC Bauchemie to rusted steel reinforcement after removing cleaning all rust and supply and fixing welded steel wire mesh 75mm x75mm with 4mm dia steel wire as facies/drops and similar works etc and expoxy based or other equivalent suitable bonding against treatment to be carried out on old concrete surface with Sikadur 32 of Sikka. Nito bond EP of fosroc or equivalent (as per manufacturers instruction) to bond old and new concrete mixing @ 2% by weight of cement polycrete and providing gunniting with a minimum pressure of 2 to 2.5 Kg sqcm and applying 35mm thick gunniting in cement mortar (1:2) (one part of cement and two part of ghaghar sand) using ordinary port land cement of 43 grade over wherever required, complete all as specified and directed by Engineer-in-Charge.
Note:-(i)After placing the additional reinforcement all concrete surface shall be thoroughly scrubbing with. (ii)Additional reinforced TMT bars where incorporated in work and including 20mm thick cement plaster in 1:4
(iii) Work to be carried out as in patches as directed by Engr-in-charge.
(iv) Rate for steel scaffolding as directed to be included in quoted rate.
(v) All demolished material removed from MOD land completely. | 30 | Sqm | 2,500 ₹75,000 | 1,500 ₹45,000 | 1,000 ₹30,000 | 777 ₹23,310 Lowest | 3,000 ₹90,000 | 2,000 ₹60,000 | 1,300 ₹39,000 | 900 ₹27,000 | 1,200 ₹36,000 | 1,355 ₹40,650 |
| 3.00 | Demolition of RCC of any descrition and in any position not other wise specially provided for complete all as specified and directed by Engineer in Charge (reinforcement cut as required to facilitate demolition) | 3.25 | Cum | 1,000 ₹3,250 | 400 ₹1,300 | 250 ₹812.5 | 111 ₹360.75 Lowest | 350 ₹1,137.5 | 200 ₹650 | 500 ₹1,625 | 200 ₹650 | 500 ₹1,625 | 450 ₹1,462.5 |
| 4.00 | M&L for RCC 1:2:4 type B-1 using (20mm graded stone agg)for chajjas complete all as specified and directed | 3.5 | Cum | 6,500 ₹22,750 | 6,500 ₹22,750 | 5,500 ₹19,250 | 3,888 ₹13,608 Lowest | 5,500 ₹19,250 | 9,000 ₹31,500 | 8,000 ₹28,000 | 5,000 ₹17,500 | 6,500 ₹22,750 | 8,800 ₹30,800 |
| 5.00 | M&L for mild steel TMT bars 10mm dia and over cut to length, bent to shape required including cranking, bending, spirally for hooping for columns, hooking ends and binding with and including mild steel wire (annealed) not less than 0.9 mm dia or securing with clips | 180 | Kg | 100 ₹18,000 | 100 ₹18,000 | 90 ₹16,200 Lowest | 95 ₹17,100 | 100 ₹18,000 | 100 ₹18,000 | 100 ₹18,000 | 90 ₹16,200 Lowest | 120 ₹21,600 | 90 ₹16,200 Lowest |
| 6.00 | M&L TMT steel bars 6mm to 8mm dia and over cut to length bent shape required, including cranking bending binding with mild steel wire (annealed) not less than 0.9mm dia quality conforming to relevant IS complete all as specified. | 95 | Kg | 100 ₹9,500 | 100 ₹9,500 | 90 ₹8,550 Lowest | 95 ₹9,025 | 100 ₹9,500 | 100 ₹9,500 | 100 ₹9,500 | 90 ₹8,550 Lowest | 130 ₹12,350 | 90 ₹8,550 Lowest |
| 7.00 | Dismantling of brick work built in cement mortar including all quions, arches, pillars, etc. completed all as specified and as directed | 65 | Cum | 100 ₹6,500 Lowest | 300 ₹19,500 | 150 ₹9,750 | 111 ₹7,215 | 200 ₹13,000 | 100 ₹6,500 Lowest | 400 ₹26,000 | 200 ₹13,000 | 200 ₹13,000 | 444 ₹28,860 |
| 8.00 | M&L for Brick work with sub class B bricks straight or curved on plan exc 6 mtr mean radius built in CM 1:6 completed all as specified and as directed | 50 | Cum | 4,500 ₹2,25,000 | 5,000 ₹2,50,000 | 5,000 ₹2,50,000 | 4,444 ₹2,22,200 Lowest | 6,500 ₹3,25,000 | 6,500 ₹3,25,000 | 5,500 ₹2,75,000 | 4,800 ₹2,40,000 | 6,000 ₹3,00,000 | 5,555 ₹2,77,750 |
| 9.00 | All as item No 8 here in before but using old serviceable bricks retrieved from dismantling. | 15 | Cum | 2,000 ₹30,000 | 2,500 ₹37,500 | 3,000 ₹45,000 | 1,222 ₹18,330 Lowest | 5,000 ₹75,000 | 3,000 ₹45,000 | 2,500 ₹37,500 | 3,000 ₹45,000 | 2,200 ₹33,000 | 2,900 ₹43,500 |
Tender Value
₹40 L
EMD Value
₹80,000
Closing Date
23 Jun 2026, 6:00 pmClosed
GE (AF) Gurgaon No 1
GE (AF) Gurgaon No 1 Near Atul Kataria Chowk Gurgaon
CA NO. GE AF NO.1/GUR-27/2026-27 REPAIR AND MAINT TO EXTERIOR CLADDING/ BUILDING FACADE INCLUDING NECESSARY STRUCTURAL MEMBER WITH PLASTERING AND PAINTING TO DANGER BUILDING WITH ANNEX BUILDINGS AT X AREA 54 ASP UNDER GE(AF) GURGAON NO 1
2026_MES_769124_1
GE(AF) No 1/GUR-27/2026-27
Open Tender
Miscellaneous Works
Item Rate
180 days
GE (AF) Gurgaon No 1
All as per NIT
10 documents required · 10 mandatory
₹500
GE (AF) Gurgaon No 1
₹80,000
Yes
17 Aug 2026
2 Jun 2026
25 Jun 2026
2 Jun 2026
23 Jun 2026
16 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Schedule-A | |||||
| 1.01 | Demolition of Cement Concrete (unreinforced) of any description and in any position not otherwise specifically provided for complete all as specified and as directed by Engr-in-Charge. | 52 | Cum | - | - |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
TenderDocument27.pdf
Tender Documents • 1.47 MB
BOQ_861328.xls
BOQ • 0.88 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .