Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance BAMNA HATHRAS | HATHRAS | HATHRAS | UTTAR PRADESH | Admitted-Finance |
| 2 | Admitted-Finance NAGLA SADAK HATHRAS | HATHRAS | HATHRAS | UTTAR PRADESH | Admitted-Finance |
| 3 | Admitted-Finance NAJARPUR SASNI HATHRAS UTTAR PRADESH 204101 | HATHRAS | HATHRAS | UTTAR PRADESH | 204101 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹12,000
Closing Date
22 Sept 2023, 12:00 pmClosed
Se
Edc hathras
Semi Turnkey
2023_DVVNL_838120_1
EDCH-72/2023-24
Open Tender
Electrical Works
Item Rate
180 days
Hathras
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
DVVNL WEBSITE
₹12,000
10 Oct 2023
14 Sept 2023
22 Sept 2023
14 Sept 2023
22 Sept 2023
14 Sept 2023
Amount
Supply of Following Matarial as per relevent ISS
33 kv Bus Isolator
33 kv Post Isolator
5 MVA Transformer Bus Complete
33 Kv Lightening arrestor
90 lbs rail Pieces (44.64 kh/m)
Scope of work
Safe Carriage of following material from Electricty store center Hts to Pit site of work through the Kacha and Pakka road including loading and unloading at the respective ends including the cost of arrangement of labour, T&P, etc. which required for proper completion of work.(Distance 00-50 Kms.)
33 KV VCB With Single T/F Pannel
33 KV VCB With Double T/F Pannel
Control Pannel Incoming for 33 kv single T/F
Incoming VCB 600/300/5 AMP 350 MVA
Outgoing VCB 200/100/5 AMP 350 MVA
11 kv XLPE Cable (3*300+3*120sqmm)
Safe Carriage of following from Electricty Store center Hathras to Pit Site of Work through the Kacha and Pakka road loading and unloading at the respective ends including the cost of arrangement of labour, T&P, etc. which required for proper completion of work.(Distance 00-70 Kms.)
16 KVA T/F
25/63/100 KVA T/F
Fixing/ Errection of Bus Coupler as per respoo manual all cost of labor, material and T&P which required for completion of work
Fixing/ Errection of VCB Pannel with Grouting as per respoo manual all cost of labor, material and T&P which required for completion of work
Safe Dismenteling of old and used following T/F from Double Pole with opening of all HT/LT Jumpers, all works which required for dismentling of T/F and carriage it up to Store Hathras/ J.E Store all cost of labour and T&P which required for completion of work
10/16 KVA T/F
25/63/100 KVA T/F
Installation of following T/F on newly constructed double pole in proper alignment direction & making HT/LT connection.
16 KVA T/F
25/63/100 KVA T/F
Safe Dismenteling of old 5 MVA T/F from Foundation with opening of all HT Jumpers, opening of radiators, draining of oil all works which required for dismentling of power T/F and carriage it from switch yard to out side boundary all cost of labour and T&P which required for completion of work
Making of all HT Jumpers of new 10 MVA T/F after completion of work all cost of labour and T&P
Structure for 33 KV Bus Isolator
Structure for 33 KV Post Isolator
Structure for 5 MVA T/F Bus Complete
Structure for 33 Kv Lightening arrestor
Fixing of 90 lbs rail pieces
Construction of Plinth and foundation Suitable for 5 MVA T/F above ground level one ft below the ground level of 9" After Exavation of 4 "earth brick ballast shall be provided and remaining will be done properly After ballast shall be provided a retaining wall 9"width by fist class brick in ratio 1:4 of cement & sand shall be made . The earth shall be filled up to one ft.below the top of the plinth After this brick ballast shall be provided upto 6"from the earth level and proper rammering shall be done one No. jall of 12 mm MS tor shall be fixed in the hollow of plinth and one ft. thick RCC in ratio of cement sand & stone ballast shall be laid on the top of the plinth. The 12 mm thick plastering shall be done all round the plinth in 1:4 ratio of cement and sand.
Making all H/T/ jumpers of installed New/Repaired 5 MVA T/f after Completion of Work
Earthing of 5 MVA power T/F (Body & Neutral)
Fixing of 33 KV VCB with Double T/F Control Pannel and CT 200/100/1A with Structure
Construction of plinth and foundation of VCB Pannel
Fixing and Installation of incoming and outgoing VCB pannel
Laying of 190 mtr XLPE Cable with making of cable box mounted with switch gare and T/F (Kit)
Fixing of cable jointing kit 120 sqmm
Laying of 4*2.5 sqmm and 2*2.5 sqmm control cable app 200 mtr
Earthing of Indoor equipments
Painting of indoor equipments with all cost of labour and material paint which required for completion of work
R.N. ELECTRICAL WORKS
Bobby Electricals
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .