| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 LAdmitted-Finance 520C MAIN ROAD WARD NO 12 METTU STREET ELAMBALUR PERAMBALUR | PERAMBALUR | PERAMBALUR | TAMIL NADU | 621220 | L1 | Admitted-Finance | |
| 2 | L2₹1.6 L+₹35,619.64 (29.1%)Admitted-Finance | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | KDM BUILDERS AND CONTRACTORS L1 | M VEERAKUMAR L2 |
|---|---|---|---|---|---|
| 1.0011KV OH Line | |||||
| 2.00 | Excavation of Pole pits including cleaning of site ,etc complete in Ordinary soil for 7.5Mtr / 8.0 Mtr Poles(1.25 X 0.6 X 1.5M) | 1 | Each | 540 ₹540 | 450 ₹450 Lowest |
| 3.00 | Excavation of Pole pits including cleaning of site ,etc complete in Ordinary soil for 9.14 Mtr Poles / 9.0 Mtr PSC Poles | 1 | Each | 650 ₹650 | 500 ₹500 Lowest |
| 4.00 | Excavation of Pole pits including cleaning of site ,etc complete in Ordinary soil for 9Mtr square poles/above 9.14 Mtr pole All Metal poles | 1 | Each | 650 ₹650 | 500 ₹500 Lowest |
| 5.00 | Excavation of Stay Pits including cleaning of site ,etc complete (0.95 X 0.6 X 1.2M) | 1 | Each | 441 ₹441 | 400 ₹400 Lowest |
| 6.00 | Transporting of pole for 7.5m/8m RCC, PSC pole from road side to work spot through paddy,fields, kodica lands,wetlands,etc by head load/ bullock cart including loading, and unloading charges upto a distance of 500M | 1 | Each | 441 ₹441 | 400 ₹400 Lowest |
| 7.00 | Transporting of pole for RSJ pole from road side to work spot through paddy,fields, kodica lands,wetlands,etc by headload/ bullock cart including loading, and unloading charges upto a distance of 500M | 1 | Each | 540 ₹540 | 536 ₹536 Lowest |
| 8.00 | Transporting of pole for 9mPSC pole 300kg / 400 kg from road side to work spot through paddy,fields, kodica lands,wetlands,etc by headload/ bullock cart including loading, and unloading charges upto a distance of 500M | 1 | Each | 540 ₹540 | 536 ₹536 Lowest |
| 9.00 | Transporting of pole for 9Mtr RCC square pole from road side to work spot through paddy,fields, kodica lands,wetlands,etc by headload/ bullock cart including loading, and unloading charges upto a distance of 500M | 1 | Each | 720 ₹720 | 600 ₹600 Lowest |
| 10.00 | Transporting of pole for 7.5m/8m RCC,PSC pole from road side to work spot through paddy,fields, kodica lands,wetlands,etc by headload/ bullock cart including loading, and unloading charges upto (EXTRA FOR EVERY ADDITIONAL 100M LEAD) | 1 | Per 100mtr | 90 ₹90 Lowest | 96 ₹96 |
Tender Value
₹15 L
EMD Value
₹15,000
Closing Date
23 Sept 2025, 2:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE/MEDC/TNPDCL/MADURAI
OFFICE OF SE/MEDC/TNPDCL/K.PUDUR/MADURAI-7
Running Contract for carrying out the O and M works, Improvement works and Capital works, Maintenance works and DCW works in respect of Assistant Executive Engineer/Distribution/North Melur Sub Division in East Division of MEDC/Madurai
2025_EB_602554_1
ET/MEDC/032/25-26, DT. 09.09.2025
Open Tender
Electrical Works
Works
180 days
AEE/D/North Melur sub division
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹15,000
Yes
3 Oct 2025
10 Sept 2025
24 Sept 2025
10 Sept 2025
23 Sept 2025
10 Sept 2025
Amount
11KV OH Line
Excavation of Pole pits including cleaning of site ,etc complete in Ordinary soil for 7.5Mtr / 8.0 Mtr Poles(1.25 X 0.6 X 1.5M)
Excavation of Pole pits including cleaning of site ,etc complete in Ordinary soil for 9.14 Mtr Poles / 9.0 Mtr PSC Poles
Excavation of Pole pits including cleaning of site ,etc complete in Ordinary soil for 9Mtr square poles/above 9.14 Mtr pole All Metal poles
Excavation of Stay Pits including cleaning of site ,etc complete (0.95 X 0.6 X 1.2M)
Transporting of pole for 7.5m/8m RCC, PSC pole from road side to work spot through paddy,fields, kodica lands,wetlands,etc by head load/ bullock cart including loading, and unloading charges upto a distance of 500M
Transporting of pole for RSJ pole from road side to work spot through paddy,fields, kodica lands,wetlands,etc by headload/ bullock cart including loading, and unloading charges upto a distance of 500M
Transporting of pole for 9mPSC pole 300kg / 400 kg from road side to work spot through paddy,fields, kodica lands,wetlands,etc by headload/ bullock cart including loading, and unloading charges upto a distance of 500M
Transporting of pole for 9Mtr RCC square pole from road side to work spot through paddy,fields, kodica lands,wetlands,etc by headload/ bullock cart including loading, and unloading charges upto a distance of 500M
Transporting of pole for 7.5m/8m RCC,PSC pole from road side to work spot through paddy,fields, kodica lands,wetlands,etc by headload/ bullock cart including loading, and unloading charges upto (EXTRA FOR EVERY ADDITIONAL 100M LEAD)
Transporting of pole for 9.m PSC pole/9.14m RCC pole from road side to work spot through paddy,fields, kodica lands,wetlands,etc by headload/ bullock cart including loading, and unloading charges upto (EXTRA FOR EVERY ADDITIONAL 100M LEAD)
Transporting of pole for 9Mtr RCC square pole from road side to work spot through paddy,fields, kodica lands,wetlands,etc by headload/ bullock cart including loading, and unloading charges upto (EXTRA FOR EVERY ADDITIONAL 100M LEAD)
Erection of pole for HT/LT lines including scrub jungle and tree clearance, etc, complete (7.5m/8m)
Erection of RCC/PSC pole for HT/LT lines including scrub jungle and tree clearance, etc, complete (9.14/ 9.00m )
Erection of RSJ/ 9m Square pole for HT/LT lines including scrub jungle and tree clearance, etc, complete
Erection of stay set complete including refilling of excavated earth fixing clamp stay rod, guy, binding etc., complete.
Earthing / coil earthing of pole including cutting, hooking and binding etc., complete
Paving of conductor, stringing, binding and jumpering etc., complete ACSR 7/102 sqmm / AAAC 7/2.0,2.5sqmm
Paving of conductor, stringing, binding and jumpering etc., complete ACSR 7/132sqmm/ AAAC 7/3.15sqmm
Paving, stringing, sagging, binding and jumpering of conductor of size ACSR 7/4.09mm
Paving, stringing, sagging, binding and jumpering of conductor Leopard,Dog etc.,
Resagging of HT/LT line of ACSR 7/102 sqmm / AAAC 7/2.0,2.5sqmm
Resagging of HT/LT line of ACSR 7/132sqmm/ AAAC 7/3.15sqmm
Resagging of HT/LT line of ACSR 7/4.09mm
Resagging of HT/LT line of ACSR 7/102 sqmm / AAAC 7/2.0,2.5sqmm Leopard,Dog etc.,
Erection of single phase cross arm/with pin insulator/LT shackles, etc.,complete
Erection of T.I fittings with pin insulator/LT shackles, etc., complete
Erection of 3 phase cross arm without T.I Fittings with pin insulator/LT shackels etc., complete
Erection of V x arm T.I.Fittings with pin insulator, disc, etc., complete in 11 KV lines pin point location
Erection of V x arm T.I.Fittings with pin insulator, disc, etc., complete in 33KV lines pin point location
Erection of V x arm T.I.Fittings with pin insulator, disc, etc., complete in 11 KV lines Cut point location
Erection of V x arm T.I.Fittings with pin insulator, disc, etc., complete in 33KV lines Cut point location
Erection of Tapping channel cross arm
Double pole Transformer structure poles mass concrete (All materials including cement etc.,with Ratio 1:2:4) (0.72m3) (0.6x06x1.65m 0.6x0.6x0.35cum)
Mass concrete for pole on the line (All Materials including cement with Ratio 1:2:4) for 0.32m3) (0.60*0.45*1.20M)
Sleeve concrete for pole on the line (All Materials including cement with Ratio 1:2:4) for (0.202) (0.5x0.45x0.9M)
Sleeve concrete for stay (1:2:4) (all materials included cement)
Erection of double pole structure materials such as top channel, transformer seating channel, belting angle etc, complete
Erection of HG fuse unit (Double pole structure)
Erection of AB switch (Double pole structure)
Transformer structure grounding and earthing of structure complete (Double pole structure)
Transformer LT cable wiring/LT bus bar (Double pole structure)
Erection of LT open type fuse unit including cable jumpering up to the line including cutting welding bending,drilling,fabrication etc (single side)
Erection of LT open type fuse unit including cable jumpering up to the line including cutting welding bending,drilling,fabrication etc (double side)
Erection of HT Jumpering
Erection of HT LAS
Erection of LT LAS
Excavation of earth pit and erection of earth pipe with salt, coal and earth refilling, etc., complete (Cost of coal and salt) double pole structure
Providing earth tub for 3nos earth pit/including Labour
Transporting of structure materials ABS HG fuse, cable, etc., except pole
Painting two coats with approved quality of aluminum paint for transformer structure and iron materials including cost of paint
2 Coat of Snowsem painting with reputed brand for transformer structure two nos. poles and cut stone including cost of paint,brush etc. complete.
Aluminium/Gray Painting of DT ( upto 100KVA) coats-with reputed brand painting Materials supplied by the contractor
Aluminium/Gray Painting of DT (Above 100KVA upto 500KVA) 2coats-with reputed brand painting Materials supplied by the contractor
Details of transformer name board including painting cost of MS sheet writing etc., complete I seating channel
Fabrication,Erection and excavation for centre support etc for 250/ 500 KVA DT including transporting & single pole DT also
Erection of transformer should be always done by board staff only, if done by contractor (W/O Crane upto 100 KVA)
Erection of transformer should be always done by board staff onlly, if done by contractor (W/O Crane abvoe 100 KVA)
Painting 2 coats of aluminum paint for ABS and DP structure iron material but excluding cost of paint
Labour charges for conversion of existing L.T Pin point into cut point in LT 3 Phase line for removing rewinding, restringing, resagging and temporary stay etc., complete as per TNEB standard
Labour charges for conversion of existing H.T Pin point into cut point including restringing, resagging and temporary stay etc., complete as per TNEB standard
Erection of D.P. structural iron materials such as top channel, cross bracing and earthing but excluding pole and ABS complete including welding and fabrication
Labour charges for split neutral guarding including earthing
Labour charges for the cradle guarding, including fixing cross arm, lacing etc., complete., etc.,
Labour charges for fixing up of 1 earthing device
Fabrication/ Alteration of all classes of back clamps
Fabrication/ Alteration of all classes of stay clamp
Fabrication / Alteration of Special type of back clamp/V Clamp
Labour charges for loading 7.5m/8.0 PSC/RCC poles to the vehicle including stacking
Labour charges for Unloading 7.5m/8.0 PSC/RCC poles to the vehicle including stacking
Labour charges for loading 9 m PSC/RSJ 30ft poles to the vehicle
Labour charges for Unloading 9 m PSC/RSJ 30ft poles to the vehicle
Labour charges for loading RSJ poles above 30ft / 9m Square pole to the vehicle
Labour charges for Unloading RSJ poles above 30ft / 9m Square pole to the vehicle
Breaking of concrete in the damaged RCC pole and transporting the grill to the road side
Replacement of stay rod in existing stays
Replacement of guy shackle in existing stays
Clearing of tree branches( cocount trees)
Cutting Branches (other type of tree )
Jungle clearance such as "Seemal Karuvel" etc. including up rooting
Set right the leaned poles with stay
Set right the leaned poles without stay
Providing new earth in lieu of deteriorated earth pipe including earth wire connection
Drilling of holes all size
Cutting of Rs joists, rail poles using gas welding
Cutting of channels
Cutting of angles
Erection of Metering set complete
Dismantling of metering set
Transporting charges of DT /Line materials using Private Vehicle upto 20 Km
Transporting charges of DT /Line materials using Private Vehicle (BEYOND 20 KM FOR EVERY KM)
Erection of Single pole mounted structure material, AB Switch, HG fuse set, seating channel, LAS, HT jumbering, LT open type & jumbering complete
Excavation of earth bit , Erection of earth pipes and structure earthing complete (earth troughs should be supplied by the contractor) for Single pole mounted transformer structure
Construction of plinth for 250 KVA /500 KVA DT in single pole structure system of size 1.2mx1.2m with earth work excavation upto 0.9m depth and PCC filling upto ground level and providing brickwork all round of 0.23m width, with 1:3 cement mortar upto 1.2m height,
Replacement of existing 33 KV conventional Insulator into polymer Insulator including binding etc complete (pin point)
Replacement of existing 11 KV conventional Insulator into polymer Insulator including binding etc complete (pin point)
Disconnection and re connection of 3 phase service connection wire
Disconnection and recollection of 1 phase service connection wire
Labour charge for replacement of existing 33 KV porcelain discs with polymer discs including restringing, resagging etc
Labour charge for replacement of existing 11 KV porcelain discs with polymer discs including restringing, resagging etc
Labour charge for carried out pole to pole inspection in HT/LT lines maintenace including insulator,Disc, shackle healthiness checking and renewal of pin insulator jumpering if required
Labour charge for erection of Side arm stud arrangement including pin insulator, jumpering etc.,
Labour charge for erection of single pole mounted Vertical type AB switch with Excavation of earth pit and erection of earth pipe with salt, coal and earth refilling, etc., complete (Cost of coal and salt)
Labour charge for carried out of maintenance in all type of Distribution Transformers including yard cleaning, tightness of earthing, HT/LT bushing, cleaning of DT, Repalcement of Silica gel, renewal of LT/HT side fuse, renewal of jumpering in DT bushing, LT open type, LT Bus bar complete., etc.,)
Labour charge for carried out maintenance of 11KV/33KV AB switch in HT lines including replacement of Pin insulator & Post type insulator with jumpering and greasing complete etc.,
Loading / unloading of all type of Distribution Transformers by Using Private crane
Dismantling of 7.5m/8m pole for HT/LT lines complete
Dismantling of 9.14/ 9.00m RCC/PSC pole for HT/LT lines, complete
Dismantling of RSJ/ 9m Square pole for HT/LT lines complete
Dismantling of stay set complete including refilling of excavated earth fixing clamp stay rod, guy, binding etc., complete.
Dismantling of conductor, stringing, binding and jumpering etc., complete ACSR 7/102 sqmm / AAAC 7/2.0,2.5sqmm
Dismantling of conductor, stringing, binding and jumpering etc., complete ACSR 7/132sqmm/ AAAC 7/3.15sqmm
Dismantling of conductor, stringing, sagging, binding and jumpering of conductor of size ACSR 7/4.09mm
Dismantling of conductor, sagging, binding and jumpering of conductor Leopard,Dog etc.,
Dismantling of single phase cross arm/with pin insulator/LT shackles, etc.,complete
Dismantling of T.I fittings with pin insulator/LT shackles, etc., complete
Dismantling of 3 phase cross arm without T.I Fittings with pin insulator/LT shackels etc., complete
Dismantling of V x arm T.I.Fittings with pin insulator, disc, etc., complete in 11 KV lines pin point location
Dismantling of V x arm T.I.Fittings with pin insulator, disc, etc., complete in 33KV/22 KV lines pin point location
Dismantling of V x arm T.I.Fittings with pin insulator, disc, etc., complete in 11 KV/22 KV lines Cut point location
Dismantling of V x arm T.I.Fittings with pin insulator, disc, etc., complete in 33KV/22 KV lines Cut point location
Dismantling of Tapping channel cross arm
Dismantling of Double pole structure materials such as top channel, transformer seating channel, belting angle etc, complete
Dismantling of HG fuse unit
Dismantling of Double pole structure AB switch
Dismantling of Transformer structure grounding and earthing of structure complete Double pole
Dismantling of Transformer LT cable wiring/LT bus bar
Dismantling of LT open type fuse unit including cable jumpering up to the line including cutting welding bending,drilling,fabrication etc (single side)
Dismantling of LT open type fuse unit including cable jumpering up to the line including cutting welding bending,drilling,fabrication etc (double side)
Dismantling of HT Jumpering
Dismantling of transformer should be always done by board staff onlly, if done by contractor (W/O Crane upto 100 KVA)
Dismantling of transformer should be always done by board staff onlly, if done by contractor (W/O Crane abvoe 100 KVA)
Dismantling of D.P. structural iron materials such as top channel bracing and earthing but excluding pole and ABS complete including welding and fabrication
Applicable SGST has to be quoted as numbers
Applicable CGST has to be quoted as numbers
Inter-state GST is applicable only for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only
M VEERAKUMAR (BID ID -1466820)
Bidder Name
M VEERAKUMAR
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .