| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.3 LAdmitted-Finance | ₹3.3 L | L1 | Admitted-Finance |
| 2 | L2₹3.9 LAdmitted-Finance 8 FLOOR 809 A ANSAL KIRTI SHIKHAR 11 DISTT CENTRE JANAK PURI NEW DELHI PIN 110058 | NEW DELHI | JANAK PURI | DELHI | 110058 | ₹3.9 L | L2 | Admitted-Finance |
| 3 | L3₹4.9 LAdmitted-Finance | ₹4.9 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SONA COOLING TOWERS L2 | COOLCREW AIRCON L3 | Flowtech Cooling System L1 |
|---|---|---|---|---|---|---|
| 1.00Replacement of the following elements with new ones including dismantling and removal of the existing unserviceable from the Cooling Towers of Central AC Plant located at Dronagiri & Saptagiri, sealing of vulnerable joints, parts with dealing compound wherever required to prevent any leakage, proper discarding by transporting them outside the campus. thorough cleaning the space, testing after installation, adjustments etc. complete as required. | ||||||
| 1.01 | PVC Fills film of size 2100mm x 600mm x 0.4mm (thickness) | 600 | Each | 445 ₹2.7 L | 530 ₹3.2 L | 375 ₹2.3 L |
| 1.02 | PVC spray Nozzles | 500 | Each | 68 ₹34,000 | 180 ₹90,000 | 59 ₹29,500 |
| 2.00 | Repairing of FPR basin of cooling tower by providing and coating of thickness not less than 5mm etc complete as per required. | 150 | Sqft | 276 ₹41,400 | 180 ₹27,000 | 236 ₹35,400 |
| 3.00 | Thorough overhauling of cooling tower's gear box including supplying and pouring of synthetic lubricant oil (Mobil) of grade EP90WT in the gear box of CT fan after draining out degraded lub oil from the gear box chamber, flushing and cleaning, etc. complete as required including proper balancing & alignment of fan set of cooling tower's including dismantling, removing after of fan blade proper alignment i.e. fixing of nutbolts, lifting of fan set for smooth operating & functioning etc as per required. | 3 | Job | 8,170 ₹24,510 | 8,000 ₹24,000 | 7,002 ₹21,006 |
| 4.00 | Supplying and fixing of 40mm GI pipe heavy duty in the cooling tower holding of PVC fills including dismantling and removing the existing defective pipes etc complete as required. | 70 | Metre | 299 ₹20,930 | 325 ₹22,750 | 256 ₹17,920 |
| 5.00 | Providing and finishing with synthetic enamel paint (Colour to be decided by the Engineer-in-charge as per site requirement) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface etc. complete on MS pipe / structures surfaces. (Acceptable make: Asian Paint / Berger / Nerolac / Dulux / Nippon / Indigo) | 20 | Litre | 125 ₹2,500 | 410 ₹8,200 | 200 ₹4,000 |
Tender Value
₹5.6 L
EMD Value
₹11,163
Closing Date
2 Mar 2026, 3:00 pmClosed
Executive Engineer
Assistant Executive Engineer-in-charge, AC Division, Works Department, IIT Delhi, Hauz Khas, New Delhi 110016
Repairing and Replacement of Unserviceable Spares in Cooling Tower of Dronagiri and Saptagiri Hostel Central AC Plant, IIT Delhi
2026_IIT_899842_1
IITD/WORKS (SP- 5256)/2026
Open Tender
Electrical Works
15 days
IIT Delhi Hauz Khas
Please refer Tender documents.
12 documents required · 12 mandatory
₹0
₹11,163
19 Mar 2026
23 Feb 2026
3 Mar 2026
23 Feb 2026
2 Mar 2026
23 Feb 2026
Replacement of the following elements with new ones including dismantling and removal of the existing unserviceable from the Cooling Towers of Central AC Plant located at Dronagiri & Saptagiri, sealing of vulnerable joints, parts with dealing compound wherever required to prevent any leakage, proper discarding by transporting them outside the campus. thorough cleaning the space, testing after installation, adjustments etc. complete as required.
PVC Fills film of size 2100mm x 600mm x 0.4mm (thickness)
PVC spray Nozzles
Repairing of FPR basin of cooling tower by providing and coating of thickness not less than 5mm etc complete as per required.
Thorough overhauling of cooling tower's gear box including supplying and pouring of synthetic lubricant oil (Mobil) of grade EP90WT in the gear box of CT fan after draining out degraded lub oil from the gear box chamber, flushing and cleaning, etc. complete as required including proper balancing & alignment of fan set of cooling tower's including dismantling, removing after of fan blade proper alignment i.e. fixing of nutbolts, lifting of fan set for smooth operating & functioning etc as per required.
Supplying and fixing of 40mm GI pipe heavy duty in the cooling tower holding of PVC fills including dismantling and removing the existing defective pipes etc complete as required.
Providing and finishing with synthetic enamel paint (Colour to be decided by the Engineer-in-charge as per site requirement) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface etc. complete on MS pipe / structures surfaces. (Acceptable make: Asian Paint / Berger / Nerolac / Dulux / Nippon / Indigo)
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.60 MB
BOQ_945833.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid