| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹59.0 LAccepted-AOC | ₹59.0 L | L1 | Accepted-AOC Aoc awarded |
| 2 | Rejected-Technical | - | - | Rejected-Technical Technical disqualified |
Tender Value
₹59.0 L
EMD Value
₹1.2 L
Closing Date
29 Jun 2020, 4:00 pmClosed
Superintending Engineer, PWD, Dibrugarh Road Circl
Superintending Engineer, PWD, Dibrugarh Road Circle
Construction of 1 No. Na-Patia Limboo Gaon Road Under SOPD-G for the year 2019-20 Under Tinsukia, Doom Dooma and Sadiya Territorial Road Division-Sadiya LAC.
2020_PWD_17972_1
DRC-XIII/16/98/NIT/TSK/152
Open Tender
Civil Works
Item Rate
270 days
Sadiya
Please refer tender document
6 documents required · 6 mandatory
₹1,700
Yes
Empowered Officer ASRB, A/C No. 10566991479
₹1.2 L
Yes
24 Sept 2020
24 Jun 2020
1 Jul 2020
24 Jun 2020
29 Jun 2020
24 Jun 2020
24 Jun 2020 - 29 Jun 2020
Amount
Clearing and Grubbing of Road Land Clearing and Grubbing Road Land .(Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs,saplings and trees girth up to 818 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to beused or auctioned up to lead of 818metres including removal and disposal of top organic soil not exceeding 150mm thickness.
Construction of embankment: Construction of embankment with approved materials obtained from borrow pits with a lift upto 1.5m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000m as per Technical Specification Clause 301.5 By Mechanical Means : Private Land .
Construction of subgrade: Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 818.2 with lead upto 818m as per Technical Specification Clause 303.1. (i) Private Land
Construction of granular sub-base: Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density,complete as per cl. 401( with an initial lead of 5 Km.)( Including cost of testing of materials at site and laboratory as directed by the deptt.
WBM Grading 2: Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 80-100 kN in stages to proper grade and camber, applying and brooming requisite type of screening/binding meterials to fillup the interstices of coarse aggregate, watering and compacting to the required density Grading II as per Technical Specification Clause (with an initial lead of 5.0 Km.)
Interlocking Concrete Block Pavement : Providing and laying interlocking Concrete Block Pavement having thickness 80 mm as per Technical Specification Clause 1504 complete including carriage.
Rectro-reflectorised Traffic Signs : Providing and fixing of retro-reflectorised cautionary, mandatory,and informatory sign as per IRC: 67 made of encapsulatedlens type reflective sheeting vide clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75mm X 75mmX 6mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450mmX 450X 600mm, 600mm below ground level as per drawings and Technical Specification Clause 801 ii) 600mm equilateral triangle.
Tree plantation : Planting of trees and their maintenance for three year (Planting of trees by the road side) (Avenue trees) in .60 m dia holes, 1m deep dug in the ground, mixing the soil with decayed farm yard/sludge manure , planting the saplings, backfilling the trenches, watering, fixing the tree guatrd and maintaing the trees for three years
Construction of HPC 1000mm dia NP3 : Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary soil : A. Manual Means. (i) Without dewatering, a) Upto 3 m depth.
PCC M10 (1:3:6 nominal mix) in levelling course below open foundation of Head walls as per drawings & Technical Specification Clause 1109. I .
Bedding for pipe (ii) Type B(First Class) Bedding Laying (First Class) bedding on well compacted sand moorum as per Clause 1105 (ii) Granular Material
Providing & laying reinforced cement concrete NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106 (B) 1000 mm dia
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 II. P.C.C. grade M-20 (i) Nominal mix 1:2.5:5 (Hand mixing)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .