Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.5 LAdmitted-Finance | ₹23.5 L | L1 | Admitted-Finance |
| 2 | L2₹25.4 LAdmitted-Finance 07 THALAIYUR KARUPPUREDDIYUR PO PN PATTY METTUR DAM 636 404 | SALEM | TAMIL NADU | 636404 | ₹25.4 L | L2 | Admitted-Finance |
| 3 | L3₹25.7 LAdmitted-Finance 5 151 B DR SUBRAYAN NAGAR EAST MAIN ROAD METTUR DAM 636401 | METTUR DAM | SALEM | TAMIL NADU | 636401 | ₹25.7 L | L3 | Admitted-Finance |
| 4 | L4₹31.1 LAdmitted-Finance | ₹31.1 L | L4 | Admitted-Finance |
| 5 | L5₹32.5 LAdmitted-Finance 4 C 13 SIDCO INDUSTRIAL ESTATE METTUR DAM 636 402 SALEM DT | SALEM | TAMIL NADU | 636402 | ₹32.5 L | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | metturassociates L5 | PMP&CO L2 | Ma UNIVERSES L6 | S V V ONSITE L1 | SRI SUBRAMANIYAN DIESEL AND ENGINEERING WORKS PRIVATE LIMITED L3 | ASS&CO L4 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Charges for removal of ash accumulated ash in the Primary pond I & II in and around the suction pipe line of ash recovery line in the Primary pond I & II & clearing the ash from the Trenches at Railway sliding office to western side compound wall of MTPS-1 & UNIT -IV ESP back side to AHPH -I & II back side Trenches as directed by engineer by using earth moving machineries / vehicles. | 15,000 | MT | 93.64 ₹14,04,600 | 76.5 ₹11,47,500 | 98 ₹14,70,000 | 72 ₹10,80,000 Lowest | 86 ₹12,90,000 | 85 ₹12,75,000 |
| 2.00 | Charges for loading of removed and piled ash at the bank of Primary Pond I & II & clearing the ash from the Trenches at Railway sliding office to western side compound wall of MTPS-1 & UNIT -IV ESP back side to AHPH -I & II back side Trenches area by using earth moving equipment. | 15,000 | MT | 53.85 ₹8,07,750 | 36.5 ₹5,47,500 | 58 ₹8,70,000 | 32 ₹4,80,000 Lowest | 48 ₹7,20,000 | 50 ₹7,50,000 |
| 3.00 | Charges for transportation of the loaded accumulated and piled ash in and around the ash in Primary Pond I & II area at UAD/ LAD & clearing the ash from the Trenches at Railway sliding office to western side compound wall of MTPS-1 & UNIT-IV ESP back side to AHPH -I & II back side Trenches as per the direction of Engineer in charge | 15,000 | MT | 68.68 ₹10,30,200 | 55.5 ₹8,32,500 | 68 ₹10,20,000 | 52 ₹7,80,000 | 37 ₹5,55,000 Lowest | 70 ₹10,50,000 |
| 4.00 | Charges for Consumables & Hire charges for T&P's | 1 | No. | 10,000 ₹10,000 | 8,000 ₹8,000 | 41,000 ₹41,000 | 7,000 ₹7,000 | 4,000 ₹4,000 Lowest | 30,000 ₹30,000 |
Tender Value
Refer Docs
EMD Value
₹41,100
Closing Date
29 May 2026, 2:00 pmClosed
CE / MTPS-I
The Chief Engineer Mettur Thermal Power Station-I Mettur Dam- 636406 Salem District
MTPS I M II OAHS Removal and transportation of retrieved ash from Primary pond I and II to LAD UAD
2026_EB_676834_1
CE SE M II MTPS I OAHS OT 05 2026 2027
Open Tender
Miscellaneous Works
Works
365 days
MTPS-I
As per Tender Specification
7 documents required · 7 mandatory
₹0
₹41,100
Yes
23 Jul 2026
13 May 2026
30 May 2026
13 May 2026
29 May 2026
13 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Charges for removal of ash accumulated ash in the Primary pond I & II in and around the suction pipe line of ash recovery line in the Primary pond I & II & clearing the ash from the Trenches at Railway sliding office to western side compound wall of MTPS-1 & UNIT -IV ESP back side to AHPH -I & II back side Trenches as directed by engineer by using earth moving machineries / vehicles. | 15,000 | MT | - | - |
| 2 | Charges for loading of removed and piled ash at the bank of Primary Pond I & II & clearing the ash from the Trenches at Railway sliding office to western side compound wall of MTPS-1 & UNIT -IV ESP back side to AHPH -I & II back side Trenches area by using earth moving equipment. | 15,000 | MT | - | - |
| 3 | Charges for transportation of the loaded accumulated and piled ash in and around the ash in Primary Pond I & II area at UAD/ LAD & clearing the ash from the Trenches at Railway sliding office to western side compound wall of MTPS-1 & UNIT-IV ESP back side to AHPH -I & II back side Trenches as per the direction of Engineer in charge | 15,000 | MT | - | - |
| 4 | Charges for Consumables & Hire charges for T&P's | 1 | No. | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.78 MB
BOQ_813264.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].