Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.9 LAccepted-AOC NO 430B ARAKKONAM TIRUTHANI ROAD ARAKKONAM RANIPET DISTRICT | ARAKKONAM | RANIPET | TAMIL NADU | L1 | Accepted-AOC L1 | |
| 2 | L2₹6.0 L+₹6,662.28 (1.13%)Rejected-AOC KERADAMATTAM KOTAGIRI | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | purushothaman L2 | MPANDCO L1 |
|---|---|---|---|---|---|
| 1.00Construction of New Toilet at PUE School at Narayanamangalam Kandigai in Perungalathur Panchayat | |||||
| 2.00 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 16.21 | cum | 300 ₹4,863 | 263.78 ₹4,276 Lowest |
| 3.00 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 4.63 | cum | 6,090.99 ₹28,201 Lowest | 6,090.99 ₹28,201 Lowest |
| 4.00 | Collection and supply of gritty gravel from approved quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | 5.05 | cum | 600 ₹3,030 | 495.92 ₹2,504 Lowest |
| 5.00 | Brick work in C.M 1:5 mix using Country bricks incuding cost and conveyance and all labour charges etc. | 14.8 | cum | 6,320.96 ₹93,550 Lowest | 6,320.96 ₹93,550 Lowest |
| 6.00 | Supply and erecting of centering including cost and conveyance of all materials to work site and all labaour charges etc complete (Below GL) | 25.15 | Sqm | 600 ₹15,090 | 545 ₹13,707 Lowest |
| 7.00 | Supply and erecting of centering including cost and conveyance of all materials to work site and all labaour charges etc complete (Above GL) | 17.35 | Sqm | 1,095 ₹18,998 Lowest | 1,095 ₹18,998 Lowest |
| 8.00 | Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges | 0.57 | MT | 91,951 ₹52,412 Lowest | 91,951 ₹52,412 Lowest |
| 9.00 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials | 7.15 | cum | 9,999.51 ₹71,496 Lowest | 9,999.51 ₹71,496 Lowest |
| 10.00 | Floor Finishing with AntiSkilled Ceromic Tiles of Size 305 x 305 x 6 mm including cost including cost and Conveyane | 18.2 | Sqm | 1,550 ₹28,210 | 1,480.78 ₹26,950 Lowest |
Tender Value
₹6.1 L
EMD Value
₹6,116
Closing Date
14 Oct 2025, 4:00 pmClosed
BDO BP
Panchayat Union Arakkonam
CONSTRUCTION OF TOILET AT PUE SCHOOL AT NARAYANAMANGALAM KANDIGAI IN PERUNGALATHUR PANCHAYAT
2025_RDTN_612555_1
A2/1028/2025
Open Tender
Civil Works
Item Rate
180 days
Arakkonam
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹6,116
Yes
1 Nov 2025
9 Oct 2025
14 Oct 2025
9 Oct 2025
14 Oct 2025
9 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .