| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹89.6 LAccepted-AOC 213 TAJOPUR PASCHIMPURA MAUNATH BHANJAN MAU MAU UTTAR PRADESH 275101 UDYAM UP 55 0009322 | MAU | UTTAR PRADESH | 275101 | ₹89.6 L | L1 | Accepted-AOC technicall qualified and quoted lowest amount |
| 2 | L2₹91.2 LRejected-Finance | ₹91.2 L | L2 | Rejected-Finance QUOTED HIGHER RATE THAN L1 |
| 3 | Not Admitted-Fee/PreQual/Technical 14 453 INDIRA NAGAR LUCKNOW UTTAR PRADESH | BIJNOR | UTTAR PRADESH | 246701 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M/S SINGH CONSTRUCTION L1 | ARUN CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00 | Cleaning thick jungle & thorney bushes without uprooting. | 275.6 | Per 100 sqm | 462.8 ₹1.3 L | 470.5 ₹1.3 L |
| 2.00 | Earth work in excavation including lead upto 30 mtr and lift upto 1.5 mtr excluding mechanical compaction but including manual compaction and dressing to the profile. | 31,270 | cum | 105 ₹32.8 L | 106.8 ₹33.4 L |
| 3.00 | Earth work in foundation in all type of soil with all lead &lift including T&P etc. required for proper completion of work. | 776.69 | cum | 105 ₹81,552.45 | 106.8 ₹82,950.49 |
| 4.00 | Laying PCC 1:3:6 in fixing pllars with coarse sand & stone grit 12 to 20 mm size including cost of all material labour T&P etc. | 34.9 | cum | 5,407.5 ₹1.9 L | 5,500 ₹1.9 L |
| 5.00 | Class 150 Brick work in 1:4 cement and sand of 1.25 F.M. mortar including supply of all material, labour and T&P etc. | 185.4 | cum | 4,812.5 ₹8.9 L | 4,895 ₹9.1 L |
| 6.00 | Cement Plaster with 1:3 cement mortar over Brick work 1.25 cm thick | 7.56 | sqm | 153.1 ₹1,157.44 | 156 ₹1,179.36 |
| 7.00 | Finishing walls with premium acrylic smooth exterior paint with silicon additives of required shade over and including priming coat of exterior primer to give an even shade after throughly brussing the surface including curing and cost of all materials. | 136.37 | sqm | 107.65 ₹14,680.23 | 109.5 ₹14,932.52 |
| 8.00 | Writing letter on pillers with 50 mm size but below 80 mm size | 200 | no. | 8 ₹1,600 | 8.15 ₹1,630 |
| 9.00 | Laying and placing reinforcement of steel in position including bending binding cutting with cost of binding wire etc. but including cost of steel | 118.12 | KG | 77.8 ₹9,189.74 | 79.15 ₹9,349.20 |
| 10.00 | Cement concrete 1:1.5: 3 in bed block with(1 cement :1.5 coarse sand :3 stone grite 20 mm nominal size all cost of material labour , T&P etc. required for proper completion work. | 82.42 | cum | 8,268.75 ₹6.8 L | 8,410.5 ₹6.9 L |
Tender Value
₹1.0 Cr
EMD Value
₹2.1 L
Closing Date
17 Oct 2025, 1:00 pmClosed
SE SIX CIRCLE LUCKNOW
SE Six circle lucknow
Janpad Unnao me Rawatpur Scape ke km 0.000 se km 4.200 rak punarsthapana tatha pul-puliyo ke marmmat avam punarnirman ka karya
2025_UPIDC_1081543_8
03/SE-6/2025-26
Open Tender
Civil Works
360 days
unnao
Please refer tender document
2 documents required · 2 mandatory
₹3,384
₹2.1 L
SE Six circle lucknow
24 Dec 2025
10 Oct 2025
17 Oct 2025
10 Oct 2025
17 Oct 2025
10 Oct 2025
13 Oct 2025
Amount
Cleaning thick jungle & thorney bushes without uprooting.
Earth work in excavation including lead upto 30 mtr and lift upto 1.5 mtr excluding mechanical compaction but including manual compaction and dressing to the profile.
Earth work in foundation in all type of soil with all lead &lift including T&P etc. required for proper completion of work.
Laying PCC 1:3:6 in fixing pllars with coarse sand & stone grit 12 to 20 mm size including cost of all material labour T&P etc.
Class 150 Brick work in 1:4 cement and sand of 1.25 F.M. mortar including supply of all material, labour and T&P etc.
Cement Plaster with 1:3 cement mortar over Brick work 1.25 cm thick
Finishing walls with premium acrylic smooth exterior paint with silicon additives of required shade over and including priming coat of exterior primer to give an even shade after throughly brussing the surface including curing and cost of all materials.
Writing letter on pillers with 50 mm size but below 80 mm size
Laying and placing reinforcement of steel in position including bending binding cutting with cost of binding wire etc. but including cost of steel
Cement concrete 1:1.5: 3 in bed block with(1 cement :1.5 coarse sand :3 stone grite 20 mm nominal size all cost of material labour , T&P etc. required for proper completion work.
Struck Pointing on Brick with Cement Mortar in 1:2 with consisting of one part cement & two parts of fine sand of 1.25 FM. Including Supply of all material, labour & T&P etc required for proper completion of the work.
Earth work in excavation including lead upto 30 m & Lift above 1.5 m, excluding mechanical compaction but including manual compaction and dressing to profile. for making road diversion
Demolishing brick work in cement mortar manually/ by mechanical means including disposal of unserviceable material with in 50 m. lead as per direction of Engineer-in-charge.
Pointing structure on brick work 1:2 ( 1 cement :2 coarse sand ) with all cost of material ,labour , T&P etc. required for proper completion of work.
Mild steel or iron plain work such as reinforcement concrete wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage & over laping & hooks.
Supply and fixing R.C.C. hume pipe 90 cm dia in chanal diversion with all cost of material ,labour , T&P etc. required for proper completion of work.
Dismentling road diversion including staking of all material as per directed engineer in charge with a distance of 60 m.
Brick Soling for making approach for road including all lead and lift ,T & P and labours etc.required for proper completion work.
brick on edge floring with bricks of class -150 on a bed of 12 mm cement morter 1:4 (1 cement : 4 c. sand) including filling the joints with same mortar etc. required for proper completion work.
Cement concrete 1:3:6 in foundation with (1 cement :3 coarse sand : 6 stone balast 40 mm nominal size all cost of material, labour T&P etc. required for proper completion work.
Cement concrete 1:2:4 in foundation with (1 cement :2coarse sand : 4stone balast 40 mm nominal size all cost of material, labour T&P etc. required for proper completion work.
Pointing structure on brick work 1:2 ( 1 cement :2 coarse sand ) with all cost of material ,labour , T&P etc. required for proper completion of work.
Fabrication and supply sign board on angle iron frame 35x35x5 mm 25x3 mm flat iron bracing sand 16 SWG MS sheet with one coat of red oxide primer including cost of all material.
Painting two coat synthetic enamel paint on new surface with superior quality approved,cost of all material labour T&P required for proper completion of work.
Writing letter on sign board with size above 50 mm but below 80 mm
Steel work welded in built up sections ramed work, including cutting In gratings, frames, guard bar, ladder, railings, bracketshoisting, fixing in position and applying a priming coatof approved steel primer using structural-steel etc. as reaquired In gratings, frames, guard bar, ladder, railings, brackets
SS Bolt with washer of different sizes for structural glazing /ACP Cladding
ARUN CONSTRUCTION (BID ID -5612892)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid