| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.3 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹40.4 L+₹1.0 L (2.66%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | Not Admitted-Finance 0 0 RAMNAGAR FATEHPUR ROAD KADIRABAD GRAM BUDHWAL PARGANA AND TEHSIL RAMNAGAR BARABANKI UTTAR PRADESH 225202 | BARABANKI | UTTAR PRADESH | 225202 | - | Not Admitted-Finance Others-NOT ADMITTED DUE TO OBJECTION RAISED BY JAI DURGE NAMAH CONS. BAGHPAT AND TENDER CONDITION NO 25. |
| Sl No | Description | Qty | Unit | M/S MASHROOF AHMAD CONTRACTOR L1 | A.R. Construction L2 |
|---|---|---|---|---|---|
| 1.00Cost of Earth work | |||||
| 1.01 | Removing of Jalkumbhi / Sawer Grass | 9,045 | Sq.Mt. | 4.2 ₹37,989 Lowest | 4.2 ₹37,989 Lowest |
| 1.02 | DEWATERING BEFORE AND DURING WORK | 474 | Hour | 209 ₹99,066 Lowest | 212.5 ₹1,00,725 |
| 1.03 | Earth Work in Excavation in Slush and Lahel including disposal at suitable place by Poclain Machine | 16,630.82 | Cum | 86 ₹14,30,250.9 Lowest | 89 ₹14,80,143.37 |
| 1.04 | Extra for slush and level for earth work excluding disposal at suitable place for slush decompsition. | 16,630.82 | Cum | 50 ₹8,31,541.22 Lowest | 52 ₹8,64,802.87 |
| 1.05 | Earth Work in Excavation in Ordinary Soil by Poclain Machine/Manual etc. | 6,590.91 | Cum | 88 ₹5,80,000 Lowest | 89 ₹5,86,590.91 |
| 1.06 | Dressing of Earth used in Bund | 5,250 | Sq.Mt. | 6 ₹31,500 Lowest | 6 ₹31,500 Lowest |
| 1.07Ramp | |||||
| 1.08 | EARTH WORK IN EXCAVATION IN ORDINARY SOIL FOR FOUNDATION | 50.2 | SQM | 95 ₹4,769 Lowest | 97 ₹4,869.4 |
| 1.09 | CEMENT CONCRETE (1:4:8) CEMENT SAND & 22.5-53 MM BRICK BALLAST FOR FOUNDATION GHAT | 12.35 | CUM | 3,250 ₹40,144 Lowest | 3,320 ₹41,008.64 |
Tender Value
Refer Docs
EMD Value
₹4.0 L
Closing Date
30 Jun 2023, 5:00 pmClosed
EEMI MEERUT
EEMI MEERUT
RENOVATION OF POND AT VILLAGE SAKOTI BLOCK MAWANA DISTT MEERUT
2023_UPMID_813493_1
200(E-35/23-24)
Open Tender
Civil Works
Item Rate
60 days
MEERUT
RENOVATION OF POND AT VILLAGE SAKOTI BLOCK MAWANA DISTT MEERUT
2 documents required · 2 mandatory
₹2,354
EEMI MEERUT
₹4.0 L
18 Jul 2023
20 Jun 2023
3 Jul 2023
20 Jun 2023
30 Jun 2023
20 Jun 2023
Amount
Cost of Earth work
Removing of Jalkumbhi / Sawer Grass
DEWATERING BEFORE AND DURING WORK
Earth Work in Excavation in Slush and Lahel including disposal at suitable place by Poclain Machine
Extra for slush and level for earth work excluding disposal at suitable place for slush decompsition.
Earth Work in Excavation in Ordinary Soil by Poclain Machine/Manual etc.
Dressing of Earth used in Bund
EARTH WORK IN EXCAVATION IN ORDINARY SOIL FOR FOUNDATION
CEMENT CONCRETE (1:4:8) CEMENT SAND & 22.5-53 MM BRICK BALLAST FOR FOUNDATION GHAT
BRICK WORK IN MASONARY 1:4 CEMENT & COARSE SAND MORTAR
12 MM THICK CEMENT PLASTER IN 1:4 CEMENT & COARSE SAND MORTAR
100 MM THICK C:C 1:2:4 CEMENT COARSE SAND & 20 MM GAUGE FINE STONE GRIT
COLOUR WASHING (TWO COATS) INCLUDING COST OF MATERIAL AND LABOUR
Inlet
Earth Work in Excavation in Ordinary Soil including Lift 1.50m and Lead 30.0m including Filling, watering and ramming of Excavated Soil.
Supply and Laying of Cement Concrete in . etc. 1:4:8 Cement, Fine Sand and 40mm Brick Ballast etc. Complete in all respect.
M-150 Masonary work in 1:4 Cement and Coarse Sand Mortar
12mm Thick Plaster Work on Brick Masonary Wall in 1:4 Cement and Coarse Sand Mortar.
Cement Concrete Work P.C.C. in 1:2:4 with Cement, Coarse Sand and 20 mm. Stone Gritt.
Reinforced Cement Concrete Work in 1:2:4 with Cement, Coarse Sand and 20 mm. Stone Grit in base of chamber
10 mm Iron Bar for R.C.C. Work
Providing and Fixing in position with alignment including proper slope of R.C.C. HUME PIPE NP-3 (S&S Type) 600MM Dia
Providing and Fixing of M.S. Screen (1.5'X1.5') made by Iron Bars in Chamber.
Outlet
EARTH WORK IN EXCAVATION IN FOUNDATION IN ORDINERY SOIL
PCC WORK IN 1:4:8 WITH CEMENT, FINE SAND AND 40 MM GAUGE BRICK BALLAST
M-150 CLASS BRICK WORK IN 1:4 WITH CEMENT AND FINE C/ MORTAR
12 MM THICK PLASTER IN 1:4 CEMENT & FINE SAND MORTAR
PCC WORK IN 1:2:4 WITH CEMENT, COARSE SAND AND 10 MM GAUGE STONE GRIT
LAYING OF 900 MM NP-3 HUME PIPE IN POSITION
Flag Hosting platform
EARTH WORK IN EXCAVATION IN ORDINARY SOIL FOR FOUNDATION
CEMENT CONCRETE (1:4:8) CEMENT SAND & 22.5-53 MM BRICK BALLAST FOR FOUNDATION GHAT
BRICK WORK IN MASONARY 1:4 CEMENT & COARSE SAND MORTAR
12 MM THICK CEMENT PLASTER IN 1:4 CEMENT & COARSE SAND MORTAR
SUPPLY AND LAYING OF 20-40 MM BRICK BALLAST INCLUDING CONSOLIDATION WITH FINE SAND
SUPPLY AND LAYING OF 4 CM THICK FINE SAND LAYER
SUPPLY AND LAYING OF 80 MM THICK ISI MARKED CONFIRMING TO IS 15658- 2006 I SHAPED MECHANICALLY COMPRESSED INTERLOCKING CEMENT CONCRETE PAVER BLOCKS SMOOTH HIGH GLOSS SKID RESISTANT MANUFACTURED FROM RUBBER MOULD THROUGH VIBRO COMPRESSION MECHANISM HIGH PRESSURE AND CONTROL VIBRATION MACHINE.
SUPPLY OF 63 MM DIA G.I. PIPE FOR FLAG HOSTING
COLOUR WASHING (TWO COATS) INCLUDING COST OF MATERIAL AND LABOUR
General work
PRE & POST SURVEY WORK
DRONE VIDEOGRAPHY AND PHOTOGRAPHY BEFORE AND DURING THE WORK
SUPPLY AND FIXING OF SIGN BOARD
SUPPLY AND FIXING OF R.C.C. / FRP BENCH
A.R. Construction
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .