Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹16.8 L
EMD Value
₹17,000
Closing Date
16 Feb 2023, 3:00 pmClosed
Block Development Officer
Block Development Officer(BP) Thimiri Block 632512
Construction of 30000 Litres Capacity OHT Tank of 12m Staging height at Marudhamangalam ADC H/O Gundaleri Panchayat In Thimiri Panchayat Union Ranipet District.
2023_RDTN_287339_1
A2/1878/2022 Dated 01.02.2023
Open Tender
Civil Works
Works
90 days
Thimiri Block
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹17,000
17 Feb 2023
9 Feb 2023
16 Feb 2023
9 Feb 2023
16 Feb 2023
9 Feb 2023
Amount
Thimiri Block
Construction of 30000 Litres Capacity OHT Tank of 12m Staging height @ Marudhamangalam ADC H/O Gundaleri Panchayat In Thimiri Panchayat Union in Thimiri Block, Ranipet District
Earth work Excavation for Foundation in all soils and Sub Soil as per SS20B for foundation etc. complete.SS 20B
Sand filling with clear river sand including watering, consolidation etc.,complete for Foundation as directed by Bdo officers
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Items 1.50 m to 4.50m below GL
UP Below GL
Items 0.0 to 4.50m Above GL
Above 4.51m and Upto 7.32Ht m
Above 7.32m and Upto 10.98 m
From 10.98m Upto 14.64m above GL
From 14.64m to Above GL
Supplying and erecting centering shuttering inculding necessary support for plane surfae foundation and basement and in all floors for RCC column footing column plinth beam roof slabs, strircase steps bed blocks critical
Square column
Below GL
8.31 to 9.30m ht
10.31 to 10.90m ht
11.31 to 11.40m ht
For Plan surface
Below GL
From 0.00 - 3.30m
From 5.30m to 6.30 m
From 7.30m to 8.30m above G.L
From 8.30m to 9.30m above G.L
From 11.30 m to 12.30m
Curved Surface
Up to 0- 3.30m Height
From 5.31m to 6.30m Height
Supply and fabrication of steel including cost and conveyance and labour charges etc complete.
Painting two coats with Emulsion Paint paint including cost and conveyance of all materials to site and all labour charges etc comoplete
For Pipe Connection
65 mm GI Pipe Inlet & Outlet
50 mm GI Pipe for scour pipe
50 mm GM Gate Valve
50 mm Flnage Set
65 mm GI Coupling
65 mm GI ELBOW
50 mm GI ELBOW
Supplying , Fabricating,Delivery and placing in position MS steel Ladder wide 0.45m made out of 50x50x6mm MS angle for sides and steps in 16mm MS plain rods fixed at 30cm c/c welded and Jointed etc. , Complete complying with stanard specification.
Providing Manhole cover of size 0.60x0.60 m in RCC 1:11/2:3 mix with suitable reinforcement and 50x50x6mm Ms angle fixed along edges and as directed by Departmental Officers
Supplying and delivery and fixing in Position of 150 mm dia AC Ventilators on the Roof slab
Providing Cut Stone Slab in Cm :3 mix and as directed by departmental officers
Providing and fixing of RCC inner access ladder in RCC 1:1:5:3 (one cement, one and half sand and three aggregates) using 20mm HBG stone for OHT including cost of reinforcement, placing grill in position, centering shuttering charges, mixing concrete curing etc., to required height and clear width of 45cm consisting of two Nos. of vertical post of 10cm x 15cm and step slab of 25mm x25mm etc., complete and as directed by Board officers.
90 mm PVC Pipe 6KSC
Earth work excavation and depositing on bank with initial lead and lift in all soil
Laying and Jointing of PVC Pipe into trench PVC Pipe
Refilling trench with excavated earth after laying the Pipe
Refilling in Basement with excavated Earth in layers of not more than 15cm. Thick well rammed, watered and consolidated complying with standard specifications etc., complete.
GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package}
KBJ CONSTRUCTION
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .