Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.0 LAccepted-AOC | ₹21.0 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹21.5 LRejected-AOC | ₹21.5 L | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | J NARENDRAN | AADHI MALLI CONSTRUCTION |
|---|---|---|---|---|---|
| 1.00 | Dismantling the Existing Reinforced cement Concrete including cost and conveyance of all materials and labour charges etc complete. | 5.25 | M3 | 26,250 ₹30,975 | 24,202.5 ₹28,558.95 |
| 2.00 | Dismantling the Existing Plain cement Concrete including cost and conveyance of all materials and labour charges etc complete. | 27.5 | M3 | 14,300 ₹16,874 | 14,300 ₹16,874 |
| 3.00 | Earth Work excavting and depositing on bank with initial lead of 10m & initial lift of 2m in Sand,Silt or other loose soil,wet sand or silt not under water,light black cotton soil sandy loam and ordinary soil including excavated earth etc completed as per the standard specifications | 220 | M3 | 36,300 ₹42,834 | 36,300 ₹42,834 |
| 4.00 | Supplying and filling in foundation and basement with filling crusher stone dust in layers of not more than 15cm.thick well rammed watered and compacted etc., complete complying with standard specification. | 31.6 | M3 | 9,638 ₹11,372.84 | 9,638 ₹11,372.84 |
| 5.00 | Plain Cement Concrete 1:5:10 mix (One Cement, Four crushed stone sand and Eight Coarse Aggregate) Using 40mm ISS HBG metal for foundation and basement including dewatering if found necessary and laid in layer of not more than 15cm thick and consolidated including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers(TNBP No.28). | 31.6 | M3 | 1,89,600 ₹2.2 L | 1,70,008 ₹2.0 L |
| 6.00 | Supplying and erecting centering for sides and soffits including supports and strutting uptp 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90cmx60cm and 10 gauge stiffened, welded with mild steel angles of size 25mmx25x3mm for boarding laid over silver oak (country wood) joist of size 10cmx6.5cm dia spaced about 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre tocentre etc.complete complying with standard specification and as directed by the departmental engineers. TNBP No.30 | 474 | M2 | 2,27,520 ₹2.7 L | 2,27,520 ₹2.7 L |
| 7.00 | Plain Cement concrete 1:2:4 (one cement, Two crushed stone sand, Four aggregate) using 20mm gauge hand broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication.-10 m3 | 73 | M3 | 5,47,500 ₹6.5 L | 5,29,250 ₹6.2 L |
| 8.00 | Supply and fixing of 38/40mm thick Kadapha stone slab with including cost and conveyance of all materials and including all labour charges etc complete.SOR page no.19 | 177 | M2 | 75,225 ₹88,765.50 | 75,225 ₹88,765.50 |
| 9.00 | Plastering with cement mortar (1:5) 12mm ,thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications (S.I.306) | 158 | M2 | 48,980 ₹57,796.40 | 48,980 ₹57,796.40 |
| 10.00 | Providing and laying in position ,Standardised Concrete Mix M-20 Grade in accordance with IS 456-2000, using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/m3 and maximum water cement ratio of 0.55, including admixture (plasticiser/ super plasticiser) in recommended proportions as per IS:9103 to accelerate , retard setting of concrete, improve workability without impairing strength and durability with about ( 5 Cu.m) 7730 kg of 20mm machine crushed stone jelly and with about (3.3 cu.m) 5156 kg of 10-12mm machine crushed stone jelly and with about (4.79 cu.m) 7670 kg of sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying ,Vibrating with mechanical vibrators , finishing ,curing , etc. and providing fixtures like fan clamps in the RCC floor/roof slabs wherever necessary without claiming extra, etc complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS Standards. ( No seperate payment will be made by the Department for the excess usage of materials). | 27 | M3 | 2,37,600 ₹2.8 L | 2,32,875 ₹2.7 L |
Tender Value
₹21.5 L
EMD Value
₹21,500
Closing Date
27 Jan 2026, 3:00 pmClosed
The Commissioner, Tambaram City Municipal Corporat
No.01,Kalaivani Street , Rajakilpakkam, chennai-73
Construction of SWD and culvert to Ayyasamy street in ward no.35
2026_DMA_644789_9
003/2025/E1
Open Tender
Civil Works
90 days
Tambaram City Municipal Corporation
Construction of SWD and culvert to Ayyasamy street in ward no.35
2 documents required · 2 mandatory
₹0
₹21,500
26 May 2026
20 Jan 2026
27 Jan 2026
20 Jan 2026
27 Jan 2026
20 Jan 2026
Dismantling the Existing Reinforced cement Concrete including cost and conveyance of all materials and labour charges etc complete.
Dismantling the Existing Plain cement Concrete including cost and conveyance of all materials and labour charges etc complete.
Earth Work excavting and depositing on bank with initial lead of 10m & initial lift of 2m in Sand,Silt or other loose soil,wet sand or silt not under water,light black cotton soil sandy loam and ordinary soil including excavated earth etc completed as per the standard specifications
Supplying and filling in foundation and basement with filling crusher stone dust in layers of not more than 15cm.thick well rammed watered and compacted etc., complete complying with standard specification.
Plain Cement Concrete 1:5:10 mix (One Cement, Four crushed stone sand and Eight Coarse Aggregate) Using 40mm ISS HBG metal for foundation and basement including dewatering if found necessary and laid in layer of not more than 15cm thick and consolidated including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers(TNBP No.28).
Supplying and erecting centering for sides and soffits including supports and strutting uptp 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90cmx60cm and 10 gauge stiffened, welded with mild steel angles of size 25mmx25x3mm for boarding laid over silver oak (country wood) joist of size 10cmx6.5cm dia spaced about 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre tocentre etc.complete complying with standard specification and as directed by the departmental engineers. TNBP No.30
Plain Cement concrete 1:2:4 (one cement, Two crushed stone sand, Four aggregate) using 20mm gauge hand broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication.-10 m3
Supply and fixing of 38/40mm thick Kadapha stone slab with including cost and conveyance of all materials and including all labour charges etc complete.SOR page no.19
Plastering with cement mortar (1:5) 12mm ,thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications (S.I.306)
Providing and laying in position ,Standardised Concrete Mix M-20 Grade in accordance with IS 456-2000, using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/m3 and maximum water cement ratio of 0.55, including admixture (plasticiser/ super plasticiser) in recommended proportions as per IS:9103 to accelerate , retard setting of concrete, improve workability without impairing strength and durability with about ( 5 Cu.m) 7730 kg of 20mm machine crushed stone jelly and with about (3.3 cu.m) 5156 kg of 10-12mm machine crushed stone jelly and with about (4.79 cu.m) 7670 kg of sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying ,Vibrating with mechanical vibrators , finishing ,curing , etc. and providing fixtures like fan clamps in the RCC floor/roof slabs wherever necessary without claiming extra, etc complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS Standards. ( No seperate payment will be made by the Department for the excess usage of materials).
Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors.
Removal of excavated excess earth including conveyance charges and all labour charges for filling etc complete
Supply and fixing of SFRC Manhole including cost and conveyance of all materials and labour charges etc complete.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_772701.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.44 MB
BOQ_772701.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid