| 1 | L1₹15.8 LAdmitted-Finance PALAIYUR SIRUMALAI DINDIGUL 624003 | DINDIGUL | TAMIL NADU | 624003 | ₹15.8 L | L1 | Admitted-Finance |
| 2 | L2₹16.1 LAdmitted-Finance | ₹16.1 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | NAGARAJ CONTRACTOR L2 | MSV CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00Name of the work : 1. Construction of Compound wall at MVM College Rear Side H/o Kurumbapatty Estimate amount : Rs. 16.00 Lakhs | |||||
| 2.00 | Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B | 67.08 | cum | 265 ₹17,776.20 | 263 ₹17,642.04 |
| 3.00 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to site and labour charges etc. complete. | 9.6 | cum | 5,455 ₹52,368 | 5,418 ₹52,012.80 |
| 4.00 | Supplying and Erecting Centering with cost and conveyance of all materials and all labour charges etc., complete complying with stanadrd specification. | 225.45 | sqm | 555 ₹1.3 L | 547 ₹1.2 L |
| 5.00 | Supplying and fabrication of steel rods including cost & conveyance of steel as per std. Specification etc., complete. | 3.4 | Mt | 91,895 ₹3.1 L | 91,895 ₹3.1 L |
| 6.00 | RCC 1:1.5:3mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc complete | 31.2 | cum | 9,250 ₹2.9 L | 9,150 ₹2.9 L |
| 7.00 | Brick work in c.m 1:5 mix using country bricks including cost & conveyance of all materials to site and all labour charges etc., complete. | 46.75 | cum | 6,250 ₹2.9 L | 6,102 ₹2.9 L |
| 8.00 | Plastering in cm 1:5 - 12 mm thick for superstructure complying with standard specifications as directed etc complete | 484.5 | sqm | 295 ₹1.4 L | 283 ₹1.4 L |
| 9.00 | Painting two coats with approved exterior emulsion over one priming coat of over new cement plastered wall surface and ceiling inlcuding | 484.5 | sqm | 266 ₹1.3 L | 260 ₹1.3 L |
| 10.00 | Provision for Name board | 1 | No | 3,500 ₹3,500 | 2,500 ₹2,500 |
Tender Value
₹16 L
EMD Value
₹16,000
Closing Date
23 Feb 2026, 3:00 pmClosed
Block Development Officer (BP)
Block Development Officer (BP)
Mines Construction of Compound wall at MVM College Rear Side H/o Kurumbapatty
2026_RDTN_659498_1
Mines Construction of Compound wall at MVM College Rear Side H/o Kurumbapatty
Open Tender
Civil Works
Mines Construction of Compound wall at MVM Colleg
Mines Construction of Compound wall at MVM College Rear Side H/o Kurumbapatty
4 documents required · 4 mandatory
₹0
₹16,000
Yes
Panchayat Union Office Dindigul
24 Feb 2026
17 Feb 2026
23 Feb 2026
17 Feb 2026
23 Feb 2026
17 Feb 2026
21 Feb 2026
Name of the work : 1. Construction of Compound wall at MVM College Rear Side H/o Kurumbapatty Estimate amount : Rs. 16.00 Lakhs
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to site and labour charges etc. complete.
Supplying and Erecting Centering with cost and conveyance of all materials and all labour charges etc., complete complying with stanadrd specification.
Supplying and fabrication of steel rods including cost & conveyance of steel as per std. Specification etc., complete.
RCC 1:1.5:3mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc complete
Brick work in c.m 1:5 mix using country bricks including cost & conveyance of all materials to site and all labour charges etc., complete.
Plastering in cm 1:5 - 12 mm thick for superstructure complying with standard specifications as directed etc complete
Painting two coats with approved exterior emulsion over one priming coat of over new cement plastered wall surface and ceiling inlcuding
Provision for Name board
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.15 MB
Tendernotice_2.pdf
PDF • 0.39 MB
Tendernotice_3.pdf
PDF • 0.60 MB
BOQ_791266.xls
BOQ • 0.28 MB