| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.4 CrAdmitted-Finance BAHIRTAFA JADURBERIA ULUBERIA HOWRAH | ULUBERIA | HOWRAH | WEST BENGAL | ₹9.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹11.0 Cr+₹1.6 Cr (17.4%)Admitted-Finance | ₹11.0 Cr+₹1.6 Cr (17.4%) | L2 | Admitted-Finance |
| 3 | L3₹14.2 Cr+₹4.9 Cr (52.0%)Admitted-Finance | ₹14.2 Cr+₹4.9 Cr (52.0%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | UNIVERSAL CONSTRUCTION L1 | HERITAGE INFRASTRUCTURES L2 | ADHUNIK INFRASTRUCTURES PVT. LTD. L3 |
|---|---|---|---|---|---|---|
| 1.00SHEORAPHULI FERRY GHAT WAITING AREA/ NIGHT SHELTER | ||||||
| 1.00 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.
(a) Depth of excavation not exceeding 1,500 mm | 55.14 | Cum | 137.16 ₹7,563 | 119.27 ₹6,576.55 Lowest | 167 ₹9,208.38 |
| 1.00 | (b) Depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but not requiring shoring. | 37.35 | Cum | 221.24 ₹8,263.31 | 192.38 ₹7,185.39 Lowest | 269 ₹10,047.15 |
| 1.00 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work)
(a) With earth obtained from excavation of foundation | 61.52 | Cum | 89.17 ₹5,485.74 | 77.54 ₹4,770.26 Lowest | 109 ₹6,705.68 |
| 1.00 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codesa) Pakur Variety | 20.92 | Cum | 4,669 ₹97,675.48 Lowest | 7,400 ₹1,54,808 | 7,500 ₹1,56,900 |
| 1.00 | Controlled Cement concrete with well graded stone chips (20 mm nominal size) excluding shuttering and reinforcement with complete design of concrete as per IS : 456 and relevant special publications, submission of job mix formula after preliminary mix design after testing of concrete cubes as per direction of Engineer-in charge. Consumption of cement will not be less than 300 Kg of cement with Super plasticiser per cubic meter of controlled concrete but actual consumption will be determined on the basis of preliminary test and job mix formula. In ground floor and foundation.[using concrete mixture]
(b) M 25 Grade | 1.87 | Cum | 7,146.81 ₹13,364.53 Lowest | 7,500 ₹14,025 | 8,800 ₹16,456 |
| 1.01 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)
(c) Steel shuttering or 9 to 12 mm thick approved quality ply board shuttering in any concrete work | 8.8 | Sqm | 424.35 ₹3,734.28 | 369 ₹3,247.2 Lowest | 517 ₹4,549.6 |
| 1.01 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.
(a) For works in foundation and upto roof of ground floor/upto 4 m
(i) Tor steel/Mild Steel
I. SAIL/ TATA/RINL | 0.2 | MT | 63,152.37 ₹12,630.47 Lowest | 76,000 ₹15,200 | 84,812 ₹16,962.4 |
| 1.01 | Precasting and placing in position 125 mm dia Bollards 600 mm high of required shape including providing M.S. Pipe Sleeve 50 mm dia 300 mm long in the Bollard and M.S. Pipes 40 mm dia and 450mm long with 150x150x6mm M.S. plate welded at bottom and embedded 150mm in cement concrete 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources), including necessary excavation of size 250x250x450mm deep for the same in bitumen/concrete pavement at specified spacing. | 8 | Each | 1,213.15 ₹9,705.2 Lowest | 2,000 ₹16,000 | 2,500 ₹20,000 |
| 1.01 | M.S. structural works in roof trusses with tubular sections conforming to IS: 806-1968 & IS: 1161- 1998 cnnected to one another with bracket, gusset cleats as per design, direction of Engineer-in-charge complete including cutting to requisite size, fabrication with necessary metal arc welding conforming to IS: 816- 1969 & IS: 9595 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour reqired for the work including all incidental chages such as electricity charges, labour insurance charges etc. Payment to be made on the basis of calculated weight of structural tubular memebrs as specified in relevent IS code in finished work.
Payment for gusset, bracket, cleat may be made by adding the actual weight of such items with weight of finished structural members. The rates are considered for a height of erection 8 m. / 2nd floor level from the ground. Add 1.5 % extra over the rate for each additional floor or 4m. beyond the initial 8 m. or part thereof
i) For trusses spanning up to 12.00 m | 0.41 | MT | 83,893.65 ₹34,396.4 | 81,000 ₹33,210 Lowest | 1,25,000 ₹51,250 |
Tender Value
₹8.1 Cr
EMD Value
₹16.2 L
Closing Date
11 May 2026, 1:00 pmClosed
Project Director
Office of WBTIDC Ltd. C.S.T.C. Kasba Depot Compound Kolkata-700107
Sheoraphuli Jetty Ghat in Baidyabati Municipality at West Bengal. (Lot-1)
2026_WBTID_1020066_1
IN-WBTIDCL-540184-CW-RFB
Open Tender
Miscellaneous Works
Lump-sum
365 days
Kolkata
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹16.2 L
Office of Transport Directorate
14 Sept 2026
11 Mar 2026
11 May 2026
11 Mar 2026
11 May 2026
30 Mar 2026
23 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1SHEORAPHULI FERRY GHAT WAITING AREA/ NIGHT SHELTER | |||||
| 1.001 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.
(a) Depth of excavation not exceeding 1,500 mm | 55.14 | Cum | 119.27 | ₹6,576.55 |
| 1.002 | (b) Depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but not requiring shoring. | 37.35 | Cum | 192.38 | ₹7,185.39 |
| 1.003 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work)
(a) With earth obtained from excavation of foundation | 61.52 | Cum | 77.54 | ₹4,770.26 |
| 1.004 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codesa) Pakur Variety | 20.92 | Cum | 4,060 | ₹84,935.2 |
| 1.005 | Controlled Cement concrete with well graded stone chips (20 mm nominal size) excluding shuttering and reinforcement with complete design of concrete as per IS : 456 and relevant special publications, submission of job mix formula after preliminary mix design after testing of concrete cubes as per direction of Engineer-in charge. Consumption of cement will not be less than 300 Kg of cement with Super plasticiser per cubic meter of controlled concrete but actual consumption will be determined on the basis of preliminary test and job mix formula. In ground floor and foundation.[using concrete mixture]
(b) M 25 Grade | 1.87 | Cum | 6,214.62 | ₹11,621.34 |
| 1.006 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)
(c) Steel shuttering or 9 to 12 mm thick approved quality ply board shuttering in any concrete work | 8.8 | Sqm | 369 | ₹3,247.2 |
| 1.007 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.
(a) For works in foundation and upto roof of ground floor/upto 4 m
(i) Tor steel/Mild Steel
I. SAIL/ TATA/RINL | 0.2 | MT | 54,915.1 | ₹10,983.02 |
| 1.008 | Precasting and placing in position 125 mm dia Bollards 600 mm high of required shape including providing M.S. Pipe Sleeve 50 mm dia 300 mm long in the Bollard and M.S. Pipes 40 mm dia and 450mm long with 150x150x6mm M.S. plate welded at bottom and embedded 150mm in cement concrete 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources), including necessary excavation of size 250x250x450mm deep for the same in bitumen/concrete pavement at specified spacing. | 8 | Each | 1,054.91 | ₹8,439.28 |
| 1.009 | M.S. structural works in roof trusses with tubular sections conforming to IS: 806-1968 & IS: 1161- 1998 cnnected to one another with bracket, gusset cleats as per design, direction of Engineer-in-charge complete including cutting to requisite size, fabrication with necessary metal arc welding conforming to IS: 816- 1969 & IS: 9595 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour reqired for the work including all incidental chages such as electricity charges, labour insurance charges etc. Payment to be made on the basis of calculated weight of structural tubular memebrs as specified in relevent IS code in finished work.
Payment for gusset, bracket, cleat may be made by adding the actual weight of such items with weight of finished structural members. The rates are considered for a height of erection 8 m. / 2nd floor level from the ground. Add 1.5 % extra over the rate for each additional floor or 4m. beyond the initial 8 m. or part thereof
i) For trusses spanning up to 12.00 m | 0.41 | MT | 72,951 | ₹29,909.91 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 10.27 MB
Annexure.pdf
Additional Documents • 1.17 MB
BOQ_2507065.xls
BOQ • 0.59 MB
Corri2Lot1Sheoraphuli.pdf
PDF • 0.27 MB
Corrigendum1.pdf
PDF • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .