Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹54.8 LAdmitted-Finance | ₹54.8 L | L1 | Admitted-Finance |
| 2 | L2₹59.9 L+₹5.1 L (9.37%)Admitted-Finance | ₹59.9 L+₹5.1 L (9.37%) | L2 | Admitted-Finance |
| 3 | L3₹65.6 L+₹10.8 L (19.7%)Admitted-Finance | ₹65.6 L+₹10.8 L (19.7%) | L3 | Admitted-Finance |
| 4 | L4₹66.8 L+₹12.0 L (22.0%)Admitted-Finance | ₹66.8 L+₹12.0 L (22.0%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Bashir Wani Constructions Private Limited L2 | MATINDER KOUR L1 | M/S Hajra Infra L3 | NAKUL GUPTA L4 |
|---|---|---|---|---|---|---|---|
| 1.00Earthwork in excavation by mechanical means (Hydraulic excavator)/mannual means in foundation trenches or drains ( not exceeding 1.5 m in width or 10 Sq. m on plan), including dressing of sides & remaining of bottoms , lift upto 1.5 m , including getting out the excavated soil and disposal of surplus excavated soil as directed , within a lead of 50 m | |||||||
| 1.10 | All kinds of soil. | 326.25 | cum | 100 ₹32,625 Lowest | 160 ₹52,200 | 170 ₹55,462.5 | 190 ₹61,987.5 |
| 2.00Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | |||||||
| 2.10 | 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 54.38 | cum | 2,000 ₹1,08,760 Lowest | 2,250 ₹1,22,355 | 2,600 ₹1,41,388 | 3,571 ₹1,94,190.98 |
| 2.20 | 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 204.8 | cum | 4,000 ₹8,19,200 | 3,250 ₹6,65,600 | 3,200 ₹6,55,360 Lowest | 4,242 ₹8,68,761.6 |
| 3.00Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : | |||||||
| 3.10 | 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size). | 236.65 | cum | 6,000 ₹14,19,900 | 4,300 ₹10,17,595 Lowest | 6,700 ₹15,85,555 | 5,763 ₹13,63,813.95 |
| 4.00Centering and shuttering including strutting, propping etc. and removal of form for : | |||||||
| 4.10 | Foundations, footings, walls, bases of columns, etc. for mass concrete. | 1,625.28 | sqm | 100 ₹1,62,528 | 90 ₹1,46,275.2 Lowest | 230 ₹3,73,814.4 | 211 ₹3,42,934.08 |
| 4.20 | Columns, Pillars, Piers, Abutments, Posts and Struts. | 359.11 | sqm | 200 ₹71,822 Lowest | 250 ₹89,777.5 | 400 ₹1,43,644 | 535 ₹1,92,123.85 |
Tender Value
₹90.3 L
EMD Value
₹1.8 L
Closing Date
12 May 2026, 4:00 pmClosed
Estates Officer, SKUAST-Jammu
Estates Division, SKUAST-J, Chatha
Reconstruction of boundary wall by way of providing RCC Columns Brick work and allied works (Rear portion) at FVSc and AH, R.S. Pura
2026_SKUST_309186_7
AU/Estates/2026-27/04 dated 27-04-2026
Open Tender
Civil Works
Item Rate
120 days
FVSc and AH, R.S. Pura
Please refer tender documents
4 documents required · 4 mandatory
₹2,000
Assistant Comptroller (Estates), SKUAST-Jammu
₹1.8 L
13 May 2026
1 May 2026
13 May 2026
1 May 2026
12 May 2026
1 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earthwork in excavation by mechanical means (Hydraulic excavator)/mannual means in foundation trenches or drains ( not exceeding 1.5 m in width or 10 Sq. m on plan), including dressing of sides & remaining of bottoms , lift upto 1.5 m , including getting out the excavated soil and disposal of surplus excavated soil as directed , within a lead of 50 m | |||||
| 1.1 | All kinds of soil. | 326.25 | cum | - | - |
| 2Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | |||||
| 2.1 | 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 54.38 | cum | - | - |
| 2.2 | 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 204.8 | cum | - | - |
| 3Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : | |||||
| 3.1 | 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size). | 236.65 | cum | - | - |
| 4Centering and shuttering including strutting, propping etc. and removal of form for : | |||||
| 4.1 | Foundations, footings, walls, bases of columns, etc. for mass concrete. | 1,625.28 | sqm | - | - |
| 4.2 | Columns, Pillars, Piers, Abutments, Posts and Struts. | 359.11 | sqm | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
TermsandConditionsoftheContract.pdf
Tender Documents • 0.22 MB
BOQ_1001076.xls
BOQ • 4.49 MB
Scheduleofcredit.pdf
Other Document • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .