| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 CrAdmitted-Finance 19B CHIDAMBARANATHAPURAM DEVAKOTTAI SIVAGANGAI DISTRICT | PUDUKKOTTAI | TAMIL NADU | 621308 | ₹1.9 Cr | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | S S AND CO L1 |
|---|---|---|---|---|
| 1.00 | Labour charges for Conducting check survey, carring theodolite instrument, measuring span length, in the already fixed route, Fixing of tower location and pit marking, jungle clearance, tree cutting etc., complete. | 4 | Loc. | 5,000 ₹20,000 Lowest |
| 2.00 | Labour charges for clearing heavy jungles, labours, lead, lift, etc., complete and as directed by the Department Engineer at site. | 12,000 | M2 | 5 ₹60,000 Lowest |
| 3.00 | Earth work excavation in all soils including cost of all materials labour lead lift etc. complete as directed by the Engineer at site. In Hard stiff clay, stiff black cotton, hard red earth, shales and murram, stoney earth and earth mixed with small size boulders SS 20 B | 561 | m3 | 200 ₹1,12,200 Lowest |
| 4.00 | Earth work excavation in all soils including cost of all materials labour lead lift etc. complete as directed by the Engineer at site. In soft disintegrated rock not requiring blasting | 33 | m3 | 300 ₹9,900 Lowest |
| 5.00 | Earth work excavation in all soils including cost of all materials labour lead lift etc. complete as directed by the Engineer at site. In Medium rock and dense medium rock not requiring blasting | 33 | m3 | 1,200 ₹39,600 Lowest |
| 6.00 | Earth work excavation in all soils including cost of all materials labour lead lift etc. complete as directed by the Engineer at site. Removal of hard rock by wedging and chiselling and trimming to proper shape. | 33 | m3 | 2,400 ₹79,200 Lowest |
| 7.00 | Providing shoring and shuttering including cost of form work all metrials labour charges lead, lift etc., complete | 400 | M2 | 500 ₹2,00,000 Lowest |
| 8.00 | Transporting and asseming of template, stub & cleat and shifting template from location to location and re-assembling including cost of lead, lift, etc., complete. (Template with all accessories will be under contractor) | 4 | MT | 40,000 ₹1,60,000 Lowest |
| 9.00 | PCC 1:2:4, using 20 mm HBG metal without form work for padding and footing concrete including cost of all materials, curing, labour, lead and lift. etc., complete. | 325 | m3 | 10,000 ₹32,50,000 Lowest |
| 10.00 | PCC 1:2:4, using 20 mm HBG metal withform work for foundation concrete including cost of all materials, curing, labour, lead and lift. etc., complete. | 13 | m3 | 12,000 ₹1,56,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹1.0 L
Closing Date
21 Nov 2022, 2:30 pmClosed
CE/TP and SO/CHN
Guindy 230kV GIS SS campus.
Siruseri Nallambakkam Toff at Mambakkam between location 154 and 159 and removal of existing EHT lines in the premises of NTRO at Mambakkam
2022_EB_262355_1
TP1-115/2022-23
Open Tender
Civil Works - Others
Works
120 days
Mambakkam (NTRO)
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.0 L
Yes
17 Dec 2022
8 Nov 2022
22 Nov 2022
8 Nov 2022
21 Nov 2022
8 Nov 2022
Amount
Labour charges for Conducting check survey, carring theodolite instrument, measuring span length, in the already fixed route, Fixing of tower location and pit marking, jungle clearance, tree cutting etc., complete.
Labour charges for clearing heavy jungles, labours, lead, lift, etc., complete and as directed by the Department Engineer at site.
Earth work excavation in all soils including cost of all materials labour lead lift etc. complete as directed by the Engineer at site. In Hard stiff clay, stiff black cotton, hard red earth, shales and murram, stoney earth and earth mixed with small size boulders SS 20 B
Earth work excavation in all soils including cost of all materials labour lead lift etc. complete as directed by the Engineer at site. In soft disintegrated rock not requiring blasting
Earth work excavation in all soils including cost of all materials labour lead lift etc. complete as directed by the Engineer at site. In Medium rock and dense medium rock not requiring blasting
Earth work excavation in all soils including cost of all materials labour lead lift etc. complete as directed by the Engineer at site. Removal of hard rock by wedging and chiselling and trimming to proper shape.
Providing shoring and shuttering including cost of form work all metrials labour charges lead, lift etc., complete
Transporting and asseming of template, stub & cleat and shifting template from location to location and re-assembling including cost of lead, lift, etc., complete. (Template with all accessories will be under contractor)
PCC 1:2:4, using 20 mm HBG metal without form work for padding and footing concrete including cost of all materials, curing, labour, lead and lift. etc., complete.
PCC 1:2:4, using 20 mm HBG metal withform work for foundation concrete including cost of all materials, curing, labour, lead and lift. etc., complete.
Bailing out of water by pump set during the concrete including cost of diesel pump set 3/5HP motor including cost of al materials, labour, lead, lift, etc., complete and as directed by the Department Engineer at site.
Back filling of pits with excavated earth inclduing watering and consolidation in 150mm thick and spread balance earth around the tower location, lead, lift, etc., compelte as directed by the Department Engineer at site.
Labour charges for removal of surplus earth away from site including cost of all lead, lift, etc., compelte as directed by the Department Engineer at site.
Labour charges for erection of towers and tower extensions including sorting out of tower parts, tightening, punching of bolts and nuts and rectification of defects if any during erection, one coat of Zinc rich primer, 2 coats of Zinc rich enamel paint, cost of all materials, labour, lead, lift etc., complete.
Welding of exposed faces of bolts and nuts 1cm each at two places opposite to each other after tightening, punching to avoid theft of tower parts including cost of welding rods, hire charges for generator including welding rods and painting with good quality of zinc paint on the welded portion etc., complete.
Labour charges for Transporting and hoisting of 7 Units of 90 KN Anitfog Disc Insulators including cost of all tension fittings, all materials, labour, lead, lift, etc., complete under
Labour charges for Transporting and hoisting of 8 Units of 120 KN Anitfog Disc Insulators including cost of all tension fittings, all materials, labour, lead, lift, etc., complete under
Labour charges for Paying out, Rough sagging, Tensioning of 6 Nos. Panther conductor with fittings including transport, sorting out of conductor according to drum schedule and loading and unloading at site, providing trussels and rough sagging, tensioning, clipping, labour, providing vibration dampers including giving jumper connections, cost of T&P, lead and lift etc., complete. Under LC condition
Labour charges for Paying out, Rough sagging, Tensioning of 1 No. GI earthwire7/3.55mm including transport, sorting out of conductor according to drum schedule and loading and unloading at site, providing trussels and rough sagging, tensioning, clipping, labour, providing vibration dampers including giving jumper connections, cost of T&P, lead and lift etc., complete
Providing temporary guys with steel wires and turn buckles including necessary earthwork excavation for fixing RSJ/rail bit or concrete blocks for anchorage, dismantling after completion of stringing works including cost of all materials, labour, lead, lift, etc., complete .
Labour charges for arranging and availing shutdown, lowering HT/LT lines during stringing works and restringing the same to original position including all labour charges, lead, lift, etc., complete in all respects.
Providing pipe type earthing including cost of 40 mm GI earth pipe B class of length 3 m,earth strip, cutting of earth work to the required length and connecting to the earth pipe and stub including cost of all materials, lead, lift etc., complete.
PCC 1:2:4 using 12 to 20mm HBG metal for muffing and coping including cost of all materials labour, form work including all lead lift etc., complete.
Providing plastering C:M 1 : 3 including cost of all materials labour lead, lift, etc., complete in all respect.
Cleaning the tower legs and Painting tower leg using best quality anti corrosive paint-black color-1m above coping concrete including bracings including cost of paint labour, charges, lead and lift etc. complete.
Supply, Transportation and installation of following tower accessories including cost of all T&P, labour, lead, lift etc., complete, as directed. Danger Plate
Supply, Transportation and installation of following tower accessories including cost of all T&P, labour, lead, lift etc., complete, as directed. Number plate
Transportation and installation of following tower accessories including cost of all T&P, labour, lead, lift etc., complete, as directed. Phase plate (set of Three)
Transportation and installation of following tower accessories including cost of all T&P, labour, lead, lift etc., complete, as directed. Name plate (set of Two)
Labour charges for removal of small palmyra/cocunut stumps including cost of all materials, labour, lead, lift, etc. complete
Labour charges for removal of large palmyra/cocunut stumps including cost of all materials, labour, lead, lift, etc. complete
Labour charges for dismantling of existing GI towers and moving away from site in as is where is condition including all labour charges, lead, lift etc., complete.
Labour charges for dismantling of existing 3nos. Panther conductor, moving away from site in as is where is condition including all labour charges, lead, lift etc., complete.
Labour charges for dismantling of existing 1No.GI earth wire moving away from site in as is where is condition including all labour charges, lead, lift etc., complete.
Labour charges for dismantling of 7units of 90 KN disc suspension insulators, moving away from site in as is where is conditionincluding all labour charges, lead, lift etc., complete.
Labour charges for dismantling of 8units of 120 KN disc tension insulators, moving away from site in as is where is condition including all labour charges, lead, lift etc., complete.
Less credit - Tower part Scrap
Supplying, Fabricating, Galvanizing, transporting of MS towers parts including stub and cleat , extension parts, cost of all materials labour lead lift etc. complete for the 110kV towers LT steel tower parts
Supply of Hot dip galvanised bolts and nuts as per IS conforming to latest issue and as detailed in the specification (Various size)
Supply for transmission line hardwares as per IS conforming to latest issue suitable for ACSR Panther conductor Single suspension fittings
Supply for transmission line hardwares as per IS conforming to latest issue suitable for ACSR Panther conductor Single Tension fittings
Supply for transmission line hardwares as per IS conforming to latest issue suitable for ACSR Zebra conductor Vibration Damper for ACSR Panther
Supply for transmission line hardwares as per IS conforming to latest issue suitable Aluminium Earth Bond
Supply for transmission line hardwares as per IS conforming to latest issue suitable Single suspension fittings for earthwire
Supply for transmission line hardwares as per IS conforming to latest issue suitable Single Tension fittings for earthwire
Supply for transmission line hardwares as per IS conforming to latest issue suitable Midspan compression joint for Panther
Supply for transmission line hardwares as per IS conforming to latest issue suitable Repair sleeves for Panther
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .