Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.0 CrAccepted-AOC 232 RANA NAGAR BHAVANI ERODE DISTRICT 638 302 | 638302 | ₹7.0 Cr Quoted ₹7.3 Cr | L1 | Accepted-AOC Lowest Rate Quoted |
| 2 | L2₹7.5 Cr+₹15.5 L (2.11%)Rejected-Finance SOLAKKALIPALAYAM PERIYA VATTAM POST KODUMUDI VIA ERODE | ₹7.5 Cr+₹15.5 L (2.11%) | L2 | Rejected-Finance Highest Rate Quoted |
| 3 | Rejected-Technical | - | - | Rejected-Technical Pre qualification documents not satisfied |
Tender Value
₹7 Cr
EMD Value
₹3.6 L
Closing Date
1 Jul 2020, 3:00 pmClosed
Superintending Engineer Coimbatore
Superintending Engineer Office Highways Department Construction and Maintenance Coimbatore 641018
Widening and Improvements Improvements to riding quality CD Works Retaining wall and Up Keeping for a period of 60 months to Government Highways roads in Gobi H CM Sub Division Jurisdiction Package No 1
2020_HWAY_165330_1
g1
Open Tender
Civil Works - Highways
Percentage
270 days
GOBI
Refer pre qualification document volume I
12 documents required · 12 mandatory
₹0
₹3.6 L
5 Dec 2020
29 May 2020
3 Jul 2020
1 Jun 2020
1 Jul 2020
8 Jun 2020
3 Jun 2020 - 5 Jun 2020
eProcurement System Government of Tamil Nadu Created By: Padmanabhan Thirumalaisamy Created Date/Time: 09-Jul-2020 11:15 AM Tender Title: CRIDP - 2020-2021 Tender ID: 2020_HWAY_165330_1
Tender Inviting Authority: Superintending Engineer Highways Construction and Maintenance Coimbatore Circle
Widening and Improvements, Improvements to riding quality, CD Works, Retaining wall and Up Keeping for a period of 60 months to Government Highways roads in Gobi (H) C&M Sub Division Jurisdiction – Package No. 1 A) Widening from Single lane to Intermediate lane and Improvements of Pudukkaraipudur- Sanarpalayam road at km 1/8-3/6 including widening of culvert at km 1/10 & Construction of Retaining wall at km 1/10 including upkeeping for a period of 60 months B) Widening from Single lane to Intermediate lane and Improvements of Pudukkaraipudur- Sanarpalayam road at km 3/6-5/4 including widening of culvert at km 5/2 & 5/4 Construction of Retaining wall at km 3/8 & 5/2 including upkeeping for a period of 60 months C) Widening from Single lane to Intermediate lane and Improvements of Pudukkaraipudur- Sanarpalayam road at km 5/4-7/6 including upkeeping for a period of 60 months D) Widening from Single lane to Intermediate lane and Improvements of Perundurai - Siruvalur road to Siruvalur Kavandapady road at km 2/4-3/4 including reconstruction of culvert at km 3/2 Construction of Retaining wall at km 3/2 & 3/4 including upkeeping for a period of 60 months E) Widening from Single lane to Intermediate lane and Improvements of Perundurai - Siruvalur road to Siruvalur Kavandapady road at km 3/4 -4/6, including upkeeping for a period of 60 months F) Improvements to Riding Quality at km 5/0 - 5/6 of Pudukkaraipudur-Vellankoil road including upkeeping for a period of 60 months
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 SOLAIAPPAN CONSTRUCTIONS 62480348.598 4.790 73329937.000 Seven Crore Thirty Three Lakh Twenty Nine Thousand Nine Hundred and Thirty Seven
2.00 K T R AND CO 62480348.598 7.000 74876450.000 Seven Crore Fourty Eight Lakh Seventy Six Thousand Four Hundred and Fifty
Lowest Amount Quoted BY: SOLAIAPPAN CONSTRUCTIONS(73329937.000)
BOQ Summary Details Tender Title: CRIDP - 2020-2021 Tender ID: 2020_HWAY_165330_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 SOLAIAPPAN CONSTRUCTIONS 73329937.000 L1
2 K T R AND CO 74876450.000 L2
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .