| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.1 LAccepted-AOC | L1 | Accepted-AOC Lowest Amount Quoted | |
| 2 | L2₹6.5 L+₹41,473.40 (6.83%)Rejected-AOC | L2 | Rejected-AOC Highest Amount Quoted | |
| 3 | L3₹6.6 L+₹53,661.88 (8.83%)Rejected-AOC | L3 | Rejected-AOC Highest Amount Quoted | |
| 4 | L4₹7.3 L+₹1.2 L (19.6%)Rejected-AOC 5 ESWARAN KOVIL STREET PSG NAGAR IN AVALPOONDURAI TOWN PANCHAYAT ERODE DISTRICT | ERODE | TAMIL NADU | 638001 | L4 | Rejected-AOC Highest Amount Quoted | |
| 5 | L5₹7.3 L+₹1.2 L (20.2%)Rejected-AOC | L5 | Rejected-AOC Highest Amount Quoted |
| Sl No | Description | Qty | Unit | CDR CONSTRUCTION L3 | Sri Nalli Builders L5 | A.NAGULAN CONTRACTOR L4 | MR Enterprise L1 | GS CONSTRUCTION L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling Plain Cement Concrete on Pavement and removed away from site inluding cost and Conveyance etc. | 53 | M3 | 267.6 ₹14,182.8 | 388 ₹20,564 | 380 ₹20,140 | 12 ₹636 Lowest | 344 ₹18,232 |
| 2.00 | Plain Cement Concrete of mix 1 : 4 : 8 (One part Cement, four part sand & eight part of aggregates) using 40mm gauge hard broken metal from approved quarry including all cost, conveyance of materials to site with proper mixing, compacting, finishing and curing etc., complete as per standard specification. TNDSS NO: 28 V, VI (S2) V,VI (S5A) VII | 67 | M3 | 4,081.33 ₹2,73,449.11 | 4,477 ₹2,99,959 | 4,460 ₹2,98,820 | 4,099 ₹2,74,633 | 3,979 ₹2,66,593 Lowest |
| 3.00 | Supplying and errecting centering for Sides and Soffits including necessary supports and strutting upto3.29mt height for plane surfaces as detailed below in all floors with all cross bracings using mild steel sheets of size 90mm x60mm and 10BG stiffened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia supported at not more than 75cm centre to centre etc complete Complying with standard Specification without Strutting.( TNSS NO or NBC No 30(S) 86 86 A V, VI(S3)VII | 46 | M3 | 367.91 ₹16,923.86 | 403 ₹18,538 | 395 ₹18,170 | 269 ₹12,374 Lowest | 358 ₹16,468 |
| 4.00 | Plain Cement Concrete 1:2:4 (one cement, two sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. | 67 | M3 | 5,241.33 ₹3,51,169.11 | 5,749 ₹3,85,183 | 5,730 ₹3,83,910 | 4,678 ₹3,13,426 Lowest | 5,110.2 ₹3,42,383.4 |
| 5.00 | Supply and Fixing of 15mm thick Bitumen Pad including cost and conveyance of all materials to site and all labour charges etc., complete as per stand specification | 14 | M2 | 388 ₹5,432 | 426 ₹5,964 | 415 ₹5,810 | 459 ₹6,426 | 378 ₹5,292 Lowest |
Tender Value
₹10 L
EMD Value
₹20,000
Closing Date
12 Aug 2025, 3:00 pmClosed
Executive Officer
Sivagiri Town Panchayat
Erode DT Sivagiritp 15th Finance Commission Untied Grand 2025-2026 Providing Cement Concrete Pavement at Ward No.10 Gudalur Mariyamman Temple West Street and Police Station Backside Street and Thiru.V.Ka Street Murugan Rice Mill East Side in Sivagiri
2025_DTP_586914_1
234/2025
Open Tender
Civil Works - Roads
Works
90 days
Sivagiri Town Panchayat
As per norms
2 documents required · 2 mandatory
₹0
₹20,000
30 Aug 2025
30 Jul 2025
13 Aug 2025
30 Jul 2025
12 Aug 2025
30 Jul 2025
30 Jul 2025 - 12 Aug 2025
Amount
Dismantling Plain Cement Concrete on Pavement and removed away from site inluding cost and Conveyance etc.
Plain Cement Concrete of mix 1 : 4 : 8 (One part Cement, four part sand & eight part of aggregates) using 40mm gauge hard broken metal from approved quarry including all cost, conveyance of materials to site with proper mixing, compacting, finishing and curing etc., complete as per standard specification. TNDSS NO: 28 V, VI (S2) V,VI (S5A) VII
Supplying and errecting centering for Sides and Soffits including necessary supports and strutting upto3.29mt height for plane surfaces as detailed below in all floors with all cross bracings using mild steel sheets of size 90mm x60mm and 10BG stiffened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia supported at not more than 75cm centre to centre etc complete Complying with standard Specification without Strutting.( TNSS NO or NBC No 30(S) 86 86 A V, VI(S3)VII
Plain Cement Concrete 1:2:4 (one cement, two sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
Supply and Fixing of 15mm thick Bitumen Pad including cost and conveyance of all materials to site and all labour charges etc., complete as per stand specification
GS CONSTRUCTION (BID ID -1426331)
CDR CONSTRUCTION (BID ID -1426325)
A.NAGULAN CONTRACTOR (BID ID -1425414)
Sri Nalli Builders (BID ID -1426696)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .