Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.3 LAccepted-Finance | 1 | Accepted-Finance Accepted | |
| 2 | 1₹1.3 LRejected-Finance | 1 | Rejected-Finance Rejected |
Tender Value
₹1.4 L
EMD Value
₹1,420
Closing Date
7 Jun 2023, 3:00 pmClosed
BDO(VP)
Block Development Office, Sattur
Renovation of Girls Toilet in PU Middle School at chatrapatti Village and Panchayat
2023_RDTN_320801_2
A2/3594/2022
Open Tender
Civil Works
Works
Sattur
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹1,420
Yes
10 Jun 2023
30 May 2023
7 Jun 2023
30 May 2023
7 Jun 2023
30 May 2023
Amount
Renovation of Girls Toilet
Chipping of Concrete and roughening surface
Dismantling of Brick work including all cost of labour charges etc complete
Supplying and Erecting centering for sides and soffits including supports and strutting up to 3.30 m height with all cross bracing for plane surfaces as detailed below, using mild steel sheets of 90 X 60 cm 10 gauge stiffened with MS angle of 25 x 25 x 3m
Supplying and fabricating RTS / TMT STEEL rods including cutting, bending hooks, cranking, fabricating,assembling and laying in exact position,typing with softsteel wire 16 gauge ,etc., complete conforming to BIS std.
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete.
Brickwork in cement mortar 1:5 mix using country bricks of size 8 ¾” x 4 ¼" x 2 ¾” including cost and conveyance of all materials to site etc., complete.
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc., complete.
Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete
Dadooing of walls with glazed tiles of size 15 cm x15cmx6mm laid in CM 1:2, 10mm thick & pointing with white cement using 0.4kg/cm2 including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete
White washing two coats using shell lime including cost and conveyance of all materials to site and all labour charges etc complete.
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete.
Plastic Emulsion paint using best quality and approved cemet paint over the one coat cement priemer including all cost and conveyance etc., complete.
Painting two coats over old iron works using ready mixed enamel paint including all cost and conveyance etc., complete.
Construction of Ramp With Hand rail arrangemnt
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete
Refilling the basement with excavated earth other than sand complying the standard specification
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc., complete.
Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete
Plastic Emulsion paint using best quality and approved cemet paint over the one coat cement priemer including all cost and conveyance etc., complete.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
S SIVASANKARAN
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .