| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 CrAccepted-Finance | ₹2.0 Cr | L1 | Accepted-Finance Found as L1 |
| 2 | L2₹2.5 Cr+₹55.7 L (28.2%)Rejected-Finance 3RD FLOOR LAXMIPRIYA TWIN CITY TOWERS PO PAHAL NH 16 BHUBANESWAR DIST KHORDHA ODISHA 751032 | BHUBANESWAR | KHORDHA | ODISHA | 751032 | ₹2.5 Cr+₹55.7 L (28.2%) | L2 | Rejected-Finance Not Found as L1 |
| 3 | L2₹2.5 Cr+₹55.7 L (28.2%)Rejected-Finance AT PO PAIKMAL PS PAIKMAL DIST BARGARH PIN 768039 | BARGARH | BARGARH | ODISHA | 768039 | ₹2.5 Cr+₹55.7 L (28.2%) | L2 | Rejected-Finance Not Found as L1 |
| 4 | L2₹2.5 Cr+₹55.7 L (28.2%)Rejected-Finance | ₹2.5 Cr+₹55.7 L (28.2%) | L2 | Rejected-Finance Not Found as L1 |
| 5 | L2₹2.5 Cr+₹55.7 L (28.2%)Rejected-Finance AT BELTIKIRI SADAR DHENKANAL | ₹2.5 Cr+₹55.7 L (28.2%) | L2 | Rejected-Finance Not Found as L1 |
Tender Value
₹2.5 Cr
EMD Value
₹2.5 L
Closing Date
7 Jul 2026, 5:30 pmClosed
Additional Chief Engineer,Angul Irrigation Circle,
Office of the Additional Chief Engineer,Angul Irrigation Circle,Matiasahi,Angul,759143
Improvement to Right Service Bank Road of Sapua Link Channel from RD 2.100 Km to RD 5.330 Km of Sapua Badjore Irrigation Project.
2026_CEBBS_132408_1
ACEAIC- 02 /2026-27
Open Tender
Civil Works - Roads
Percentage
Rasol
Please refer Tender documents.
6 documents required · 6 mandatory
₹10,000
₹2.5 L
Yes
24 Aug 2026
23 Jun 2026
8 Jul 2026
23 Jun 2026
7 Jul 2026
23 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing grass and removal of rubbish upto a distance of 50m outside the periphery of the area with all cost of incidental charges , all labour, T&P and cess complete as per drawing, specification,direction of the Engineer-in-charge. | 10,336 | One Sqm | 2.9 | ₹29,974.4 |
| - | Construction of granular Sub-base by providing close graded Granular sub-base Grading-III material as per table 400-1, spreading in unifrom layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC , and compacting with vibratory roller to achieve the desired density complete as per Clause 401 of MoRT&H Specifications for Road & Bridge works(4th. Revision) including cost, conveyance, royalty, taxes of all materials, hire and running charges of machinaries, cost of all labour, T&P with all cost of incidental charges and cess etc. complete as per approved specification and direction of the Engineer -in- Charge. | 759.38 | One Cum | 2,202.5 | ₹16,72,534.45 |
| - | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per Clause 406 of MoRT&H Specifications for road & Bridge works(4th. Revision) including cost, conveyance, royalty, taxes of all materials, hire and running charges of machinaries, cost of all labour, T&P with all cost of incidental charges and cess etc. complete as per approved specification and direction of the Engineer -in- Charge. | 2,051.76 | One Cum | 2,768.9 | ₹56,81,118.26 |
| - | Providing & applying Primer coat with bitumen emulsion on prepared surface of granular base including clearing of road surface and spraying primer @ 0.60Kg/sqm using mechanical means as per Clause 502 of MoRT&H Specifications for road & Bridge works (4th. Revision) including cost, conveyance, taxes of all materials, hire and running charges of machinaries, cost of all labour, T&P with all cost of incidental charges and cess etc. complete as per approved specification and direction of the Engineer -in- Charge. | 12,112.5 | One Sqm | 53 | ₹6,41,962.5 |
| - | Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per Clause 503 of MoRT&H Specifications for road & Bridge works(4th. Revision) including cost, conveyance, taxes of all materials, hire and running charges of machinaries, cost of all labour, T&P with all cost of incidental charges and cess etc. complete as per approved specification and direction of the Engineer -in- Charge. | 12,112.5 | One Sqm | 26.3 | ₹3,18,558.75 |
| - | Providing and laying bituminous macadam with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder of 60/70 penetration grade of bitumen, transported to site, laid over a previously prepaired surface with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per Clause 504 of MoRT&H Specifications for road & Bridge works(4th. Revision) including cost, conveyance, royalty, taxes of all materials, hire and running charges of machinaries, cost of all labour, T&P with all cost of incidental charges and cess etc. complete as per approved specification and direction of the Engineer -in- Charge. | 605.63 | One Cum | 10,354 | ₹62,70,693.02 |
| - | Providing and laying semi dense bituminous concrete Grade-II with batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder of 60/70 penitration grade of bitumen, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compactionas per Clause 508 of MoRT&H Specifications for road & Bridge works(4th. Revision) including cost, conveyance, royalty, taxes of all materials, hire and running charges of machinaries, cost of all labour, T&P with all cost of incidental charges and cess etc. complete as per approved specification and direction of the Engineer -in- Charge. | 302.81 | One Cum | 13,838.3 | ₹41,90,375.62 |
| - | Providing good quality moorum and spreading in uniform thickness on both side flanks of road surface including watering and rolling with PRR, hire & running charges of machineries including cost, carriage, royalty, taxes of all materials, cost of all labour, T&P with all cost of incidental charges and cess etc. complete as per drawing, specification and direction of the Engineer-in-charge. | 1,017.45 | One Cum | 1,028.2 | ₹10,46,142.09 |
| - | Excavation, loading, unloading and carriage by mechanical means of all kinds of soil including stoney earth, gravel and moorum etc interspread with boulders upto 1/2 cum size with all lifts and delifts including trimming of slopes and bed to design section and depositing the excavated materials away from work site as per the specification and as directed by the Engineer-in-charge within an initial lead of 1km from the place of excavation complete including cost, conveyance, taxes of all materials, hire and running charges of machinaries, cost of all labour, T&P with all cost of incidental charges and cess etc. complete as per approved specification and direction of the Engineer -in- Charge. | 82.72 | One Cum | 65.5 | ₹5,418.16 |
| - | Filling foundation and plinth with clean coarse sand, well watered and rammed including cost, conveyance, royalty, taxes of all materials, hire and running charges of machineries, cost of all labour, T&P with all cost of incidental charges and cess etc. complete as per approved specification and direction of the Engineer -in- Charge. | 20.68 | One Cum | 1,120.1 | ₹23,163.67 |
stage.html
html • 0.36 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.60 MB
5TECHBIDSAPUA.pdf
Tender Documents • 2.33 MB
BOQ_597146.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .