Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.3 LAccepted-AOC NEAR GOVT MIDDLE SCHOOL VILLAGE KHERI SANWAL TEHSIL AND DISTRICT CHARKHI DADRI | CHARKHI DADRI | CHARKHI DADRI | HARYANA | L1 | Accepted-AOC L1 | |
| 2 | L2₹8.6 L+₹27,288.36 (3.29%)Rejected-AOC H NO 399 H NO 399 VPO SAIMPAL 128 124113 | ROHTAK | HARYANA | 124113 | L2 | Rejected-AOC L2 |
Tender Value
₹7.1 L
EMD Value
₹14,160
Closing Date
24 May 2021, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, Bond W/S Division Bhiwani
Executive Engineer, Bond W/S Division Bhiwani
Construction of water course out let RD 5300 L Dadri Feeder Ext
2021_HRY_171956_1
2905-2923/NIT dated 17/05/2021
Open Tender
Civil Works
Works
60 days
Bhiwani
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
₹14,160
Yes
4 Jun 2021
17 May 2021
25 May 2021
17 May 2021
24 May 2021
17 May 2021
90 days
Amount
Laying of 100 Micron polythene under bed lining as per drawing design and as per approved designed section and PWD specifiction. (As per CADA)
Supply of 100 Micron polythene under bed lining as per drawing design and as per approved designed section and PWD specifiction. (As per CADA)
First class brick work laid in cement sand mortar 1:5 in foundation and plinth (Bed Lining) (HSR Item no 11.3) @ 407.60+650%=3057.00 x 0.0762= 232.94
First class Brick work laid in cement sand mortar 1:5 in foundation & plinth for side lining including Nakka and Culvert (HSR Item no 11.3) @ 407.60+650%= 3057.00
Plastering on walls 10 mm thick cement plaster 1:4 (Laying Fillet gola, culvert, silt Trap and Nakkas)(HSR Item no 15.5 derived) @ 12.70+600%= 88.90 x 10/12 = 74.08
Kassi work undressed involving an average horizontal throw upto 2 meters and average vertical lift upto 1.5 meter (Removal of existing banks)(HSR Item no 6.2(a) ) @ 415.50+425%= 2181.37
C.C 1:4:8 with brick blast 40 mm nominal size in foundation & plinth (For nakka, culvert etc.) (HSR Item no 10.36)@385.25+450%=2118.87
Providing Brick Masonry 1:4 in arches including cost of Shutering upto 1.5 mtr span HSR item No. 11.4 @ 424.60+650% = 3184.50
Extra for brick work in arches including cost of shuttering upto 1.50 meter span (HSR Item no 11.44 (a)@ 41.30+650%= 309.75
Supply of R.C.C Pannels size 30"x 30"at site of work as per approved drawing design and specification. (as Per CADA)
Fixing of R.C.C Pannels size 30" x30"at site of work as per approved drawing design and specification. (as Per CADA)
Supplyof R.C.C Lid size 24" at site of work as per approved drawing and specifications (as Per CADA)
Earth work excavation in ordinary soil exclusive of compensation of earth- Earth work undressed with a combine lead upto 15 meter including breaking of clods and dressing of earth work new work or remodeling work (Earth work for filling of banks of water courses)(HSR Item no (6.2 b and 6.3(i))@586.60+45.90+425%
Dressing of bed prepration of sub grade for lining.(As per Itom No. 2) (HSR Item no 19.1)@ 13.37
THE KUMAR COOPERATIVE L AND C SOCIETY VPO SAIMPAL
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .