| 1 | L1₹5.5 CrAdmitted-Finance | ₹5.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹5.5 CrAdmitted-Finance | ₹5.5 Cr | L2 | Admitted-Finance |
| 3 | L3₹6.0 CrAdmitted-Finance | ₹6.0 Cr | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Alliance Transcon Pvt. Ltd. L3 | JK Electric Engineers Pvt. Ltd. L2 | Vinay Construction Power Private Limited L1 |
|---|---|---|---|---|---|---|
| 1.00Dismantling works | ||||||
| 1.01 | Destringing of ACSR Panther conductor with accessories from damaged section | 3 | KM | 1,50,000 ₹4.5 L | 2,70,000 ₹8.1 L | 15,000 ₹45,000 |
| 1.02 | Dismantling of collapsed/buckled tower material from damaged section | 76 | MT | 12,000 ₹9.1 L | 20,000 ₹15.2 L | 1,500 ₹1.1 L |
| 1.03 | Loading of dismantled line and tower material,carriage of material upto divisional store,unloading and stacking of material in store | 1 | JOB | 2,50,000 ₹2.5 L | 6,00,000 ₹6 L | 1,55,000 ₹1.6 L |
| 2.00 | Land compensation for three number location | 24 | Marlas | - | - | - |
| 3.00Civil works | ||||||
| 3.01 | Line route, detail survey including check survey, | 3 | KM | 50,000 ₹1.5 L | 2,70,000 ₹8.1 L | 46,000 ₹1.4 L |
| 4.00Casting of Foundations including , concreting , excavation , backfilling, Shuttetring,benching, dewatering stub setting ,supply and installation of earthing device , reinforcement etc. | ||||||
| 4.01 | Small angle (2-15 degree) towers FS type | 3 | Nos. | 4,50,000 ₹13.5 L | 3,42,000 ₹10.3 L | 9,45,000 ₹28.4 L |
| 4.02 | Large angle (30-60 degree)towers FS type | 2 | Nos. | 9,00,000 ₹18 L | 6,15,000 ₹12.3 L | 14,00,000 ₹28 L |
Updated dates
Tender Value
₹6.6 Cr
EMD Value
₹13.2 L
Closing Date
2 Feb 2026, 2:30 pmClosed
Executive Engineer, TLMD-II, JKPTCL, Jammu
Executive Engineer, TLMD-II, JKPTCL, Jammu
RECONSTRUCTION OF SECTION OF 132KV D/C CANAL-MIRAN SAHIB TRANSMISSION LINE THAT WAS DAMAGED DURING FLASH FLOODS IN NIKKI TAWI LOCATION NOS 24,25,26,27,28,29 AND 30
2026_PDD_299863_1
TLMD-II/J/12 of 2025-26 Dated 02/01/2026
Open Tender
Electrical Works
150 days
JAMMU
AS PER NIT AND SBD
3 documents required · 3 mandatory
₹11,800
Executive Engineer, TLMD-II, JKPTCL, Jammu
₹13.2 L
office of the Superintending Engineer, OM, Cr-I, J
10 Feb 2026
3 Jan 2026
3 Feb 2026
3 Jan 2026
2 Feb 2026
3 Jan 2026
9 Jan 2026
Dismantling works
Destringing of ACSR Panther conductor with accessories from damaged section
Dismantling of collapsed/buckled tower material from damaged section
Loading of dismantled line and tower material,carriage of material upto divisional store,unloading and stacking of material in store
Land compensation for three number location
Civil works
Line route, detail survey including check survey,
Casting of Foundations including , concreting , excavation , backfilling, Shuttetring,benching, dewatering stub setting ,supply and installation of earthing device , reinforcement etc.
Small angle (2-15 degree) towers FS type
Large angle (30-60 degree)towers FS type
Pile foundation approx 40 mtr deep
Providing of protection to the Tower foundations
Crate of galvanised wire neeting & mesh packed with boulders for pile foundations
Tower footings with M-15 concrete for other foundations
Electrical works Engineering, Design, supply of Tower Material and accessories
Supply of (B+0) type of towers and stubs
Supply of (B+9) type of towers and stubs
Supply of (D+9) type of tower and stubs
Supply of Nuts & Bolts for tower parts and stubs
Danger Plate
Number Plate
Phase Plate
Circuit Plate
Anti Climbing devices
Bird Guards
Earthing material Counter piose type
Erection Of various type of tower including stub setting, leg extension complete with nuts and Bolts including tack welding and fixing of Tower accessories.
Stub setting of tower foundation
Loading & unloading of tower material,stubs and Nuts & bolts
Carriage of tower material from road site to errection site average lead upto 1.0 kms
Errection of super structure
Welding of tower bolts first two stories
To and fro carriage of welding equipment
Carriage and T&P articles average upto 1.0kms avg.
Earthing of Towers Counter poise
Earth work for Counter poise earthing
Back filling of earth
Cost of good earth
Fixing of phase plate, circuit plate, danger plate,
Erection of anticlimbing devices
Cost of earthing material
Watch & Ward of material
Engineering, Design, supply of line Material and accessories
200 mm² ACSR Conductor,(a) Alumunium=30/3 mm(b) Steel=7/3 mm Overall dia 21mm.Approximate Wt 976Kg/Km Ultimate breaking Load=89.67 KN;including 1.5%sag .
Mid Span Joints for conductor
Vibration Damper for conductor
Repairs sleeves for conductor
Aluminium Tape for conductor
Disc Insulators 90 KN,Ball & Socket type, 145mm height and 280mm dia. Creepage total 430 mm and 260 mm protected.12 No for D/C tension strings per tower @ 11 discs per string +10% for double string per tension tower
Double Tension Fittings
24 Fibre (DWSM) OPGW fibre optic cable
Tension assembly for passing through 24F OPGW
Tension assembly for joint box location
Tension assembly dead end
Vibration damper for 24F OPGW
Joint box for 24F
Down lead clamp assembly
Installation of insulator strings complete with necessary hardware , laying and stringing of ACSR Panther Conductor including fixing of conductor accessories and temporary anchoring of tower for the line.
Loading/unloading of Panther conductor and earth wire/OPGW cable seven drums for D/C
Carriage of ropes ,pulleys derrickpoles etcthrough 1.0 km avg.lead.
Loading of insulators & other fittings. .
Unloading of insulators & other fitting from Mech.Transport and carriage upto 0.50 mtrs.
Carriage of Insulators & other fittings beyond 50mtrs. Upto 1.0 Km
Loading of stringing equipment like compressor,turn table ,four sheeve pulleys,rollers etc
Unloading and stacking of material as per item above
Carriage of material as per item 7, () from road site to work site avg. lead 1.0 Km.
Laying of conductor to string 1st phase
Laying of conductor for subsequent string 5 for D/C
Installation of 24F DWSM OPGW along with associated fittings
Installation of joint box including splicing and testing of 24F
Stringing of panther condcutor 1 Km + 1.5% for sag for 6 phase including errection of insulator strings/fittings
Erection of jumpers at tension towers 6 No/tower.including earth wire
Making of compression joints earth wire @ 1 No. per km
Making of compression joints Conductor @ 6 No. per km
Making of compression type repair sleeves 1 No. per km of conductor i.e. 6 No. per Km
Route clearance/jungle clearance/branch cutting of 50% of area falling under conductors of double circuit line with 25 m wide corridor
Watch and ward of material during laying and stringing of conductor and earth wire/OPGW cable 7 wires/km for D/C
T&P Items
Portable(mobile) oil pump(1/2 HP Air pump 500-1000 gallons)
Telescopic ladder aluminium 6m height
Rechargeable 5W LED Hand torch
Manual crimping tool upto 400 sqm
Hydraulic bolt/wire cutter upto ACSR Moose with bits for cutting
Manila rope 1"& (3/4)"
Single sheave pulley open type(8 ton)
Rubber gloves 33 kV
Rain coat
Safety shoes hard tipped
Safety belt double lanyard without padded straps
Digital multimeter
Tong tester/clamp meter AC/DC
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
SBDPart2nt.pdf
Tender Documents • 1.51 MB
BOQ_972824.xls
BOQ • 0.43 MB
NIT12nt.pdf
Tender Documents • 0.25 MB
Download all tender documents and submit your bid