Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 LAccepted-AOC 36 137 THANGAMAPURIPATTINAM METTUR DAM 636 402 | SALEM | TAMIL NADU | 636402 | ₹1.0 L | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | SRI V M A ENTERPRISES L1 |
|---|---|---|---|---|
| 1.00 | Charges for Dismantling and Assembling of HT/LT Terminal links for 250MVA GT-II. | 1 | Nos | 26,595 ₹26,595 Lowest |
| 2.00 | Charges for Dismantling and Assembling of HT/LT Terminal links in 16MVA UAT-2A & 2B. | 1 | Nos | 13,297 ₹13,297 Lowest |
| 3.00 | Charges for Dismantling and Assembling of all the inspection covers, Checking tightness & healthiness of support insulators and internal cleaning of 15.75KV Bus duct of GT-II. | 1 | Nos | 28,660 ₹28,660 Lowest |
| 4.00 | Charges for Inspection & cleaning of Bus PT cubicle, SP cubicle and checking tightness of Bus PT& SP. | 1 | Nos | 9,553 ₹9,553 Lowest |
| 5.00 | Charges for Inspection and checking tightness of generator Phase & Neutral side links. | 1 | Nos | 9,553 ₹9,553 Lowest |
| 6.00 | Charges for Complete cleaning washing of Generating Transformer-II LAS porcelain housings, support insulators, GT HV Bushings, radiator banks & UAT 2A, 2B | 1 | Nos | 13,503 ₹13,503 Lowest |
| 7.00 | CRC 500ml | 2 | Nos | 406 ₹812 Lowest |
| 8.00 | Bolt & Nuts various sizes | 4 | Kgs | 155 ₹620 Lowest |
| 9.00 | Cost of Consumables | 1 | Nos | 1,638 ₹1,638 Lowest |
Tender Value
Refer Docs
EMD Value
₹1,000
Closing Date
29 Oct 2025, 2:00 pmClosed
CHIEF ENGINEER/MTPS-I
CHIEF ENGINEER MTPS-I METTUR DAM
MTPS-I ES Circle EM-I Unit-II Dismantling and reassembling of HTLT terminal links of generator Transformer-III, UAT - 2A UAT - 2B for conducting statutory testing of TG GT -II during Annual overhaul 2025
2025_EB_614214_1
CE-MTPSI-SE-ES-EMI-OT88-25-26
Open Tender
Electrical Works
Works
15 days
MTPS-I/METTURDAM
AS PER TENDER SPECIFICATION
4 documents required · 4 mandatory
₹0
₹1,000
Yes
16 Jul 2026
14 Oct 2025
30 Oct 2025
14 Oct 2025
29 Oct 2025
14 Oct 2025
Amount
Charges for Dismantling and Assembling of HT/LT Terminal links for 250MVA GT-II.
Charges for Dismantling and Assembling of HT/LT Terminal links in 16MVA UAT-2A & 2B.
Charges for Dismantling and Assembling of all the inspection covers, Checking tightness & healthiness of support insulators and internal cleaning of 15.75KV Bus duct of GT-II.
Charges for Inspection & cleaning of Bus PT cubicle, SP cubicle and checking tightness of Bus PT& SP.
Charges for Inspection and checking tightness of generator Phase & Neutral side links.
Charges for Complete cleaning washing of Generating Transformer-II LAS porcelain housings, support insulators, GT HV Bushings, radiator banks & UAT 2A, 2B
CRC 500ml
Bolt & Nuts various sizes
Cost of Consumables
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.77 MB
BOQ_733886.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].