| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.1 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹8.3 L+₹15,900.32 (1.96%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹8.5 L+₹38,206.52 (4.70%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹10.2 L+₹2.1 L (25.3%)Rejected-AOC | L4 | Rejected-AOC L4 |
Tender Value
₹11.4 L
EMD Value
₹11,439
Closing Date
18 Feb 2026, 5:00 pmClosed
EXECUTIVE OFFICER, BALUGAON NAC
BALUGAON NAC, BALUGAON, KHORDHA
Extension of Mini Park near Balugaon College in Ward No.02
2026_ORULB_125551_8
Balugaon.03/2025-26
Open Tender
Civil Works - Others
Percentage
45 days
OFFICE OF BALUGAON NAC
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,080
₹11,439
Yes
15 Oct 2026
6 Feb 2026
19 Feb 2026
6 Feb 2026
18 Feb 2026
6 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in hard soil with in intial lead and lift including rough dressing and levelling the bed etc. complete. | 50.06 | CUM | 276.9 | ₹13,861.61 |
| 2 | Filling in foundation and plinth with Quarry Rubbish (Crusher Dust) including quarring , collecting , conveying, supplying and watering incuding cost, conveyance,roylaty & taxes of all materials & cost of all labour, t & p etc. complete. | 121.88 | CUM | 1,208.1 | ₹1,47,243.23 |
| 3 | Filling in foundation and plinth with Sand including quarring , collecting , conveying, supplying and watering incuding cost, conveyance,roylaty & taxes of all materials & cost of all labour, t & p etc. complete. | 155.72 | CUM | 705.5 | ₹1,09,860.46 |
| 4 | Cement Concrete(1:3:6)using 4cm size B.H.G. (C.B.) Metal including cost, conveyance, royalty & taxes of all materials etc. complete. | 6.59 | CUM | 6,479.5 | ₹42,699.91 |
| 5.1 | R.C.C. M20 grade using 20mm and down graded size chips including cost conveyance etc. complete incl. centering & shuttering etc. complete (Column Base & Plint Beam) | 10.09 | CUM | 6,909.6 | ₹69,717.86 |
| 5.2 | R.C.C. M20 grade using 20mm and down graded size chips including cost conveyance etc. complete incl. centering & shuttering etc. complete (Column & Beam) | 4.64 | CUM | 16,984 | ₹78,805.76 |
| 6 | Supplying fitting fixing and placing uncoated HYSD bar reinforcement complete as per drawing and technical specification | 12.43 | Qntl. | 8,834 | ₹1,09,806.62 |
| 7 | Cement concrete (1:2:4) using 12mm. size c.b.b.h.g chips including cost of all materials etc. complete. | 10.15 | CUM | 8,021.6 | ₹81,419.24 |
| 8 | Brick work with Fly Ash Brick having crossing strength between 100kg/cm2 to149kg/cm2 in C.M.( 1:6) in foundation and plinth. | 16.02 | CUM | 4,319 | ₹69,190.38 |
| 9 | Brick work with Fly Ash Brick having crossing strength between 100kg/cm2 to149kg/cm2 in C.M.( 1:6) in super structure. | 16.99 | CUM | 5,010.4 | ₹85,126.7 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
DTCN.pdf
Tender Documents • 2.38 MB
BOQ_579434.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .