| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹5.9 LAccepted-Finance | L-1 | Accepted-Finance First Lowest | |
| 2 | L-2₹6.3 L+₹38,910 (6.60%)Accepted-Finance | L-2 | Accepted-Finance Second Lowest | |
| 3 | Rejected-Technical 0 GAURI PARGANA PURVI MATA MANDIR BIJNOR LUCKNOW UTTAR PRADESH 226008 | LUCKNOW | UTTAR PRADESH | 226008 | - | Rejected-Technical Required Documents are not submitted. | |
| 4 | Rejected-Technical | - | Rejected-Technical Required Documents are not submitted. |
Tender Value
₹6.3 L
EMD Value
₹6,500
Closing Date
16 Dec 2024, 4:00 pmClosed
Superintending Engineer
Electricity Distribution Circle Deoria
UNDER ADDITIONAL BUSINESS PLAN 2024-2025 INSTALLATION OF NEW DISTRIBUTION TRANSFORMER IN EDD DEORIA.
2024_PVVNV_971465_1
20/EDC(D)/2024-2025
Open Tender
Electrical Works
Turn-key
Electricity Distribution Division Deoria
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
Superintending Engineer
₹6,500
21 Dec 2024
7 Nov 2024
17 Dec 2024
7 Nov 2024
16 Dec 2024
7 Nov 2024
Amount
Under Additional Business Plan 2024-25 Installation of New 250 KVA T/F in Court Parisar (Van Vibhag) AE060 Loading, Unloading and safe carriage of following materials from Store Centre, Deoria to JE dump Store and JE dump store to work site with proper stacking:-
ST Pole 11 meter long
PCC Pole 8.5 meter long
ACSR Weasel Conductor
AB Cable(3x120+1x95+1x16) sqmm
Erection of Single PCC Pole
Erection of Double PCC Pole
Erection of Double ST Pole
Grouting of Pole
Earthing of Pole
Fitting of Stay complete
Fitting of TEE-Off Channel
Fitting of Top Channel
Fitting of Distribution Box
Carriage & Estabish of 250 KVA T/F Store to Work Site
Earthing of Transformer
Construction of plinth & Fencing size 1.75 x 1.50 x 1.50 mrt. And 0.25 mtr. Under ground brick wall far plinth of ratio sand and cement 6:1 and plastering by ration 5:1 feeling the peet by sand clay, brick blast and remaining if fixing M.S. Channel 02 no 50 x50 x 100 mm with standard space the top floor be made of RCC and left for quring for 7 days
Supply of Suspension Clamp
Supply of Nut & Bolt
Supply of Distribution Box Clamp
Supply of Dead End Clamp
Supply of Percing Clamp
Supply of End Cap for AB Cable
Supply of Eye Hook Clamp Insulated
Supply of LT Distribution Box
Supply of J Type Hook
Supply of Top/Tee off Clamp for PCC Pole
Under Additional Business Plan 2024-25 Installation of New 250 KVA T/F in Ahilwar Sonu Ghat (AE057) Loading, Unloading and safe carriage of following materials from Store Centre, Deoria to JE dump Store and JE dump store to work site with proper stacking:-
ST Pole 11 meter long
PCC Pole 8.5 meter long
ACSR Weasel Conductor
AB Cable(3x120+1x95+1x16) sqmm
Erection of Single PCC Pole
Erection of Single ST Pole
Erection of Double PCC Pole
Grouting of Pole
Earthing of Pole
Fitting of Stay complete
Fitting of TEE-Off Channel
Fitting of Top Channel
Fitting of Distribution Box
Carriage & Estabish of 250 KVA T/F Store to Work Site
Earthing of Transformer
Construction of plinth & Fencing size 1.75 x 1.50 x 1.50 mrt. And 0.25 mtr. Under ground brick wall far plinth of ratio sand and cement 6:1 and plastering by ration 5:1 feeling the peet by sand clay, brick blast and remaining if fixing M.S. Channel 02 no 50 x50 x 100 mm with standard space the top floor be made of RCC and left for quring for 7 days
Supply of Suspension Clamp
Supply of Nut & Bolt
Supply of Distribution Box Clamp
Supply of Dead End Clamp
Supply of Percing Clamp
Supply of End Cap for AB Cable
Supply of Eye Hook Clamp Insulated
Supply of LT Distribution Box
Supply of J Type Hook
Supply of Top/Tee off Clamp for PCC Pole
Under Additional Business Plan 2024-25 Installation of New 250 KVA T/F in Block Road (AE059) Loading, Unloading and safe carriage of following materials from Store Centre, Deoria to JE dump Store and JE dump store to work site with proper stacking:-
PCC Pole 8.5 meter long
ACSR Weasel Conductor
AB Cable(3x120+1x95+1x16) sqmm
Erection of Single PCC Pole
Erection of Double PCC Pole
Grouting of Pole
Earthing of Pole
Fitting of Stay complete
Fitting of TEE-Off Channel
Fitting of Top Channel
Fitting of Distribution Box
Carriage & Estabish of 250 KVA T/F Store to Work Site
Earthing of Transformer
Construction of plinth & Fencing size 1.75 x 1.50 x 1.50 mrt. And 0.25 mtr. Under ground brick wall far plinth of ratio sand and cement 6:1 and plastering by ration 5:1 feeling the peet by sand clay, brick blast and remaining if fixing M.S. Channel 02 no 50 x50 x 100 mm with standard space the top floor be made of RCC and left for quring for 7 days
Supply of Suspension Clamp
Supply of Nut & Bolt
Supply of Distribution Box Clamp
Supply of Dead End Clamp
Supply of Percing Clamp
Supply of End Cap for AB Cable
Supply of Eye Hook Clamp Insulated
Supply of LT Distribution Box
Supply of J Type Hook
Supply of Top/Tee off Clamp for PCC Pole
Under Additional Business Plan 2024-25 Installation of New 250 KVA T/F in Rajesh Gali, Telai Belwa (AE058) Loading, Unloading and safe carriage of following materials from Store Centre, Deoria to JE dump Store and JE dump store to work site with proper stacking:-
ST Pole 11 meter long
PCC Pole 8.5 meter long
ACSR Weasel Conductor
XLPE Cable 1x240 sqmm
Erection of Single PCC Pole
Erection of Single ST Pole
Erection of Double PCC Pole
Grouting of Pole
Earthing of Pole
Fitting of Stay complete
Fitting of TEE-Off Channel
Fitting of Top Channel
Carriage & Estabish of 250 KVA T/F Store to Work Site
Earthing of Transformer
Construction of plinth & Fencing size 1.75 x 1.50 x 1.50 mrt. And 0.25 mtr. Under ground brick wall far plinth of ratio sand and cement 6:1 and plastering by ration 5:1 feeling the peet by sand clay, brick blast and remaining if fixing M.S. Channel 02 no 50 x50 x 100 mm with standard space the top floor be made of RCC and left for quring for 7 days
Supply of V Type X Arm
Supply of F Bracket
Supply of Stay Clamp
Supply of Stay Insulator
Supply of Suspension Clamp
Supply of PG Clamp
Supply of Eye Hook
Supply of J Type Hook
Supply of Top/Dropper/Tee Off
M/s VIRENDRA KISHOR PANDEY (BID ID -4733715)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .