| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.6 LAccepted-AOC NO 5 NMK COLONY 1ST CROSS TRICHY 620020 | TRICHY | TRICHY | TAMIL NADU | 620020 | L1 | Accepted-AOC L1 bidder | |
| 2 | L2₹10.0 L+₹47,092 (4.93%)Rejected-AOC | L2 | Rejected-AOC L2 bidder | |
| 3 | L3₹10.9 L+₹1.4 L (14.2%)Rejected-AOC | L3 | Rejected-AOC L3 bidder |
| Sl No | Description | Qty | Unit | SSM ENTERPRISES L3 | SAKTHIVEL L1 | B.MOHANRAJI L2 |
|---|---|---|---|---|---|---|
| 1.00 | Desilting of sand and silt under water (SS20 B ) Earth work excavation and depositing on bank with initial lead and lift etc complete | 4,170 | M3 | 4,79,550 ₹5,65,869 | 3,33,600 ₹3,93,648 Lowest | 4,71,210 ₹5,56,027.8 |
| 2.00 | Removal of excavated sludh and silt including all labour charges and other conveyance etc complete 5 Km away from the work site | 2,730 | M3 | 3,00,300 ₹3,54,354 | 5,13,240 ₹6,05,623.2 | 2,82,555 ₹3,33,414.9 Lowest |
| 3.00 | Dismantling exisisting RCC works including dismantling,clearing away and carefully stacking materials useful for re-use for any thickness of walls etc complete as per standard specification | 13 | M3 | 59,800 ₹70,564 | 45,578 ₹53,782.04 Lowest | 55,965 ₹66,038.7 |
| 4.00 | Manufacturing, supplying and fixing Precast Reinforced Cement Concrete slabs of following thickness in RCC M20 concrete using following HBGS jelly excluding cost of reinforcement steel in position but including cost of moulding charges, casting of slab, finishing, curing and fixing in position in all floors etc., complete complying with standard specification and as directed. | 126 | M2 | 2,52,000 ₹2,97,360 | 63,504 ₹74,934.72 Lowest | 1,93,284 ₹2,28,075.12 |
Tender Value
₹12 L
EMD Value
₹12,000
Closing Date
3 Sept 2026, 3:00 pmClosed
The Commissioner , Tambaram City Municipal Corpora
1, Muthuranga Mudali St, West Tambaram, Tambaram, Chennai, Tambaram, Tamil Nadu 600045
Desilting of Existing Storm water drains and disposal drains to Ward No. 34, 43 and 44 in Zone -3
2026_DMA_698328_2
168/2026/E1
Open Tender
Civil Works
Item Rate
Zone 3
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹12,000
13 Oct 2026
27 Aug 2026
3 Sept 2026
27 Aug 2026
3 Sept 2026
27 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | GST % |
|---|---|---|---|---|---|---|
| 1 | Desilting of sand and silt under water (SS20 B ) Earth work excavation and depositing on bank with initial lead and lift etc complete | 4,170 | M3 | - | - | 18% |
| 2 | Removal of excavated sludh and silt including all labour charges and other conveyance etc complete 5 Km away from the work site | 2,730 | M3 | - | - | 18% |
| 3 | Dismantling exisisting RCC works including dismantling,clearing away and carefully stacking materials useful for re-use for any thickness of walls etc complete as per standard specification | 13 | M3 | - | - | 18% |
| 4 | Manufacturing, supplying and fixing Precast Reinforced Cement Concrete slabs of following thickness in RCC M20 concrete using following HBGS jelly excluding cost of reinforcement steel in position but including cost of moulding charges, casting of slab, finishing, curing and fixing in position in all floors etc., complete complying with standard specification and as directed. | 126 | M2 | - | - | 18% |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.52 MB
BOQ_839423.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .